ML20032C759

From kanterella
Jump to navigation Jump to search
Responds to Requesting Addl Info Re NUREG-0737, Item II.K.3.44,anticipated Transients Combined W/Single Failure.Review of Assumptions & Initial Conditions Used in Generic Analyses Determined Results Are Representative
ML20032C759
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/03/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.44, TASK-TM NUDOCS 8111110661
Download: ML20032C759 (1)


Text

-

TH E CLE V E A N D E L E Cl:.

!i P.o. Box 5000 m CLEVELAND. oHlO 44101 o

TELEPHONE (216) 622-9800 e ILLUMINATING BLDG e

55 PUBLICSOUARE Da!wyn R. Davidson "E

  • O###

C#I# #" #

tiCE PRESIDENT SYSTEM ENGINEERING AND CONSTRUCTION November 3, 1981 Darrell G. Eisenhut, Director U. S. Nuclear Regulctory Co==ission Division of Licensing Office of Nuclear Reactor Regulation Washington, D. C.

20555 Perry Nuclear Power Plant Docket Nos. 50-W o; 50- M1

SUBJECT:

NUREG-0737 Item II.K.3. 4

Dear Mr. Eisenhut:

This letter responds to an NRC letter from D. G. Eisenhut to all applicants dated August 7,1981 concerning a request for additional infor=ation on NUREG-0737, Item II.K.3. M for the Perry Nuclear Pcwer Plant. The letter regnests a verification that the assu=ptions and initial conditions used in the non-design basis generic analyses for Item II.K.3.4 as referenced in that letter are representative for the Perry Nuclear Power Plant.

We have reviewed the ana27 sis assu=ptions and initial conditions used for the generic analysis and deter =ined that they are representative for the Perry Nuclear Power Plant.

Very Truly Your..,

M l

Dalwyn R. Davidson Vice President l

System Engineerin3 and Construction DRD: mlb

.(,s

, g;L,'

q cc: Gerald Charnoff, Esq.