ML20032D757
| ML20032D757 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 11/10/1981 |
| From: | Jones G TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20032D758 | List: |
| References | |
| NUDOCS 8111170453 | |
| Download: ML20032D757 (1) | |
Text
+, '
L52 811110 982 3rowns Ferry Nuclear Plant P..O. Box 2000 Decatur, Alabama 35602 NOV 101981 Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 centlemen:
Enclosed is the October 1981 MontHy Operating Report for Browns Ferry Nuclear Plant Units 1, 2, and 3.
d)
A 8
Very truly yours, gs I ~Q0L.lJL
,h
( t> '
J U
-91 TEN:'ESSEE VALLEY AUTil0RIn
% "*4;pronNOV1e t
@d G. T. Jones i
Plant Superintendent g
j f6 DCM:EE Enclosure cc: Director, Region II Mr. Bill. Lavalce Nuclear Regulatory Commission Nuclear Safety Analysis Center (NSAC)
Office of Inspection and Enforcement P. O. Box 10412 i
101 Marietta Street Palo Alto, CA 94303 i
Atlanta, GA 30303 (1 copy)
I i
ARMS, 640 CST 2-C Director, Office of Inspection J. P. Delong, 1200 CUBB-C and Enforcement G. H. Kimmons, W1249 C-K l
Nuclear Regulatory Commission L. M. Mills, 400 CST 2-C Washington, DC 20555 (10 copies)
H. N. Culver. 249A 11BB-K C. L. Breeding, 1270 CST 2-C Mr. A. Rubio, Director "A. T. Mullins, 403 LB-C Electric Power Research Institute T. G. Campbell, 1760 CST 2-C i
[
P. O. Box 10412 H. G. Parris, 500 CST 2-C l
Palo Alto, CA 94304 i
I This was principally prepared by D. C. Mies.
f 6s N
$5E'EIS$Aofibbig; PDR l
i I
-