ML20032E684

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-054/04T-0 & 81-055/04T-0
ML20032E684
Person / Time
Site: Cook 
Issue date: 11/11/1981
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20032E685 List:
References
NUDOCS 8111200808
Download: ML20032E684 (1)


Text

,

I

)4 0JA

'g y~~L IN01ANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 4654901 g

A 6

fH.s November 11, 1981 I

I L: NOV19199;

% ~f Mr. J.G. Keppler, Regional Director

      • - Q g rosa Of fice of Inspection and Enforcement 2-D Q,g (M.

United States Nuclear Regulatory Commission N

Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

Pursuant to the requirements of the Appendix B Technical Specifications, the following report /s are submitted:

AE0 81-054/04T-0 AE0 81-055/04T-0.

S incerely, D.V.

Shaller Plant Manager

/bab cc:

J.E. Dolan R.S. Hunter R.W. Jurgensen R.F. Kroeger K.J. Vehstedt E. Swanson/N. DuBry RO:III R.C. Callen MPSC G. Charnoff, Esq.

J.M. Hennigan W. Lavallee EPRI INPO PNSRC J.F. Stietzel E.L. Townley Dir., IE (20 copies)

Dir., MIPC (2 copies)

Directorate of Licensing 808 e3333 g ggg DR cn osooog,3 ggy i

s g

PDR

[ [ dcA h

\\