a.
Cornmonwg y !"st antion,,fp, L,,M As.
g gg,tlg c
cRASag;o i
October 1, 39gy Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Zion Station Units 1 and 2 Emergency Preparedness Appraisal Response to IE Inspection Report Nos. 50-295/81-13 and 50-304/81-09 NRC Docket Nos. 50-295 and 50-304-Reference (a):
J. G. Keppler letter to W.
L. Stiede dated August 26, 1981
Dear Mr. Keppler:
This letter provides Commonwealth Edison Company's responset to the deficiencies identified during the Emergency Preparedr.ess Appraisal at Zion Station.
Additional time for responding was requested from your-Mr.
C. Papareillo by telephone on September 25, 1981.
Enclosed are Commonwealth Edison Company's responses for each of the deficiencies identified in Appendix A of reference (a).
Also enclosed is a summary of our review of the other NRC recommendations and observations delineated in Appendix B of reference (a).
Appendix C of reference (a) identified deficiencies in the_
Emergency Plan (GSEP) and the Zion Specific Annex.
Revisions are being made to correct these deficiencies and they will be transmitted to you as requested by November 24, 1981.
To the best of my knowledge the statements contained in the attachments are true and correct.
In some respects, these statements are not based upon my personal knowledge but upon information furnished by other Commonwealth Edison employees.
Such information has been reviewed in ancordance with Company practice and I believe it to be reliable.
6 1 1.1 0 2 0 y 5 1981 -
1 1
Please address any questions concerning this matter:to!this i
office.
i j-Very truly yours, Yk l
F.
G. Lentine Nuclear Licensing Administrator cc:
Zion Resident Inspector i
SUBSCRIBED and SWORN to l
before dne this /g t
day ofpEGJgA,/
, 1981 hw A L $.
Notary Public i
l i
2618N s
e f
i I.
I i
I
. ~. -. = -. -. _ - - - - -. -, -. _.
~.
ZION STATION APPRAISAL' REPORT Appendix A.
Deficiencies (295/J1-13>01; Letters of agreement with offsite support and 304/81-09-01) governmental agencies Management review of status of agreements has been completed.
Follow-up letters have been sent to those agencies that did not sign initial agreement letters.
Expected completion date (ECD) 12/15/81.
(-02)
EPIP-320-1 call-out list.
1 f
A Rad / Chem foreman will be added to the call-out list.
It will be specified as his responsibility to call Rad / Chem Technicians as necessary.
ECD 12/15/81.
(-03)
Station Group Directors' procedures.
Station Group Directors' procedues will be wirtten in the format specified by Z.*iP 5-51-5 and modified as required to remove ambiguities.
ECD 12/15/81.
(-04)
Station Director's procedure EPIP-110-1.
EPIP-110-1 specifies protective action l
recommendations by use of the NRC's reporting ferm Section 8, which has been incorporated as-part of EPIP-110-1.
EPIP-110-1 vill be changed to direct the RCT's to conduct surveys as appropriate.
ECD 12/15/81.
(-05)
EOP/AOP direction to Reactor Operator reg.rding GSEP.
The appropriate E0P's.and A0P's will be revised to direct the Reactor Operator to inform the Shift Engineer of possible GSEP conditions.
ECD 12/15/81.
~
(-06)
PI0mpt notification of the public.
Ef "J' Prompt notification has been addressed in a cd # (qil-letter from L. O. DelGeorge to J. G. Keppler, 4
Nol dated July 24, 1981.
This letter provides a description of the means currently available to accomplish notification and the schedule for full system implementation.
(-07)
Communications tests with Madison, Wisconsin.
A program to test the communications capaollity with Madison, Wisconsin, will be implemented.
ECD 12/15/81.
(-08)
NARS system to Madison, Wisconsin The Nuclee; Accident Reporting System (NARS) provides the capability to connect the station
>I with the Wisconsin Division of Emergency Government in Madison.
The National Warning System (NAWAS) has a connection in the control room that provides backup capability of communicating with Wisconsin DEG.
It is planned to have a NAWAS drop also at the System Power Supply Office, t
j
(-09)
Public information pamphlets in Wisconsin i
Pamphlets have been distributed to transient l
population areas in Wisconsin.
(
l
(-le)
- Public information pamphlets in public places W Pamphlets have been distributed to the Illinois
- Beach State Park and other public places.
l l
(-11)
Procedures for inventory and checks of emergency l
equipment.
l Procedures will be modified _as required, or new procedures developed, to improve procedure interface, specify minimum inventories, and include provisions for replacement.
Procedures will be developed for testing of emergency l
equipment and documenting such tests.
ECD L
12/15/81.
I
(-12)
Procedure for inventory of offsite hospital equipment.
A procedure will be developed for inventorying equipment at the hospital.
ECD 12/15/81
(~13)
Procedures for field team's activities.
Draft procedures addressing the NRC's areas of concern were prepared for LaSalle County Station and submitted to the NRC on 09/01/81.
These will be adapted for use at Zion Station.
ECD 11/16/81
(-14-)
Procedure for the Eberline SAM II instrument.
Procedure RP-1740-4 will be revised to more completely describe the operation of the instrument.
ECD 12/15/81.
(-15)
Model for transport and diffusion.
The model'for transport and diffusion at Zion is being reviewed again, especially in the areas of lake influence and effluent trajectories.
ECD for this review is 01/01/82, to be followed by st omittal to the NRC.
Following review and approval by the NRC, the revised model will be implemented at Zion.
(-16)
Cross-references between radiation protection procedres (RP's) and EPIP-99-1.
The appropriate RP's will be cross referenced in EPIP-99-01.
ECD 12/15/01.
(-17)
Review of RP's for use during emergency.
The appropriate RP's will be reviewed tc determine the precautions, limitations, and actions for use-during an emergency.
Those RP's that are used only for emergencies will be made into EPIF's.
ECD 12/15/81.
t
(-18)
Exposure guilde11nes Exposure guidelines will be included in an EPIP.
ECD 12/15/81.
f 1
ZION STATION APPRAISAL REPORT Appendix B t
Appraisal Improvement Items 1.
PLvelop an EPIP for activation of EOF.
Expected completion date (ECD) 11/16/81 2.
Develop an interim procedure for quantification of releases from the steam generator safety / relief.
ECD 1/15/82.
3.
Specify radiation levels that would require relocation of laboratory capability and specify relocation areas.
Disagree with specification of a radiation level for relocation.
Dead time of the GeLi detector will be measured to determine the need for relocation.
Relocation area will be determined by 1/15/82.
4.
Correct 21 T measurements for Zion tower to be in agreement with RG 1.23.
Revise appropriate procedures.
ECD 11/16/81.
5.
Specify action levels for charging liquid nitrogen dewars.
Action levels have been specified.
6.
Classify fire emergencies in accordance with EPIP-330-1.
Fire preplan procedures will be reviewed for interface with the Emergency Plan.
ECD 1/15/82.
7.
Expand Environs Group procedures.
ECD 11/16/81.
5 8.
Include diagrams of evacuation routes in EPIP-360-1.
ECD 1/15/82.
9.
Supply Coast Guard with equipment.
We will enter inta discussions with the States of Illinois and Wisconsin and FEMA concerning the desirability of supplying equipment to the Coast Guard.
ECD for resolution 1/1/82.
10.
Install RG 1.97 meterological parameter output in the control room; replace existing wind speed and direction indicators.
Meteorological parameters will be available in the Control Room when the process computer is available (implementation schedule is as provided in the referenced NUREG-0737 Task Item).
We intend to maintain the current system (mast on top of Unit #1 containment) until the process computer is available.
Previous studies' indicate that wind direction measured from the mast is consistent with measurements at the lowest level on the meteorological tower.
Wind speed measured from the mast is slightly (1-3 MPH) higher than measured at the tower.
11.
Inform / train Waukegan Generating Station personnel of responsiblities concerning Zion Station evacuees.
Waukegan Generating Station Shift Engineers will be informed of responsibilities by 1/15/82.
Specialized training is not required.
12.
Train Lake County Sheriff's Office personnel.
ECD 11/30/81.
J 13 Revise procedures to call for immediate signal when EAL has been reached based on sample results.
The need for additional procedural requirements will be reviewed.
ECD 1/15/82.
s
3-t 14.
Provide OSC emergency personnel with immediate access to additional equipment.
Additional equipment will be made available to OSC personnel.
15.
Revise routine liquid effluent sampling procedure for use during accident conditions.
(add 4
precautions and limitations) 4 l
ECD 1/15/82 a
16.
Familiarize Station Group Directors with EOF procedures and organization.
This item has been completed.
17.
Incorporate Protective Action Tables in the Corporate Command Center Directer's procedure.
ECD 11/16/81 18.
Eliminate EPIP-330-3 and revise EG-1 and/or EG-2.
EPIP-330-3 rill be eliminated.
EG-1 currently has maps and descriptions of locations of Zicn's offsite monitoring locations.
The street map locations from EPIP-330-3 would not provide substantial j
additional information.
19.
Incorporate planned messages in EPIP-320-1.
I Disagree.
Personnel will report to the TSC as required, without a preplanned message, and be informed of emergency classification at that time.
Providing additional information during the cril-out would only delay the call-out procec.te.
l 20.
Revise EPIP-700-1 and EPIP-320-1 to incorporate names of personnel currently filling positions.
ECD 1/15/82.
l 1
y--
-v-
,,,,.-a
,w-c
,,g-
-n-.
,y-
~
-..-e
,y 3 -
~
q
-o-
h, o 4
~f 21.
Revise Attachment B to EOF-4 and CC-4 to describe current location of the Zion Emergency News Center.
l ECD 11/16/81 22.
Obtain a y:aund monitor probe for the first l
aid / decontamination room.
Disagree.
Methoos currently useo are preferrabic.
4 I
23.
' List technical support personnel in GSEP telephone directory.
ECD 11/01/81 24.
Acquire a dedicated vehicle for use by field teams.
1 1982 Budget allocations include one vehicle for 1
emergency use to be kept at station and a second vehicle for back-up, to be kept at the Chicago dispatch garage.
25.
Develop a QA procedure to ensure that all areas of Emergency Preparedness are audited.
Quality Assurance bases present audits on specific requirements from the GSEP and current implementing procedures.
Because implementing 1-procedures are still under development, a specific auditing plan would not be productive at l
this time.
A matrix for emergency plan audits will be considered for future audit schedules at l
the GSEP and procedures become fully developed, i
i 2618N i
.