Responds to NRC Re Violations Noted in IE Insp Repts 50-295/81-09 & 50-304/81-05.Corrective Actions: Initiated Three Tech Spec Changes & One Setpoint Change W/ Potential for Saving Five Reactor Trips Per Yr
ML20032B084
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/30/1981
From: Graesser K
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20032B083 List:
References
NUDOCS 8111040379
Download: ML20032B084 (1)


Text

Commonwealth Edison

-Zion Generating Station Shiloh Blvd. & Lake Michigan Zion, Illinois 60099 Telephone 312/746-2084 September 30, 1981 Mr. James G.

Keppler Regional Director Office of Inspection & Enforcement Region III U.S.

Nuclear Regulatory Commission Glen Ellyn, Illinois 60137

Reference:

Zion Generating Station Report 50-295/81-09; 50-304/81-05

Dear Mr. Keppler:

In response to NRC Inspection Report 50-295/81-09; 50-304/81-05, we fully concur with you in that multiple system challenges should be minimized, and mitigating steps taken to reduce the likelihood of unnecessary system challenges.

Relative to the above, we have ini-tiated three Technical Specification changes, and a set point change.

These have been discussed with the Zion Senict Resident Inspector and should be submitted to the NRC by November 15, 1981.

These changes have the potential of saving five reactor trips per year.

There are other potential changes to the Technical Specifications which we are currently evaluating for submittal within the next few months.

We would appreciate any assistance from you, in order to expedite the NRC's review of these changes, and we are available to discuss them either by telephone or in person as is necessary.

/

1 h

K.

L. Graesser Superintendent