Forwards Public Version of Implementing Procedures for Emergency Plan,Including Sections on Operational & Emergency Supports Ctrs,Site Emergency Coordinator & Radiation Survey Team.W/O Encl
ML20032B741
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/28/1981
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20032B738 List:
References
810228-01, 810228-1, NUDOCS 8111060242
Download: ML20032B741 (2)


Text

~

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 i~*/

1881 -1981 g

/

PHILADELPHI A. PA.19101 WM"**'

b swirtos t. catinorr s

..=:=:1 s

3, February 28, 1981 jf J

4' sp gg Mr. Harold R.

Denton, Director Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commis sion Washington, DC 20555

Dear Mr. Denton:

Enclosed are ten copies of Peach Bottom Atomic Power Station Em er ge nc y Plan Implementing Procedures.

These procedures are submitted per regulations in 10 CFR 50, Appendix E, Section V.

Three copies have been sent under separate cover to Boyce H.

Grier, Region I,. Office of Inspection & En fo r c em en t.

These procedures as submitteJ address the Peach Bottom Emergency Plan currently under NRC review.

They are being reviewed internally to modify them according to existing emergency f acilities and equipment.

Revisions based on this review will be implemented on April 1,

1981.

The changing status for the plan and related facilities will require continuing review and revision to the procedures during the transition period from the old plan to the complete implementation of the new plan.

State and county emergency plans are ctill in Regional Advisory Committee (R AC) review.

'de have been advised that final drafts of the RAC reviewed state and county plans will be transmitted to us between March and July of 1981.

Liaison is maintained with the state and county emergency management agency personnel to discover and correct any incompatibilities between the Peach Bottom Emergency Plan and the state and county plans.

A consultant contracted to Philadelphia Electric Company has been providing assistance to expedite the development of local government plans.

The implementing procedures for the Emer ge nc y Plan currently in review by MRC will QOh S

e111060242 811030 PDR ADOCK 05000277 F

PDR

()

P e

. a...

Mr. Harold R. Denton Page 2 be continuo sly reviewed during the interim period addressing such major eas of concern as meteorological, communication, and other systet. i until all aspects of the plan have been finalized.

It is understood that copies of future revisions to these procedures are to be submitted to the same office within 30 days of such change.

Very truly yours,

)

^ ' g f(' s

'/

i.

Enclosure cc: Mr. Bo yce H. Grier, Di r ector Region I Office of Inspection and Enforcement i

U.S.

Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 l

l

[

4 I'

-e,%

-.--,-,,.-e-,,,-.e.--,w+,---,

mm.----s--,.-w.--w