ML20032D585

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1981
ML20032D585
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 11/06/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20032D575 List:
References
NUDOCS 8111170286
Download: ML20032D585 (9)


Text

..

AVERAGE DAll.Y UNIT POWER LEVEL DOCKET NO.

50-250 Turkey Point

' WIT uit ug, 3

n DATE November 6 - 1981 CO%1PLETED BY V.T. Chilson TELEPil0NE (305) 552-3666 510NTil October 1981 DAY-AVER AGE DAILY POWER LEVEL DAY

. AVERAGE DAILY POWER LEVEL (N!he Net)

(5twe. Net) y 2

gg 3

19 4

20 6

22 7

23 3

9

,3 10 26 gg 1.,,

23 13 29 g4 15 3

I6 INSTRUCTIONS On this tonnat.lar the userage daily unit power leselin stWeE t l'or each day in the rep,nting in.inth.C. impute to the nearest whole nwgasyalt.

(*1I77)

Olli170286 ppR ADOCK 0 PDR-R

OPERATING DATA REPORT DOCKET NO.

50-250 DATE Mnv. s. 1981 COMPLETED BY V.T. Chilson TELEPHONE. ransT 552-3666 OPERATING STATUS

1. Unit Name:

Turkev Point Unit No. 3 Notes Unit No. 3 remained October 1981 out of service due to Steam

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2200 Generator repair program

4. Nameplate Rating (Gross MWe):

760 (Continued from previous m nth.)

5. Design Electrical Rating (Net MWe):

693

6. Maximum Dependable Capacity (Gross MWe):

680 646

7. Maximum Dependable Capacity (Net MWe);
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

3

9. Power Level To Which Restricted.lf Any (Net MWe):

None

10. Reasons For Restrictions.lf Any:

This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 745.'O 7 296.0 78 081.6
12. Number Of Hours Reactor Was Critical 1 459.3 55 760.1
13. Reactor Reserve Shutdown Hours o-631.0 844.4
14. Hours Generator On.Line 1 385.6 53 891.0
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Generated (MWH) 3 025 277 109 197 555
17. Gross Electrical Energy Generated (MWH)

_0 980 415 34 693 625~

18. Net Electrical Energy Generated (MWH)

-1 415 914 993 32 824 478

19. Unit Senice Factor 21.7 69.0
20. Unit Availability Factor 21.7 69.2
21. Unit Capacity Factor (Using MDC Net) 19.4 65.4
22. Unit Capacity Factor (Using DER Net) 18.I 60.7
23. Unit Forced Outage Rate 49.0 3.7
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each t:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

April 9.

198'1

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INIIIA L ELECTRICITY COMMERCIAL OPER ATION

('l/77 )

w e

, +.

,-,-.----e-evv

.,,,,sw y,

-~.,,ry

,-g 7-i<,-,.y---,

yv.-,, -

--,,y-m--

,-.,y c,. -, m + -, r

50-250 UNITSIIUIDOWNS AND POWER REDUCTIONS IEkET NO.

DATE Mavombor 9 1481 COMPLETED HY v 'r c' i 1 -

REPORT MONTil October 1981 TELEPilONE

( iUS I 59 M 666 e.

=

=

j?

3 4 55 Licensee g-t, h

Cause & Corrective No.

Date 3g 4

is&

Event 37 s?

Action to y:

E 55g Report 40 5'

Prevent Recurrence H

e U

Q 05 81-06-24 S

745.0 B

4 IIB llTEXCll Unit No. 3 Steam Generator repair (p) program in progress (continued from previous month.)

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S: Schedu!ed A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test -

2 Manual Scram.

Entr> Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (1.ER) File INUREG.

D Regulatory Restriction SotherfFvkriitt-Continuing 0161)

E Operator Training & Licenw Examination 5-Load Reduction F Administrative 5

9-Other (Explain)

G-Operational E.rror (Explain)

I,xhibit i.Same Source (9/77)

Il-Other (Explain)

AVEl(AGE DAILY UNIT POWER Lf. VEL DOCKET NO.

__50 ?S1 UNIT Turkey Point Unit #.

DATE November 6, 1981 COMPLETED BY V.T. Chilson TELEPIIONE (305) 552-3666 MONTII October 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (Mhe Net) g y ge,3,,,

I 677 678 i7 673 678 2

g3 3

19 605 667 4

'O 667 5

g 670

.3 6

670 7

23 g

663 3

663 9

663 10 26 g3 665 37 666 12 28 667 13 29 14 674 30 077 15 3:

"~~

678 16 NOTE: Average daily pow-r J e.<el r.w t e t t_iaa n 646 MWilE due to cooler condenser cooling water.

INSTRUCTIONS On this thrinat, hst the nerage daily unit power lesel in MWe-Net for each da in the repi iting in ini}i. <.inpute to the nearest whole nwgawart.

plI771

OPERATING DATA REPORT DOCKET NO.

50-251 DATE mw_ 6: 1981 COMPLETED BY V.T. Chilson TELEPHONE r3n5) ss9-3666 OPERATING STATUS

1. Unit Name:

Turkey Point Unit No. 4 Notes Unit No. 4 operated at

2. Reporting Period: October 1981 ap, proximately 100% R.P.
3. Licensed Thermal Power (MWt):

2200 until the unit was removed 760 from service on October 19,

4. Nameplate Rating (Gross MWe):

693 1981 for scheduled refuel-

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

68p ing, maintenance and inspec-

7. Maximum Dependable Capacity (Net MWe):

dons.

8. If Changes Occur in Capacity Ratings (Itens Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. lf Any (Net MWe):

None

10. Reasons For Restrictions.If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 745.0.

7 296.0 71~ 809.0

12. Number Of Hours Reactor Was Critical 455.8 6 391.2 53 404.0
13. Reactor Reserve Shutdown !!ours 166.6
14. Hours Generator On.Line 455.8 6 304.0 51 583.0
15. Unit Resene Shutdown Hours 31.2 s
16. Gross Thermal Energy Generated (MWH) 1 000 395 13 764 394 108 145 749
17. Gross Electrical Energy Generated (MWH) 319 290 4 400 634 34 373 807
18. Net Electrical Energy Generated (MWH) 302 961 4 179 443 32 563 463
19. Unit Sen-ice Factor 61.2 86.4 71.8
20. Unit Availability Factor 61.2 86.4 71.9
21. Unit Capacity Factor (Using MDC Net) 63.0 88.7 70.4
22. Unit Capacity Factor (Using DER Net) 58.7 82.7 65.4
23. Unit Forced Outage Rate 3.5 3.0
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

December 2, 1981

26. Units in Test Status IPrior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INIIIA L ELECTRICITY COM\\lERCI A L OPER ATION i

(9/77i s

J

~

DOCKET NO.

50-251 UNIT SilOTDOWNS AND POWER REDUCTIONS UNIT N AME Turkey Point Unit No.4 '

DATE Mnvomhnr c; _ 193}

COMPLETED BY vT chi 1 con REPORT MONTil Octnhor 1081 TFLEPHONE

( 305) 552-3666 e.

E E

j3 3

$Yh Licensee

,E -t,

{Q cause & Corrective W.

Date k

5?

33$

Event y

Action to L

3:

H

<. 3~ 5 =!

Report n

n U E

Prevent Recurrence O

l 6

13 81-10-19 S

289.2 C

3 RC FUELXX Unit No. 4 removed from service for scheduled refueling, maintenance and inspections.

(NUCLEAR and NON-NUCLEAR SYSTEMS.)-

i i

l t

l I

i 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S' Schedu!cd A Equipment Failure (Explain) l-Manual for Pseparation of Data B. Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction

+0therEyhnni Continuing -

0161)

E Operator Training & License Examination 5-Load Reduction F-Administ rative 6

9-Other (Explain)

G-Operational Liror (Explain)

Exhibii 1 - Same Source (9/77) 1I-01her (Explain) l l

l

AVEllAGE DAll Y UNIT POWER LEVEL DOCKET NO.

50-335 UNIT St. Lucie Uni; No.

DATE November 6, 1981 CO'.1PLETED IlY V.T. Chilson TELEPIIONE (305) 552-3666 October 1981 MONTil MY AVERAGE DAILY P0hER LEVEL DAY AVERAGE DAILY POWER LEVEL

( M b e-Net )

(Mwe. Net)

I 17 2

18 3

4 20 3

., 3

__u 7

23 8

24 9

10 26 gg 37

,y 14 30 15 31

-~~~

INSTRUCTIONS On this thrinat.hst the aserage daily unit power leselin MWe Net for each day in the reporting monih. Gimpute io the nearest whole irepwait.

(9 /77 )

OPERATING DATA REPORT DOCKET NO.

50-335 DATE Nnv.

9.

1981 COMPLETED BY v r ch41 son TELEPHONE (305) 552-3666 OPERATING STATUS

1. Unit Name:

SP-Tmci e Uni t No. I Notes Unit remained out of October 1981

2. Reporting Period:

service for scheduled refuel--

3. Licensed Thermal Power (MWt):

2560 ing, maintenance, and inspec-850

t. ion.

(Continued from pre-

4. Nameplate Rating (Gross MWe).

802 vious month.)

S. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Cross MWe):

R"

7. Maximum Dependable Capacity (Net MWe):

777

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. lf Any (Net MWe):

Nono

10. Reasons For Restrictions.lf Any:

This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 745.0 7 296.0 42 624.0

12. Number Of Hours Reactor Was Critical 5 883.8 34 309.I
13. Reactor Reserve Shutdown Hours 75.9 205.3
14. Ilours Generator On-Line 5 882.3 33 513:4
15. Unit Reserve Shutdown Hours 39.3
16. Gross Thermal Energy Generated (MWil) 14 947 870 82 196 018
17. Gross Electrical Energy Generated (MWH) 4 881-580 26 691 440
18. Net Electrical Energy Generated (MWil) 4 611 369 25 138 855
19. Unit Senice Factor 80.6 78.6
20. Unit Availability Factor 80.6 78.7
21. Unit Capacity Factor (Using MDC Net) 81.3 75.9
22. Unit Capacity Factor (Using DER Net) 78.8 73.5
23. Unit Forced Outage Rate 1.7 5.1 2I. Shutdowns Scheduled Oser Next 6 MonthslType.Date.and Duration of Eachl:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Nnvombor 27 19R1

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION (u/77 )

e

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-335 UNIT NAME St. Lucie Unit No.1 DATE November 6.

1981 REPORT MONT11 October 1981 COMPLETED BY V.T. Chilson TELEPHONE (los) 557-1666 "i

-=

=.a

.5 E E

j 5: X Licensee En, E",

Cause & Corrective No.

Date g,

3g 4

,g g $

Event 3?

!Ll Auion to

~5=

Report a n0 5'

Prevent Recurrence

$E e

g v

Q 06 81-09-11 S

745.0 C

4 RC FUELXX Scheduled refueling, maintenance, md inspections. (Continued from previous month.)

(NUCLEAR and Non-1 NUCLEAR SYSTEMS.)

t 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions 5: Sched u'ed A-Equipment Failure (Explain) l. Manual for Preparation af Data ll-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 44.M!iertMpb!M Continuing 0161).

E-Operator Training & License Examination 5-Load Reduction F Administrative 9-Other -(Explain) 5 G Operational En.< ti Tuin)

Exhibit I - Same Source P3/77)

Il-Ot her (Explain )

-