Ro:On 810929,11.5 Ci Noble Gas Was Inadvertently Released. Caused by Seal Leakage from East Waste Gas Compressor Moisture Separator.Seal Repaired
ML20032B795
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/28/1981
From: Yundt C
PORTLAND GENERAL ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CPY-830-81, NUDOCS 8111060336
Download: ML20032B795 (1)


Text

'~

Portland General Electric Company i

Trojan Nuclear Plant P.O. Box 439 R;.inier, Oregon 97048 (503)556 3713 October 28, 1981 CPY-830-81 g,,,

e,s Mr. R. H. Engelken, Director h

[.

NOVO 5193g 4 US Nuclear Regulatory Commission Suite 210 u.s. %,

-)

1450 Maria Lane

%u a.w j

Walnut Creek, California 94596-5368 gg g

h/

1

Dear Sir:

N m

This report is being made in accordance with Paragraph 3.5.3.a(3) of the Trojan Environmental Technical Specifications (ETS),

concerning an unplanned gaseous release in excess of 5 curies of noble gas.

Due to seal leakage f rom the East Wast.e Gas Compressor Motsture Separator, a gaseous release of 11.5 curies of noble gas occurred between 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> on September 29,1981 and 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on September 30, 1981. The seal was repaired and the release was halted. This event is considered an isolated occurrence. Since the offsite doses resulting from this release were well below plant design objectives and federal guidelines, the affect on public health and safety is minimal. This event was also reported in accordance with 10CFR50.72 on September 30, 1981.

Sincerely, O

C.

. Yundt General Manager 87MG CPY/MLD/KLN:na c: LER Distribution List 6Y s s

Jonu
p

'l0 :l Nd CC 130 l]5!

CUU 8111060336 8110 gggg PDR ADOCK 05000 S