ML20032D648
| ML20032D648 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 11/03/1981 |
| From: | Myrabo A NORTHERN STATES POWER CO. |
| To: | |
| Shared Package | |
| ML20032D644 | List: |
| References | |
| NUDOCS 8111170354 | |
| Download: ML20032D648 (4) | |
Text
1 1
i AVERAGE DAILY UNIT POWER LEVEL
]
DOCKET NO.
50-263__.___
UNIT Monticello__,
DATE 11-3-31..___.
COMPLETED BY A.
L. Myrabo' TELEPHONE 612/295-5151:
l MONTH ______0CTOBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
l (MWe-Net)
(MWe-Net)
I i
__________546____________
17
__..._______547____________
r I
2
__________541____________
18
__________546____________
3
__________536____________
19
__________540____________
4
__________487____________
20
__________548_.__________,
5
__________548____________
2i
__________550_______
O I
6
__________547____________
.c 2
________..__549____________
l l
7
__________550____________
23
__________344_____________
8
__________548____________
24
__________ -4 ____._______
9
__________550____________
25
-3_____________..
I 10
__________551______.______
26
-3____________
11
________.._544____________
27
-3_______.__..__
l 12
________550____________
28
-3_________.__
13
_________._550_____________
29
__________-3_____________
l 14
__________548____________
30
-3____________
l l
15
__________550____________
31
-3____________
t 16
.__________550____________
INSTRUCTIONS On this format, List the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
~
8111170354 811112 PDR ADOCK 05000263 PDR R
'4 4
I OPERATING DATA REPORT i
l i
i
(']
DOCKET NO.
50-263______l
\\/
DATE it-3-81____l COMPLETED DY A. L.
Myrabol I
TELEPHONE 612/295-5151l 4
1 OPERATING STATUS
____________________________)
l Notes I;
1.
Unit Name
________________________MonticeLlo l
ll j
2.
Reporting period:. _________________ OCTOBER l
I; i
- 3. Licensed Thermal Power (MWt)
_.___________1670 l
I) l 4.
Nameplate Rating (Gross MWe):
_____________569 l
lI
{
5.
Design Electrical Rating (Net MWe)'
_____545.4 l
l!
6.
Maximum Dependable Capacity (Gross MWe): __564 l
ll 7.
Maximum Dependable Capacity (Net MWe)
____536 l_.______________.._________ll 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last l
Report, Give Reasons:
__N/A____________________________________..________(
9.
Power Level To Which Restricted, If Any (Net MWe)'
___N/A__________..__.._____,
- 10. Reasons For Restrictions, If Any:
__N/A_____________________________________'
i i
This Month Yr.-to-Date Cumulative.
- 11. Hours In Reporting Period
_____745
_____7276
____ 90625;
- 12. Number Of Hours Reactor Was Critical
___548.0
___6(16.6
__ 74935.6:
- 13. Reactor Reserve Shutdown Hours
_____0.0
_____ O.0
_946.7l
- 14. Hours Generator On-Line
___546.1
____6362.6
__ 73209.7:
- 15. Unit Reserve Shutdown Hours
_____0.G.
______0.0
_ _ _ _ _ _ _. 0. 0 '
- 16. Gross Thermal Energy Generated (MWH)
_ 899242
_i0058822
_119682342l
- 17. Gross Electrical Energy Generated (MWH) __307142
__3410186
__38005377;
- 13. Net ElettricaL Energy Generated (MWH)
__295140
__3262256
__36348259'
- 19. Unit Service Factor
__ 73.3%
___ 87.2%
_____ 80.8%l
- 20. Urii t Availability Factor
__ 73.3%
___ 87.2%
____ 80.8%
- 21. Unit Capacity Factor (Using MDC Net)
__ 73.9%
___ 83.4%
_..__ 74.8%
- 22. Unit Capacity Factor (Using DER Net)
__ 72.6%
___ 82.0%
____ 73.5%
- 23. Unit Forced Outage Rate 0.0%
i.3%
6.1%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Durat ian o f Each)
__May 28, 1982 - Refueling Outage - 35 days ____________ __.__ _____________
l
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:_.12-4-Bi___.
- 26. Units In Test Status (Prior to Commerc i a l Operat ion): N/A Forecast Achieved l l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
D>
x-1
l NARRATIVE FUMMARY OF OPERATING EXPERIENCE i
I DOCKET NO.
50-263______
DATE 10 -- 1-81____
COMPLETED BY A. L.
Myrabo TELEPHONE 112 398151Si i
MONTH ______ SEPTEMBER _______
l l
OCT03ER 10- i-81 to Power operation.
i0-22-81 l
10-23-81 to Scheduled, orderty shutdown for FALL waintenance outage.
I 10-31-81 l
I l
t i
l f
I i.
t i
O t
l r
f i
{
l I
i h
'l I
t
/
l Note: Power operation defined as essentially 100% of 1ated power except for weekend load drops for spec i f i ed surve i l lance testing.
i c
i e
l l
k
.___,p.
y
y I
h f
k v)
V ;
nj O
UNIT SilUlDOWNS AND POhER REDUCTIONS DOCKET NO. 50-263 UNIT N A%1E Monticello DATE 11-3-81 REPOR I MON O g October CON 1PLETED BY A.
Myrabo TELEPilONE 1!2/295-5151 l
-u:
=%
=?
4E4 E h ensee 5 -t.,
2
=
E (ause & Correctne No Daic
- - l 3~
ji5 Esent 7
s.?
Atnan t.,
E
.-i
~p Repor' EU 5 '-
Present Recurrence
,E f
u c5 16 10-23-81 S
193.9 B
1 N/A 7,ZZZ ZZZZZZ Schedul J, orderly shutdown for Fall maintenance outage.
I 3
4 F-Forced Reason:
Method:
Edubit G - Instructions S: Sched uled A Equipment Failure (Exrlain)
! Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Enu$ Sheets for Licensee C. Refueling 3 Automatic Scram.
Eseni Report (LER) File (NUREG-D-Regulatery Restriction 4-Other (Explain )
0161)
E-Operator Training & License Esamination F Administrate.e 5
G-Orstational Error (Explain)
Exhibit 1 - Same Source (9/77)
Il-Other ( E splain t