ML20032E357

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Oct 1981
ML20032E357
Person / Time
Site: Surry  
Issue date: 11/13/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20032E358 List:
References
632, NUDOCS 8111200459
Download: ML20032E357 (1)


Text

.

VIRGINIA Ex.zerRIc Awp POWER COMPANY

6. d b. l Riemioxn, VIRGINIA 20 261 NOVl 9 l* 8 i v.s.eug g #

November 13, 1981 r-D R. H. Lusi.2irmo

'o

,b Vaca Pusmanant h

^p Wuctuan OranArrone f6 Mr. N. M. Haller, Director Serial No. 632 Office of Management and Program Analysis N0/RMT:acm U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32 DPR-37

Dear Mr. Maller:

Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the ronth of October.

Also included in this report is a corrected page for a previou,1y submitted report. This page is marked CORRECTED PAGE.

In reference to the Surry Power Station spent fuel storage facility the following information is provided.

Maximum Storage Capacity 1044 Assemblies Number of Assemblies in Storage 567 Assemblies Unused Storage Locations 477 Locations In March 1985, Surry will lose full core offload capability.

In April 1987, Surry Unit I will experience first loss of full power capability and April 1988 for Unit II.

Very truly yours.

y OA. Tbd R. H. Leasburg Enclosure (3 copies) cc:

Mr. Victor Stello, Dirictor (10 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)

Office of Inspection and Enforcement - Region II Mr. Maurice R. Beebe fa l

Office of Management and Program Analysis 6

O$bbb PDR

,