Responds to NRC Re Violations Noted in IE Insp Rept 50-461/81-20.Corrective Actions:Procedures Revised to Include Raceway Acceptance Criteria Prior to Pulling Cables & for Resolving Discrepancies
ML20032A063
Person / Time
Site: Clinton 
Issue date: 10/15/1981
From: Hood J
ILLINOIS POWER CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20032A059 List:
References
0981-L, 981-L, U-0306, U-306, NUDOCS 8110280226
Download: ML20032A063 (3)


Text

e

.~

/LLINDIS POWER COMPANY 847 CLINTON POWER.TATION, PA BOX 399, CLINTOrJ, ILLINOIS 61727 0981-L U-0306 037-81 (10-15 ) -L October 15, 1981 Mr. C.

E.'Norelius, Director Division of Engineering and Technical Inspection U.

S.

Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 61037

Dear Mr. Norelius:

This is in response to your Notice of Violation and Inspection report Number 50-461/81-20.

Illinais Power Company's response to the item of noncompliance cited is as follows:

The Notice of Violation states, in part:

" Contrary to the above, as of August 14, 1981, the following instances of failure to develop appropriate or adequate procedures were identified:

a.

Adequate procedures had not been developed in that Baldwin Associates Procedure BAP 3.3.2, Ravision 8,

" Cable Installation",

did not address the minimum quantitative or qualitative acceptance criteria for raceway prior to pulling cables, nor did it address the acceptance criteria to be used in reselving the discrepancies noted ca the pre-pull walkdown of the raceway.

b.

Appropriate procedures had not been developed to provide adequate assurance that cables previously pulled into incomplete raceways will not be damaged when work is resumed on the raceway."

With regard to item (4) of the Notice of Violation, Illinois Power Company's response is as follows:

1.

CORR 2CTIVE ACTION TAKEN AND THE RESULTS ACHIEVED:

Baldwin Associates procedures / instructions are being revised to include acceptance criteria 8110280226 811023 PDR ADOCK 05000461 G

PDR OCT 191980

Mr. C. E. Norelius October 15, 1981 e

NRC Page 2 for raceway prior to pulling cables and the acceptance criteria to be used as a basis for resolving discrepancies noted during the pre-pull walkdown.

II.

CORRECTIVE ACTION TAKEN TO AVOID FURTHER NONCOMPLIANCE:

Personnel responsible for reviewing and approving procedures / instructions have been advised of their responsibilities to ensure that future procedures / instructions contain or reference applicable acceptance criteria.

III.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED:

Baldwin Associates will be in full compliance with the revised procedural requirements on or before October 31, 1981.

With regard to item (b) of the Notice of Violation, Illincis Power Company does not considar the development of procedures to be the appropriate means of assuring that cables previously pulled into incomplete raceways will not be damaged.

Due to the fact that work to be performed to complete raceway is varied in nature and is not generally performed under the control of a work document such as a traveler, procedural controls for protecting cables already pulled are not considered practical.

Illinois Power Company does recognize, however, that work on incomplete raceway containing cables must be performed with cable protection in mind.

Therefore, the following measures have been or are being implemented:

1)

Mandatory traini ng of craf t supervisory personnel in the responsibility for and techniques of l

cable protection.

2)

Incorporation of specific cable protection training sessions into the regularly scheduled craft " Tool Box" meetings.

3)

Revision of the Personnel Safety Book, issued to all craft personnel, to include precautions for and methods of cable protection during work on uncompleted raceway.

Item (1) above was cospleted on September 15, 198.1.

Completion of items (2) and (3) is to be completed by October 31, 1981.

r-

.Cr..C..E. Norelius Octobe'r 15, 1981:J

-NRC Page~3 I trust that our response is satisfactory to allow closure of.this issue of noncompliance.

I hereby affirm

that the information contained in this letter is. correct to the.best of my knowledge.

Sincerely, 4

/c J. O. McHood Vice> President