ML20033A243

From kanterella
Jump to navigation Jump to search

Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures F3-5 Re Emergency notification,F3-12 Re Emergency Exposure Control & F3-13 Re Offsite Dose Calculation
ML20033A243
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/11/1981
From: Mayer L
NORTHERN STATES POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20033A239 List:
References
NUDOCS 8111250020
Download: ML20033A243 (1)


Text

.

'('r Northern States Power Company

---p)

/Y s

~

~

y, 1

GIl "o..

414 Nicollet Mall unneapons.unnesota 55401

  1. '6 a,.e.

G8f ~ -

Telephone 1612) 330-5500 pQ Miss*&<m

. %(

TUh'd November 11, 1981 Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555

'" ~

PRAIRIE ISLAND NUCLEAR GENERATING PLMT Docket Nos. 50-282 License Nos. DPR-42 50-306 60 EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES Furnished with this letter are ten copies of revisions to the Prairie Island Plant Emergency Plan Implementing Procedures.

The revisions include the following procedures:

TABLE OF CONTENTS REV 3 F3-5 EMERGENCY NOTIFICATION REV 2 F3-6 ACTIVATION AND OPERATION OF TECHNICAL SUPPORT CENTER RLV 1 F3-7 ACTIVATION AND OPERATION OF OPERATIONAL SUPPORT CENTER REV 1 F3-12 EMERGENCY EXPOSURE CONTROL REV 1 F3-15 0FFSITE DOSE CALCULATION REV 1 F3-14 ONSITE RADIOLOGICAL MONITORING REV 1 F3-20 MANUAL DETERMINATION OF RADI0 ACTIVE RELEASE CONCENTRATIONS REV 1 F3-21 ESTABLIC3 MENT OF A SECONDARY ACCESS CO?.' TROL POINT REV 2 F3-23 DIERGENCY SAMPLING REV 1 For reasons of privacy and plan effectiveness, we have deleted telephone numbers and names contained in these procedures.

L 0 Mayer, PE Manager of Nuclear Support Services LOM/CDH/bp Encls S

cc J G Keppler (w/ attachment.) (3)

/ /D NRC Resident Inspector (w/o attachment)

G Charnoff (w/o attachment)

I 8111250020 811117 PDR ADOCK 05000282 F

PDR

.