ATTACHMENT 1 s
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD _
In the Matter of PACIFIC GAS AND ELECTRIC COMPANY Docket No. 50-133 HUMBOLDT BAY POWER PLANT (Amendment to facility operating UNIT NO. 3 license)
AFFIDAVIT OF TOLBERT YOUNG JR.
STATE OF CALIFORNIA
)
COUNTY OF CONTRA COSTA
)
SS I, Tolbert Young Jr., being duly swoi n do depose and state as follows:
1.
I am employed by the U.S. Nuclear Regulatory Comission in the Office of Inspection and Enforcement, Region V, Walnut Creek, Cali fornia. My professional qualifications are attached.
2.
I am Chief, Reactor Projects Section 2 of the Reactor Operations Project Branch, and have responsibility to direct the regional inspection program in the area of reactor operations at nuclear power plants, research and test reactors.
I am the direct supervisor of reactor operations inspectors who have inspected the Humboldt Bay Power Plant.
3.
I have read the Atomic Safety and Licensing Board's Memorandum and Order, dated October 21, 1981, regarding "Humboldt Bay Power i
Plant Unit No. 3 - Amendment to Facility Operating Lic.ense".
Regarding Board Questions Number 2 ("Are applicable regulatory requirements currently being met by licensee?") it is my professional opinion, based on the inspections performed at the facility and with the exceptions of identified items of noncompliance or exemptions granted by NRC-NRR, that the licensee is currently meeting applicable regulatory requirements. The exemptions that I am aware of are described in Mr. Vernon Rooney's testimony,to be filed t
November 19, 1981.
8111230358 811119 DR ADOCK 05000133 PDR
i 2
t 4.
I have read the Declarations of Vernon Rooney, submitted in these i
proceedings r.nd concur with the opinions and conclusions stated in each of the declarations.
I attest that the foregoing affidavit is true and correct to the best of my knowledge and belief.
e l
'I Y? Y _
4 r
Tolbert Joung Jr.'
Subscribed and sworn to before me thi s /J' /^ day of N ' *J ' -, 1981 7\\
(iJeMllfllllfillliHf 8tlif fillllittleillHfHIultttS
[ < ; 4.:.
.'(-(,T'J _)Adh; gj ~
- .l '.f.'fi$.
JANEY S. ANDEi 5Off 5 i
/.,
Notary PubTlc D.. #'7' N o'^* ' avauc c^' n oa ^
CONTRA CL,5T A CoureTY t;
My Comm. Espires Dec. 7,1984 f
$,:..nu' ','in n.n.unniniur.uinueuununun ij c
My Comision expires: O 7.d 4 d
I f
nw
.,.m
,--,.a,a
,e, w._,--
,.,n_,,.
,--.m---.
.n---
- - _ - - _ = -
Tolbert Young, Jr.
Professioia'l 0TalifTcations
~
~
Region V - Walnut Creek, California Office of Inspection and Uiforcement My name is Tolbert Young, Jr.
I am a Reactor Inspector with the Office of Inspection and Enforcement, assigned to the Walnut Creek, California i
Regional office.
I have a Master of Science Degree in Teaching in Mathematics.
I received a B.A. in Mathematics and Physical Sciences from George Washington University in 1966 and my Masters from American University in 1968 - both schools are located in Washington, D.C.
I have a Professional Engineer certification in Nuclear Engineering from the State of California.
I served 20 years in the U.S. Army, retiring in 1971.
In 1961, I attended the U.S. Army Nuclear Power Plant Operators' Course.
For the next ten years, I served in different capacities throughout the Army's Nuclear Power Program, qualifying as Equipment Operator, Contiol Room Operator, Shift Supervisor and Plant Superintendent.
In 1966, I was appointed to the Training Division of that program and served in progressively more responsible positions until 1969 when I was appointed as CLief Instructor of that Division.
In my capacity as Chief Instructor, I was responsible for the training of students and operators in all phases of nuclear power plant operations and mainterance.
In June 1971, I joined the then Atemic Energy Comission as a Reactor Inspector in the Region I, Newark, New Jersey Office.
Since that time, I have been the principal inspector for over 15 research, test and power reactor facilities.
From August 1972 to March 1974, I was assigned as principal inspector for the Vermont Yankee, Pilgrim 1 and Millstone 1 facilities, all Boiling Water Reactors (BWR).
In June 1974, I was assigned as principal inspector for Diablo Canyon and was appointed resident inspector there in August 1978.
In March 1981, I was reassigned to the regional office and became the principal inspector for San Onofre 2 and 3.
In August 1981, I was promoted to my present position as Chief, Reactor Projects Section 2, Reactor Operations Project Branch.
I have received the following special training:
1.
Fundamentals of BWR Plant Operations 1972 2.
BWR Technology 1973 3.
Pressurized Water Power (PWR) Reactor Facilities 1974 4.
PWR Refresher Training 1975 5.
PWR Simulator Training 1976 6.
BWR Facilities 1976 1
ATTACHMENT a
(
ESULTS' 0F INSPECTION EFFORTS IN 1980_ AND 1981 AT _HU?.30LOJ _ BAY _
(CN 50-133)'
Inspection of Inspection Functional Area Dates Manhours R,epo,r_t Nos.
_Resul ts Operational 5/20-22/80 34 50-133/80-02 Clear _
g 10/25-24/81 23 50-133/81-05 Clear Safegua rd s-11/19 ?l/79 18 50-133/79-03 Clear 12/15-18/80 32 50-133/80-05 Clear 4/,06-09/81 27 50-133/81-02 Clear
.Meterials 8.
. 4.+ !.7.L.:<
Accountability.
5/08-09/81 c-D ~24 50-133/81-01. Clear j
. t,.t
,. ~
- A,' l.~
. s.4
> - Scalth 3/24-28/80
~~ 38 50-133/80-0)
Infraction - Failure'-
Physics 1'
't-to post high radiation
~-
s.
area.
.'.. g Infraction - Failure to
=
i,ja. r.
control access to high
~
- p ?.',y) r radiation area.3 ;.
- ', '
-L Deficiency - Failure to i:; ?j:.
1cbel container...
- 12/01-05/80 t
60 50-133/80-04 Infraction - Failure tc complete shipping papers.
8/29 - 7/2/81 34 50-133/81-03 Viol,ation - Severity Level V - Liquid waste system vent mon.itor set to alarm at 100 mr/hr instead of 10 mr/hr.
Special:
11/10/80 5
50-133/80-03 Clear To. Examine t
i Effects cf l
Eartbavake l
Other:
38 50-133/81-04 Clear Indeper. dent 10/17-22/81*
Inspection:
Measurement Verification-(* Announced inspection - all others were unannounced.)
l
,