Text
__
. ~ =
v.-
l l
i s
A THE DETROIT EDISON cot 4PANY E
QUALITY ASSURANCE DEPARDIEtTI' ENRICO FTRMI 2 PROJECT l
.I Response to NRC Report No. 50-341/81-07 Supplement to Response Dated August 20, 1981 Inspection at: Enrico Fermi 2 Site, Monroe, Michigan 7.nspection Conducted: June 15-19, 1981 Prepared by:
H.A. Walker,' Supervisor f
Constructjon Quality Assurance Approved by:
M T.A. Alessi, Director i
Project Quality Assurance
+
B111060664 811102 I
DR ADOCK 05000341 O
.PDR
L.I Page 2 of 3 e
- O Response to NRC Inspection Report #50-341/81-07 Statement of Violation 81-07, Appendix A (81-07-01)
A Contrary to the requirements of 10CFR50, Appendix B, Criterion IX, the Enrico Fermi 2 Final Safety Analysis Report Section B17.1.9, and the ASME Boiler and Pressure Vessel Code,Section III,1971 Edition, Winter 1971 Addenda, Appendix IX, Paragraph IX-3325, AS'IM E142 penetramers were not used to check the radiographic technique employed on shop fabricated welds.
Corrective Actio_n taken and the Results Achieved A review of Dravo radiographic film supplied to the Fermi 2 Project has been Over 4,000 film packages were reviewed and approximately 2,600 carpleted.
The problem were found to have the problem with the improper pentra:reter.
film have been grouped per OA Level and ASME Code class and a DDR has been.
Disposit. ion for the welds will be based on the written for each group.
following criteria:
Radiographic Film Packages for Weld End Build ups, that have been re-radiographed due to incorporation into final welds, are acceptable.
1.
Paragraph IX-3334.5 of Appendix IX of the 1971 Section III, allows 2.
the slit to be defined in lieu of the 2T hole for the nurrbers 5, 7, All radiographic' film packages where the slit and 10 penetrameter.
is visible on the number 5, 7, and 10 ASME penetrameters meet the intent of the Code and are acceptable.
Equivalent penetrameter sensitivity shall be calculated for radio-If the calculated 3.
graphic film packages not meeting criteria 1 or 2.
equivalent sensitivity value for the ASME penetrameter ccrapares with or is less than the maximm ALIM penetrameter sensitivity value, the l
radiographic film package meets the intent of the Code and is acceptable.
Radiographic film packages not meeting the requirements of Criterion 1, 2, and 3 shall be referred to Dravo for further consideration and l
4.
disposition.
i.e.: Re-radiograph or Code InquPy.
Correctiva Action Taken to Avoid Further Nonccrpliances Dravo has been This problem has been noted on Dravo radiographic film only.
f notified of the problem and a review of Dravo radiographic film indicates that the problem has not occurred since 1977.
Date Uhen Full Ca pliance Will Be Achieved A review of Dravo supplied radiographic film has been carpleted and discrepancies Grouping and evaluation of the problem film has been have been documented.
Disposition has been determined for film in the first three cat-carpleted.
Sixteen safety related welds were found to be in cate-egories noted above.
Required action on gory 4 and have been referred to Dravo for disposition.
,i these items should be ca:pleted by Decerber 1,1981.
~.
~
Page 3 of 3 A
, 'Ihe foregoing statments are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
k.
a.
II.h. Walker, Supervisor Construction Quality h surance Subscribed and sworn to before me this 30th day of Septerber, 1981.
\\
14A W D JENNI)lE KYKO 4 dotary Public, Monroe County, MI My Commissior. Ctpires Nov. 26,1934
./,
'j
=
Donald A. Wstis U vu;. v O,th'y Aww f
uth JU %1
.-dison m@Second Avenue =-
2 July 22, 1980 EF2-54,129 Mr. C. E. Norelius, Act...g Director
~
Division of Engineering and Technical Inspection U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. ?!orelius:
Roquest for Extension of Time to Respond to NRC inspection Report 50-341/81-07 8
This letter is to document the granting of a request by Detroit Edison for additional tim'e to respond to NRC Inspection Report 50-341/81-07 This
'l' report covers the inspection conducted by Mr. K. D. Ward of NRC Region ill 1
at the Fermi 2 Site on June 16-19, 1981. We requested the extension to allow adequate time to complete our investigation. To reply within the allotted time would probably require the submittal of additional infor-f' mation at a later date.
Mr. J. Smith of your organization indicated by telephone on July 20, 1981, that the request for additional time was acceptable to the NRC. The response is now due on or before August 20, 1981.
m Very truly yours
\\
1 HAW:mb l.
cc:
Mr. Victor Stello, Jr., Di rector Office of Inspection and Enforcement Mr. Bruce Little, Resident inspector J
+.
1 I
gyg 6 1981