ML20032B206

From kanterella
Jump to navigation Jump to search
Forwards Revision 2 of Security Force Qualification & Training Program.Revision Withheld (Ref 10CFR2.790)
ML20032B206
Person / Time
Site: Clinton 
Issue date: 11/02/1981
From: Koch L
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
U-0321, U-321, NUDOCS 8111050288
Download: ML20032B206 (1)


Text

-

4 Cf U-0321

/LL/NO/S POWER COMPANY L13-GTOP-81(ll-2)-6 500 SOUTH 27TH STREET. DECATUR, ILLINOM 62525 November 2, 1981 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

Reference:

Letter 10/2/81, James R. Miller, NRC to G. E. Wuller, IP,

Subject:

Comments on the Clinton Training and Qualifica-tion Plan Clinton Power Station Unit 1 Docket No. 50-461 Illinois Power Company hereby submits five (5) copies of Revision 2 of the Security Force Qualification and Training Pro-gram for the Clinton Power Station.

Revision 2 is a reply to the referenced letter request for further revisions and additional information.

Responses to the specific comments are given in addition to instructions for the replacement pages provided for the program copies which were submitted on April 16, 1981.

The qualification and training program identifies detailed security measures for the physical protection of a nuclear power station and the information is exempt from public disclosure in accordance with 10 CFR 2.790 (d)(1).

Respectfully submitted, ILLINOIS POWER COMPANY W

L. J. Koch Vice President GEW/sc SUBSCRIBED and SWORN to

,e,

'y goo /

';..)

before me this 2nd day y

k of November, 1981 a:.m:O c

  1. /

\\,OV0 41981*58 I

b*

N N UR W BLIC

.,ggmsg YQP 8111050288 811102 PDR ADOCK 05000461 F

PDR r

.