ML20032A221
| ML20032A221 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/21/1981 |
| From: | Reeves E Office of Nuclear Reactor Regulation |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8110280526 | |
| Download: ML20032A221 (4) | |
Text
-
~
~
l 1
l OCT 211981 Docket No. 50'148/50-364 i
MEMORANDtM FOR: Steven A. Varga, Chief, Operating Reactors Branch No.1, DL FROM:
Edward A. Reeves, Project Manager, Operating Reactors Branch No.1. DL
SUBJECT:
FORTHCOMING MEETING WITH ALABAMA POWER COMPA?r! REGARDING RELIABILITY OF DIESEL GENERATORS AT FARLEY SITE DATE & TIME:
October 29, 1981 1:00 PM LO.?ATION:
Mar $nd National Bank Building Room 6110 Bethesda, liaryland PURPOSE:
Presentation of Alabama Power Company of the Diesel Generators Reliability Improvements Program at Farley Site Units No.1 and No. 2.
See enclosed agenda.
PARTICIPAtlTS:
NRC REOUESTED PARTICIPANTS:
ALABAMA POWER COMPANY l
T. Novak R. Mcdonald S. Varga
- 0. Kingsley M. Ernst R. George A. Thadani
- 0. Kennomor ff. Srinivasan W. Minners COLT INDUSTRIES G. llolchan D. Pickett J. Tangve P. Baranowsky W. Milstead M. Chiramal
'Originni Signed Byr Edward A. Reeves, Project Manager Operating Reactors Branch No. 1 Division of Licensing
Enclosure:
Agenda cc: See next page 8110280526 811021 PDR ADOCK 05000348 P
PDR omes >.9R.B)......
. ED........
. -... -.. ~.
- - ~ ~ ~ ~... -
sunu4ue )...ERf iue /.r.s..
..Q 7................
............ ~.. ~..
- -. ~ ~ ~ ~..
oa>..101Ma1......
. o a n......
NRC FORM 318 (10 00) NRCM 0740 0FFiCIAL RECORD COPY csom isei-mee
f~
?!r. F. L. Clayton, Jr.
i Alabama Power Company cc:
Mr. W. O. Whitt Executive Vice President Alabana Power Company Post Office Box 2641 Eirminghan, Alabama 35291 Ruble A. Thonas, Vice President Southern Company Services, Inc.
Post Office Box 2625 Bi rmi nghan, Al abama 35202 l
George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M St eet, fl.W.
Washington, D. C.
20036 i
Mr. Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Willians and Ward Post Office Box 306 Bi rmingham, Alabama 35201 i
George S. Houston Memorial Library 212 W. Surdeshaw Street Dothan, Alabama 36303 Resident Inspector U. S. Nuclear ;egulatory Con-ission Fost Office Eox 2a-Route 2 Colunbia, Alabama 35319 l\\
i t
i i
d
.m
=
p_ -
I AGENDA f
MEETING BETWEEN ALABAMA POWER COMPANY AND NUCLEAR REGULATORY COMMISSION CONCERNING RELIABILITY OF FARLEY NUCLEAR PLANT DIESEL GENERATORS I.
Introduction II. Summary of Recent D.G. Failures and Repairs III.
Items Contributing to D.G. Failures A.
Design B.
Opera tior, C.
Maintenance t
I D.
Technical Speci fication Restrictions IV. Actions Taken to Alleviate These Items A-Design Changes und Enhancements B.
Operation Changes C.
Maintenance Training and Improved Direction D.
Revised Technical Specification V.
Diesel Generator Reliability at Farley Site i
E
I OCT 21 1391 MEET.".': dOTICE OPERATING REACTORS BRANCH N0. 1 DIVISION OF LICENSING DISTRIBUTION Docket File J It' - 3 M N / O 'J ' f NRC PDR Local PDR ORB No. 1 Rdg File J. Olshinski B. Grimes (Emergency Preparedness)
S. Varga l
Project Manager OELD I&E (3)
Receptionist NRC Participants NSIC TERA ACRS (10) no a
y*
1 N 'N
[ N.
( C] [ j
. :..) 'C-
- j OCT2 31981-g qu ra:::r" p o,%a *0
\\
l 0
s L
Ii