U-0319 LO -81 (10- 0) -6 ILLIN0/S POWER COMPANY iP 500 SOUTH 27TH STREET DECATUR, ILLINOIS 62525 October 30, 1981
.s
't Q)
N)\\
4 Mr. Darrell G.
Eisenhut, Director h
{f '.\\
$7 Division of Licensing
[6 t!
NO 3 fg 3 b Office of Nuclear Reactor Regulation
~
g 84mmaam g / /
U.S. Nuclear Regulatory Commission i
% 8 88
[Uj h
washington, D.C.
20555
Dear Mr. Eisenhut:
Clinton Power Station Unit 2 Docket No. 50-462 This is in reply to your letter of October 26, 1981, wherein you requested clarification of Illinois Power's position on Clinton Unit 2 in view of the construction status of the unit.
Please be advised that Illinois Power Company's (IP) current activities, positions, and plans relativa to Clinton Unit 2 are:
1.
We have submitted to the Atomic Safety and Licensing Board (ASLB) a motion for severance and stay of pro-ceedings in Docket No. 50-462 Operating License (OL) 2.
We recommend that review of Clinton Unit 2 by the 3RC Staff ralative to issuance of an operating license be postponed until such time as construction of Unit 2 is substantially completed.
3.
Construction of Unit 2 of the Clinton Station has been deferred indefinitely and further expenditure of funds for construction is not authorized at this time.
4.
A request for extension of the construction completion date for Clinton Unit 2 will be timely filed as appropriate.
Sincerely, l
5
[
L.J.
Koch Vice President
// D cc:
J.
H. Williams, NRC Clinton Project Manager H.
H. Livermore, NRC Resident Inspector 8111040217 811030 PDR ADOCK 05000462 A