Text
..
AVERAGE DAll.Y UNIT POWER LEVEL DOCKET NO.
50-250 Turkey Point
' WIT uit ug, 3
n DATE November 6 - 1981 CO%1PLETED BY V.T. Chilson TELEPil0NE (305) 552-3666 510NTil October 1981 DAY-AVER AGE DAILY POWER LEVEL DAY
. AVERAGE DAILY POWER LEVEL (N!he Net)
(5twe. Net) y 2
gg 3
19 4
20 6
22 7
23 3
9
,3 10 26 gg 1.,,
23 13 29 g4 15 3
I6 INSTRUCTIONS On this tonnat.lar the userage daily unit power leselin stWeE t l'or each day in the rep,nting in.inth.C. impute to the nearest whole nwgasyalt.
(*1I77)
Olli170286 ppR ADOCK 0 PDR-R
OPERATING DATA REPORT DOCKET NO.
50-250 DATE Mnv. s. 1981 COMPLETED BY V.T. Chilson TELEPHONE. ransT 552-3666 OPERATING STATUS
- 1. Unit Name:
Turkev Point Unit No. 3 Notes Unit No. 3 remained October 1981 out of service due to Steam
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2200 Generator repair program
- 4. Nameplate Rating (Gross MWe):
760 (Continued from previous m nth.)
- 5. Design Electrical Rating (Net MWe):
693
- 6. Maximum Dependable Capacity (Gross MWe):
680 646
- 7. Maximum Dependable Capacity (Net MWe);
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
3
- 9. Power Level To Which Restricted.lf Any (Net MWe):
None
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to.Date Cumulative
- 11. Hours In Reporting Period 745.'O 7 296.0 78 081.6
- 12. Number Of Hours Reactor Was Critical 1 459.3 55 760.1
- 13. Reactor Reserve Shutdown Hours o-631.0 844.4
- 14. Hours Generator On.Line 1 385.6 53 891.0
- 15. Unit Reserve Shutdown Hours 121.8
- 16. Gross Thermal Energy Generated (MWH) 3 025 277 109 197 555
- 17. Gross Electrical Energy Generated (MWH)
_0 980 415 34 693 625~
- 18. Net Electrical Energy Generated (MWH)
-1 415 914 993 32 824 478
- 19. Unit Senice Factor 21.7 69.0
- 20. Unit Availability Factor 21.7 69.2
- 21. Unit Capacity Factor (Using MDC Net) 19.4 65.4
- 22. Unit Capacity Factor (Using DER Net) 18.I 60.7
- 23. Unit Forced Outage Rate 49.0 3.7
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each t:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
April 9.
198'1
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INIIIA L ELECTRICITY COMMERCIAL OPER ATION
('l/77 )
w e
, +.
,-,-.----e-evv
.,,,,sw y,
-~.,,ry
,-g 7-i<,-,.y---,
yv.-,, -
--,,y-m--
,-.,y c,. -, m + -, r
50-250 UNITSIIUIDOWNS AND POWER REDUCTIONS IEkET NO.
DATE Mavombor 9 1481 COMPLETED HY v 'r c' i 1 -
REPORT MONTil October 1981 TELEPilONE
( iUS I 59 M 666 e.
=
=
j?
3 4 55 Licensee g-t, h
Cause & Corrective No.
Date 3g 4
is&
Event 37 s?
Action to y:
E 55g Report 40 5'
Prevent Recurrence H
e U
Q 05 81-06-24 S
745.0 B
4 IIB llTEXCll Unit No. 3 Steam Generator repair (p) program in progress (continued from previous month.)
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Schedu!ed A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test -
2 Manual Scram.
Entr> Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (1.ER) File INUREG.
D Regulatory Restriction SotherfFvkriitt-Continuing 0161)
E Operator Training & Licenw Examination 5-Load Reduction F Administrative 5
9-Other (Explain)
G-Operational E.rror (Explain)
I,xhibit i.Same Source (9/77)
Il-Other (Explain)
AVEl(AGE DAILY UNIT POWER Lf. VEL DOCKET NO.
__50 ?S1 UNIT Turkey Point Unit #.
DATE November 6, 1981 COMPLETED BY V.T. Chilson TELEPIIONE (305) 552-3666 MONTII October 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (Mhe Net) g y ge,3,,,
I 677 678 i7 673 678 2
g3 3
19 605 667 4
'O 667 5
g 670
.3 6
670 7
23 g
663 3
663 9
663 10 26 g3 665 37 666 12 28 667 13 29 14 674 30 077 15 3:
"~~
678 16 NOTE: Average daily pow-r J e.<el r.w t e t t_iaa n 646 MWilE due to cooler condenser cooling water.
INSTRUCTIONS On this thrinat, hst the nerage daily unit power lesel in MWe-Net for each da in the repi iting in ini}i. <.inpute to the nearest whole nwgawart.
plI771
OPERATING DATA REPORT DOCKET NO.
50-251 DATE mw_ 6: 1981 COMPLETED BY V.T. Chilson TELEPHONE r3n5) ss9-3666 OPERATING STATUS
- 1. Unit Name:
Turkey Point Unit No. 4 Notes Unit No. 4 operated at
- 2. Reporting Period: October 1981 ap, proximately 100% R.P.
- 3. Licensed Thermal Power (MWt):
2200 until the unit was removed 760 from service on October 19,
- 4. Nameplate Rating (Gross MWe):
693 1981 for scheduled refuel-
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
68p ing, maintenance and inspec-
- 7. Maximum Dependable Capacity (Net MWe):
dons.
- 8. If Changes Occur in Capacity Ratings (Itens Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. lf Any (Net MWe):
None
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.0.
7 296.0 71~ 809.0
- 12. Number Of Hours Reactor Was Critical 455.8 6 391.2 53 404.0
- 13. Reactor Reserve Shutdown !!ours 166.6
- 14. Hours Generator On.Line 455.8 6 304.0 51 583.0
- 15. Unit Resene Shutdown Hours 31.2 s
- 16. Gross Thermal Energy Generated (MWH) 1 000 395 13 764 394 108 145 749
- 17. Gross Electrical Energy Generated (MWH) 319 290 4 400 634 34 373 807
- 18. Net Electrical Energy Generated (MWH) 302 961 4 179 443 32 563 463
- 19. Unit Sen-ice Factor 61.2 86.4 71.8
- 20. Unit Availability Factor 61.2 86.4 71.9
- 21. Unit Capacity Factor (Using MDC Net) 63.0 88.7 70.4
- 22. Unit Capacity Factor (Using DER Net) 58.7 82.7 65.4
- 23. Unit Forced Outage Rate 3.5 3.0
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
December 2, 1981
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INIIIA L ELECTRICITY COM\\lERCI A L OPER ATION i
(9/77i s
J
~
DOCKET NO.
50-251 UNIT SilOTDOWNS AND POWER REDUCTIONS UNIT N AME Turkey Point Unit No.4 '
DATE Mnvomhnr c; _ 193}
COMPLETED BY vT chi 1 con REPORT MONTil Octnhor 1081 TFLEPHONE
( 305) 552-3666 e.
E E
j3 3
$Yh Licensee
,E -t,
{Q cause & Corrective W.
Date k
5?
33$
Event y
Action to L
3:
H
<. 3~ 5 =!
Report n
- n U E
Prevent Recurrence O
l 6
13 81-10-19 S
289.2 C
3 RC FUELXX Unit No. 4 removed from service for scheduled refueling, maintenance and inspections.
(NUCLEAR and NON-NUCLEAR SYSTEMS.)-
i i
l t
l I
i 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S' Schedu!cd A Equipment Failure (Explain) l-Manual for Pseparation of Data B. Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction
+0therEyhnni Continuing -
0161)
E Operator Training & License Examination 5-Load Reduction F-Administ rative 6
9-Other (Explain)
G-Operational Liror (Explain)
Exhibii 1 - Same Source (9/77) 1I-01her (Explain) l l
l
AVEllAGE DAll Y UNIT POWER LEVEL DOCKET NO.
50-335 UNIT St. Lucie Uni; No.
DATE November 6, 1981 CO'.1PLETED IlY V.T. Chilson TELEPIIONE (305) 552-3666 October 1981 MONTil MY AVERAGE DAILY P0hER LEVEL DAY AVERAGE DAILY POWER LEVEL
( M b e-Net )
(Mwe. Net)
I 17 2
18 3
4 20 3
., 3
__u 7
23 8
24 9
10 26 gg 37
,y 14 30 15 31
-~~~
INSTRUCTIONS On this thrinat.hst the aserage daily unit power leselin MWe Net for each day in the reporting monih. Gimpute io the nearest whole irepwait.
(9 /77 )
OPERATING DATA REPORT DOCKET NO.
50-335 DATE Nnv.
9.
1981 COMPLETED BY v r ch41 son TELEPHONE (305) 552-3666 OPERATING STATUS
- 1. Unit Name:
SP-Tmci e Uni t No. I Notes Unit remained out of October 1981
- 2. Reporting Period:
service for scheduled refuel--
- 3. Licensed Thermal Power (MWt):
2560 ing, maintenance, and inspec-850
- t. ion.
(Continued from pre-
- 4. Nameplate Rating (Gross MWe).
802 vious month.)
S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Cross MWe):
R"
- 7. Maximum Dependable Capacity (Net MWe):
777
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted. lf Any (Net MWe):
Nono
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 745.0 7 296.0 42 624.0
- 12. Number Of Hours Reactor Was Critical 5 883.8 34 309.I
- 13. Reactor Reserve Shutdown Hours 75.9 205.3
- 14. Ilours Generator On-Line 5 882.3 33 513:4
- 15. Unit Reserve Shutdown Hours 39.3
- 16. Gross Thermal Energy Generated (MWil) 14 947 870 82 196 018
- 17. Gross Electrical Energy Generated (MWH) 4 881-580 26 691 440
- 18. Net Electrical Energy Generated (MWil) 4 611 369 25 138 855
- 19. Unit Senice Factor 80.6 78.6
- 20. Unit Availability Factor 80.6 78.7
- 21. Unit Capacity Factor (Using MDC Net) 81.3 75.9
- 22. Unit Capacity Factor (Using DER Net) 78.8 73.5
- 23. Unit Forced Outage Rate 1.7 5.1 2I. Shutdowns Scheduled Oser Next 6 MonthslType.Date.and Duration of Eachl:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Nnvombor 27 19R1
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION (u/77 )
e
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-335 UNIT NAME St. Lucie Unit No.1 DATE November 6.
1981 REPORT MONT11 October 1981 COMPLETED BY V.T. Chilson TELEPHONE (los) 557-1666 "i
-=
=.a
.5 E E
j 5: X Licensee En, E",
Cause & Corrective No.
Date g,
3g 4
,g g $
Event 3?
!Ll Auion to
~5=
Report a n0 5'
Prevent Recurrence
$E e
g v
Q 06 81-09-11 S
745.0 C
4 RC FUELXX Scheduled refueling, maintenance, md inspections. (Continued from previous month.)
(NUCLEAR and Non-1 NUCLEAR SYSTEMS.)
t 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions 5: Sched u'ed A-Equipment Failure (Explain) l. Manual for Preparation af Data ll-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 44.M!iertMpb!M Continuing 0161).
E-Operator Training & License Examination 5-Load Reduction F Administrative 9-Other -(Explain) 5 G Operational En.< ti Tuin)
Exhibit I - Same Source P3/77)
Il-Ot her (Explain )
-