I dh VIRGINI A EI.ec rHIC AhD Pown RicitxoNu, VINGINIA 20 261 1
81 NOV 4 A9: 59 R. HlE AWBt' MG October 29, 1981 Vaca Paumsomar Na:ctzAm OrmuAtsons Mr. James P. O'Reilly, Director Serial No. 604 7
i Office of Inspection & Enforcement PSE&C/ RIM:lmf U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Region II 50-281 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 License Nos. DPR-32 DPR-37.- m
.. ; \\ [ - h h/.
O
%/ o.
- y#ff/!/. i
Dear Mr. O'Reilly:
-l /,Ig.i 6133 I. E. Bulletin No. 80-11, Masonry Wall Design W
lt
[g Surry Power Station - Units 1 & 2 s
c s
Enclosed is our final report on I. E. Bulletin No. 80-11 activities at Surry Power Station. he reanalysis indicated in our letter of August 25, 1981 has been completed and the results are included in our final report. his report provides the results of the masonry wall g
reevaluation program and provides documentation updatirg our previous 3
submittals. Rather than being comprehensive and resubnitting information previously provided, this report contains a stmanary of the masonry wall review program and references our previous submittals where more detailed infor: nation has been provided.
In summary, the analysis results of the masonry wall reevaluation program for Surry show that 79 walls were acceptable, two walls were 1
acceptable after equipment was removed from the wall, 31 walls were modified, and 7 walls were not acceptable. All of the walls found not to meet the reevaluation criteria required by IE Bulletin 80-11 are located in the Fuel Building. Failure of these walls under extreme seismic or tornado loadirs would not jeopardize any safety-related equipment as s
covered by the Station %chnical Specifications limiting conditions for operation. he analysis results for the 7 Fuel Building walls were 4
sutmitted to the NRC in Licensee Event Report No. 81-020/03L-0 by our 4
letter of August 21, 1981, Serial No.81-047. Our future correspondence on this subject will be in response to the LER rather than I.E.Bulletin 80-11.
l 8111170338 811029' PDRADOCKOSOOOg ren al
.s.
vtaotxtA EuCTRIC AND Powen ConANY TO Mr. James P. O'Reilly, Director Should you have any questior.s or require additional information, please contact us.
Very truly yours,
\\
'r. H. Ieasburg Enclosure cc: Mr. Victor Stello, Director Office of Inspection & Enforcement I
I l
t
~
l I
I l
l
w COMMONWEALTH OF VIRGINIA )
)
CITY OF RICHMOND
)
~~
The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R. H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 47 day of O, 19 8/.
My Commission expires:
4-A4
, 19 2 f.
d.DYN Notary Public 1
1 (SEAL)
. _ _ _. -