Text
.
a ~*-~c y
{
ea
~-
)
, ~ ~ * -' s. ; m,._,_.; ;
e
+..
s 2 0 FEB 1981 A
Dock t No. 99900267/81-01
.f= ' w.:
y i s
- \\
q N[4
~'L,'., Q c.
i J'
Tube Turns Division of Chemetron
~
Houston Plant
-a
.m C NOV19198k -8 4~" ?
Mr. Martin McCrary O
Manager Plant Quality' V : ~
h(
Atta:
7100 Katy Rd., P.O. Box 393 Houston, Texas 77001 011er of this Gentlenen:
This refers to the QA Program inspection conducted by Mr. R. E.
Texas, associated of your facility at Houston,s of our findings office on January 19-23, 1981, i
with the manufacture of welded piping and to the d i
f the inspection.
QA This inspection was made to confirin that, in the areas inspected Prteram is being effectively implemented.
ustem r are being to assare that unique quality requirements imposed i
lity. As you know, the provided by you to your custasers, is of acceptable qua ibility for the NRC requires each of its licensees to assume full respons red from others.
quality of specific products, components or services procu ts you from You should therefore not conclude that the NRC f tive cor-rective action in response to their findings.
t Within Areas examined and our findings are discussed in the enclosed r these areas, the inspection consisted of an exam tions by the l
QA program inspector.
During the inspection it was found that the implementation of you l
es to this letter.
failed to meet certain NRC requirements.to the pertinent req l
his letter Please provide us within twenty-five (Z5) days of the date of t h t have been or a written statenent containing (1) a description of steps t aof steps i
will be taken to correct these items, (2) a descript o rrective actions and preventive measures were or will be completed.
, h' i i
- 'I A,g\\
8111200516 810220 DESIC"ATD oIIICIHlL b
99900267
- tMod By dfhq g
],
"l etter7 ollins OFFECEf $$$.
- OfdQ, g(,, g 7 gv otapovs sunmc)j RE0ller.
.18arnes.
I
{
~
y-
~~
<a v L -
P'iff.jpMff(($9";N@:yy,:.zy.m-m
.s Tube Turns Division of Chemetron 2
In accordance with Section 2.790 of the Consiission's " Rules of Practice,"
Part 2 Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply,-together with the enclosed inspection report will be
~
- placed in the Comerission's Public Document Room. If this mport contains any
~
', "infomation that you believe to be proprietary, it is necessary that you make-
'.: a written application within twenty-five (25) days af the date of this letter The appli-
- . tot this office to withhold such infomation from public disclosure.
- cation must include a full statement of the reasons why it is claimed that the infomation is proprietary. The appifcation should be prepared so that any proprietary information identified is contained in an enclosure to the applica-
~
. tion, since the application without the enclosure will also be placed in the If we do not hear from you in this regard within the Public Document Room.
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased -
to discuss them with you.
Sincerely, t
c, -
'v e,
--r 7
~. */ 2,
~
v.
C '_
Didis Potapovs, Chief
~ ~ '
~
~2_
_, -S Vendor Inspection Branch
(
Enclosures:
- l. Notice of Nonconfonnance 1
2.
Inspection Report No. 99900267/81-01
~.. c, 4
bCC:
4 'A
.~'
Chief, V&SPB, DR&RRI, HQS (Retnmuth)
IE FILES NRR:DPM:QAB
~
REG. Directors I, II,. IIT & V PDR HQS
~
CENTPAL FILES WEVETTER, RIV ASME NBB&PVI i
- ~., _-