A BALTIM ORE
/
d I/L
(#
GAS AND ELECTRIC NO 6
CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 W-ARTHUR c. LUNDVALL,.JR.
VICE PRESIDENT October 30,1981 Air. Haroid R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission WasSington, D.C. 20555
Subject:
Calvert Cliffs Nuclear Power Plant Units Nos.1&2 Dockets Nos. 50-317 & 50-318 Request for Amendments
References:
(a)
BG&E letters dated 7/3/79, and 1/15/80 from Lundvall to Denton, Request for Amendments (b)
BG&E letter dated 4/14/80 from Lundvall to Reid, Spent Fuel Aiodifications (c)
BG&E letter dated 5/20/80 from Lundvall to Clark, Spent
]
Fuel Atodifications (d)
NRC letter dated 9/19/80 from Clark to Lundvall, Amendments 47 and 30
{
Dear Air. Denton:
Reference (a) as supplemented by letters from BG&E 7/3/79 and 1/13/80 requested approval of our modifications to the linit Nos.1 & 2 spent fuel pool to install high density fuel racks. In reference (b) BG&E requested an increase in the spent fuel pool storage capacity from the previous application of 1760 to 1830 fuel assemblies.
j Reference (c) however, temporarily withdrew that request.
At this time BG&E wishes to reinstate the request to increase the storage capacity t
of the spent fuel pools at Calvert Cliffs to 1830 spent fuel assemblies.
l To obtain the additional spaces BG&E is using the Unit 2 Cask handling area which was already rendered useless for cask movement by the configuration of the recent modification.
l Reference (d) illustrates the approval of the higher number of fuel assemblies by
{
your Safety Evaluation and Environmental Impact Appraisal. However, the structural analysis were based on the lower capacity of 1760 assemblies.
I
'8111060447 811030 PDM ADOCK 05000317 00g P
'5d6 L
~
s FEE DETERMINATION We have determined, pursuant to 10 CFR Part 170 Paragraph 170.22, that this Amendment request consists of Class IV and Class I amendments for Calvert Cliffs Units Nos. I and 2, respectively, and, accordingly, we will forward a BG&E check to you in the amount of $4,400.00 under a separate cover letter.
SAFETY COMMITTEE REVIEW These proposed changes to the Technical Specifications have been reviewed by our Plant Operations and Safety Review Committee and Off-Site Safety and Review Committee, and they have concluded that implementation of these changes will not result in an undue risk to the public health and safety.
BALTIMORE GAS,ND ELECTRIC COMPANY BY:
P.
., u,
/, WC Vice Presid6 t, Supply j
STATE OF MARYLAND; CITY OF BALTIMORE; TO WIT:
Mr. A. E. Lundvall, Jr. being duly sworn, states that he is Vice President of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he executed the foregoing Amendment for the purpose therein set forth; that the statements made in said Amendment are true and correct to the best of his knowledge, inforreation and belief; and that he was authorized to execute the Amendment on behalf of saia corporation.
j WITNESS my hand and Notaria' Seal t-td hat i
My Commission Expires:
b L b + /_ /, / (( b
/
/
r
/
v' cc:
- 3. A. Biddison, Esquire G. F. Trowbridge, Esquire Messrs.
D. Jaffe - NRC R. E. Architzel - NRC r
-