ML20032C891
| ML20032C891 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/06/1981 |
| From: | ALABAMA POWER CO. |
| To: | NRC |
| Shared Package | |
| ML20032C890 | List: |
| References | |
| 6024, NUDOCS 8111120197 | |
| Download: ML20032C891 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _
i 6024 J.
M.
FARLEY NUCLEAR PLANT PRODUCTION DEPARTMENT DOCUMENT CONTROL DOCUMENT TRANSMITTAL FORM 1
FOR DOCUMENTS TRANSMITTED TO NRC WASHINGTON s,
8:
DATE 810406 Ot m-8
] g*
DOCUMENT NUMBER REVISION NUMBER COPY DOCUMENT CATEGORY 00 94 FNP-O-EIP-OO9 8
38 H6.17 c
N FNP-0-EIP-OO9 8
39 H6.17 i
Om FNP-D+ETP-OO9 8
40 H6.17 8
FNP-O-CIP-OO9 8
l 41 H6.17
.k o-[
FNP-0-EIP-OO9 8
42 H6.17 FNP-O-EIP-069 8
43 H6.17 "O
FNP-O-EIP-OO9 8
44 H6.17
_ __., FNP-0-E IP--OO9 8
- 46 H6.17 8
45
._._ _ H 6. _1 ? _. _ _,_. _, _ __ _,_
FNP-O-EIP-OO9 FNP-O-EIP-OO9 8
4'7.
H6.17 3
~ FNP-O-EIP-OO8 e
a 53 H6.17 FNP-O-EIP-OO8 20 54 H6.17
.wg FNP-O-EIP-OO8 20 55 H6.17 FNP-O-EIP-OOB 20 b6 H6.17 FNP-O-EIP-OOB 20 57 H6.17 FNP-O-EIP-OOB
.20 I
58 H6.17 FNP-0-EIP-OOB 20 I
59 H6.17~
~
FNP-O-EIP-OO8 20 60 H6. 1'7 FNP-O-EIP-OOB 20 61 H6.17 FNP-O-EIP-OOB 20 62 H6.17 i,;
~INSTRUC'TIONS TO'T'EE AD RESSEE
~
~~
~~
~
(1)
VERIFY THE DOCUMENTS RECEIVED AGREE WITH THE ABOVE DESCRIPTION
~ ~ ' ' ' ' - - " ~
j(43
( f. )
INCORPORATE THE TRANSMITTED DOCUMENTS INTO YOUR FILES S dI' (3)
DOCUMENTP OR PORTIONS OF DOCUMENTS WHICH ARE SUPERCEDED BY THE ABOVE MUST BE DESTROYCD f.
(4')
SIGN IN THE' SPACE BELOW INDICATING THAT YOU COMPLETED'THESE INSTRUCTIONS AND RETURN
~
' G THIS FORM TO THE DOCUMENT: CONTROL SUPERVISOR ps 1.
r
..