ML20033A261

From kanterella
Jump to navigation Jump to search

Notice of Issuance & Availability of Amend 87 to License DPR-57
ML20033A261
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/13/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20033A259 List:
References
TAC-47092, NUDOCS 8111250048
Download: ML20033A261 (2)


Text

.

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-321 GEORGIA POWER COMPANY, ET AL.

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 87 to Facility Operating License No. DPR-57, issued to Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Association of Georgia, and City of Dalton, Georgia, which revised Technical Specifi-catiens for operation of the Edwin I. Hatch Nuclear Plant, Unit No.1 (the facility) located in Appling County, Georgia. The amendment is effec-tive as of the date of issuance.

The amendrent revises the Technical Specifications to enable opera-tien of the Plant after the replacement of 168 fuel assemblies. Thi3 fuel replacement does not constitute a reload and was made necessary by fuel leakages occurring after the June 21, 1981, restart from the Cycle 5 reload outage.

The ap;11 cation for the amencment complies with the standards and recuirements of tne Atomic Energy Act of 1954, as amended (the Act), and The Commission has made appropriate the Comnission's rules and regulations.

findings as recuired by the Act and the Commission's rules and regulations Prior in 10 CFR Chapter I, wnich are set ;urth in the license amendment.

,ne amendment does public notice of this amendment was not required sinct not involve a significant hazards consideration.

8111250048 811113 PDR ADOCK 05000321 P

PDR

. 7590-01 The Comission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR Section 51.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amercrent.

For furtrer ce: ails with res;ect to this action, see (1) the applica-tion for arencren: cated October 27,1081, (2) 3. mend ent No. 87 +s Licensa fio. CPR-57, anc (3) the Commission's related Safety Evaluation. All of tnesa items are available for public inspection at the C0 mission's Public Occurent Room,1717 u Street, N. W., Washington, D. C., and at the Applinc Ccunty Public Litrar;, 3D1 City Hall Drive, Baxley. Georgia 31513. A cooy of iters (2) anc (3) may be obtained upon request addressed to the U. S. fiuclear Regulatory Cc=ission, Washington, D. C.

20555, Attention: Di rector. Division of Licensing.

Cated at Ee:nesca, varyland. Inis 13th day of November 1981.

FOR THE NUCLEAR REGULATORY COMMIS510N n

~L / ~,W y' x chl

, Gl_.%

~

)

.s ohn F. Stolz, Chief

.s 0;evating Reacters Srancn n Division of Licensing