ML20032E769
| ML20032E769 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 11/02/1981 |
| From: | Pliml G COMMONWEALTH EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20032E767 | List: |
| References | |
| NUDOCS 8111230016 | |
| Download: ML20032E769 (2) | |
Text
,
EPIP 330-1 (Types)
~
'fov.
?, 1981 Date Ax
^
M=.
S's-Y 8 You have copy (s) No. So-M of the Zicn Staticn:
I'HI - Fuel Handling Precedure
/[
,s SOI - Cpera'd"g Procedure jf n*
g
\\
EOP - Emergency Cperating Procedure g sf J
GCP - General Cperating Procedure 5
i TSS - Te+"ical Staff Surveillance fi NOVO 91981*
ZAP - Ad "Mistrativa Procedure
- ,,,, a ZCP - Chemical Procedure comussen j
RP - Radiaticn Protection P ccedure "J
/
MI - Maintenance Precedure ZQP
,Zica Quality Precedure W
/
/m ACP - Abnormal Cperating Procedure ZSP - Security Plan & Secuqity Precedure PT - Cperating Sc veillance Test Tech Spec. - Technical Specification Curve Ecck Annu=ciator Response Manual Refueling Master Procedura & Fuel Evaluation Precedura
.j GSEP - Generating Station Emergency Precedura
-j X
EPIP - Emergency Plan Implementing Procedure
~t FSAR - Final Safetf Analysis Report ZID - Zica Electrical Disuributics 7
3 Please achscwledge receipt of tha prcesdure er revisions indicated above and retu=n this receipt to Ms. M. A. I.ePage, Zicn Statien.
- Please replace EPIP 330-1, pg. 2 due to types.
November 2, 1981
/
/
1; G. Pl:.m1 6
Procedure er revisions' indicated above received:
Daue N.
PDR ADOCK 05000295 Nd
- F
__ __ P DR 3 g\\..
d
+
m.-
e-----
=
.-... ~
i 7
s.
1 f.
November 2, 1981 TO: EPIP BOOK HOLDERS Please replace EPIP 330-1 page 2 with the attached due to typos.
i I
If there are any questions call Mike Ghisir.in, X-269, Zion.
I i
i I
1 I'
1 i
l t
i I
i f
i-6 i
3 I
t r
'M I-my p W,--wr-mm
-s'-Ww
- gf gwyn ty h w+
w-gapgyd94gyv+--M-wv-9yymweq r
.wwum-ww (yqw%g=ym.n-y.nt-e-r 4--4.-
w-e.-m61-w w we Mee*N9- - - -
-wi'