Amend 9 to License NPF-8,permitting Test of Natural Circulation Cooldown W/Boron Mixing at Next Shutdown or No Later than Before Startup After First Refueling Outage
ML20032B188
Person / Time
Site: Farley 
Issue date: 10/20/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20032B189 List:
References
NUDOCS 8111050170
Download: ML20032B188 (2)


Text

k UNITED STATES 3

o NUCLEAR REGULATORY COMMISSION U

h WASHINGTON, D. C. 20555 I

p$

ALABAMA POWER COMPANY DOCKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 9 License No, NPF-8 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Alabama Power Company (the licensee) dated September 16, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

phP!B8!Pash8lh P

l j.

2.

Accordingly, the license is amended by changes to the License Conditions l

and paragraph 2.C.(9)(b) of Facility Operating License No. NPF-8 is hereby amended to read as follows:

(b) After operation for 25,000 MW(e) days and at its next shutdown of sufficient time duration but in any case no later than prior to the startup following the first refueling outage, results of a test of natural circulation cooldcwn with boron mixing shall be submitted to the NRC. However, this license condition may be satisfied in the same time frame by the licensee's providing analyses to show that test results of such test performance at other plants are applicable to Farley 2.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEA REGULATORY COMMISSION

  • f

\\

vk

\\

rg Ch e Operating Reacter B nch No. 1 Division of Licens Date of Issuance: OCT 2 01981 1