Monthly Operating Rept for Sept 1981
ML20032A040
Person / Time
Site: Pilgrim
Issue date: 10/13/1981
From: Whitney G
BOSTON EDISON CO.
To:
Shared Package
ML20032A037 List:
References
NUDOCS 8110280183
Download: ML20032A040 (6)


Text

_

o.

OPERATING DATA REPORT 4

DOCKET NO.

50-293 DATE 10/13/81 COMPLETED BY G. G. Whitney TELEPHONE 617-746-7900 OPERATit4G STATUS Notes

1. Unit Name:

Pilgrim I September, 1981

2. Reportmg Period:

1998*

3. Licensed Thermal Power (MWt):

678.

4. Nameplate Rating (Gross MWe):

655.

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 690.

670.

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Re: sons:

None

9. Power Level To Which Restricted. If Any (Net MWe):

00

10. Reasons For Restrictions. If Any:

N/A This Month Yr.-to-Date Cumulative

0.0 6551.0 7723110

!!. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 600.8 5848.7 56033.3
13. Reacta-Reserve Shutdown Hours 0.0 0.0 0.0 600.8 5771.0 54277.9
14. Hours Generator On.Line~

!$. Unit Reserve Shutdown Hours 0.0 0.0 0.0

16. Grsss Thermal Energy Generated (MWH) 1114656.0 10528512.0 92817888.0
17. Gross Ele.trical Energy Generated (MWH) 378700.0

___,3581870.0 30911234.0 363652.0 3443877.0 29694484.0 l

18. Net Electrical Energy Generated (MWH) l
19. Unit Service Factor 83.4 88.1 70.3 83.4 88.1 70.3 l

"0. Unit Avail.aility Factor l

21. Uhit Capacity Factor (Using MDC Net) 57.4 75.4 78.5
22. Unit Capacity Factor (Using DER Net) 77.I 80.3 58.7 23.: Unit Forced Outage Race 0.0 6.4 10.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refueling outage number 5 commenced on September 26,1981.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: December 6, 1981
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY

. INITIAL ELECTRICITY 8110280183 811013'pERCIAL OPERATION PDR ADOCK 05000293 PDR g

ow -a

~~.

AVERAGE DAILY UNIT POWER LEVEL a.,

DOCKET NO.

50-293 Pilgrim 1 DATE 10/13/81 COMPLETED BY G. G. Whitney 617-746-7900 TELEPHONE MONT)I seotember. 1981

~

5 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 633 579 g

g7 2

587 IS 619 569 633 3

39 629 639 4

624 538 33 g

6 624 n

601 557 540 7

,y 650 630 3

24 9

632 25 612 584 26 7

10 607 r

0 gj 633 0

g

,3 13 601 29 n

14 590 30 0

626 31 0

15 586 16 LNSTRUCTIONS On this format.!ist the average dasy unit power level in MWe Net for each day in the repomns month. Campute to the nt3 rest wnoie meg 2W3t!.

to /7~ )

- ~.. -

i PII.Ca tH t!Ili'i 1E.:.3TATf 0!!

M ull SEPTEMBER

'.,.;, a A F F. I ' r; t Mets it\\l M LTNE.t
E 0

Cal:RECTIVE ACTION I

M,:.NT
tal.t UMC r10N CAUSE M \\lN t ENANCE TO PREVENT 1:ECURRENCE ASSN 1:D !.

56-Reactor Building Outer. Door Seal Excese!ve Patched - LLRT Perform Visual Inspection Regularly N/A Truck Lock Doors Leak Usage Replaced Rollers and Aligned

- 30

' "B" RBCCW Baffle Plate Design Opened / Cleaned Initial PDCR to be completed pri,ar 81-049/91X-1 l

Deflation and Inspected to Startup 23

2301-3 Valve Valve Leaking Wear Lapped Seat & DiscRoutine Maintenance 10

' LPCI Cracked Weld at Vibration Replaced Pipe Request Vibration study for systems 81-051/01T-0 Test Connection aperated at le;s than design flow r

for long periods of time.

i 1

l l

1 a

e E

i O

l t

i 1

BOSTON EDISON CGMPANY E'

PILGRIM NUCLEAR POWER STATION Summary of Operations for September ', 1981 On September 1, the unit was operating at 97% and trimming power for main condenser delta temperature, Power was reduced to 50% for a backwash of the main condenser and scram testing of CRD 34-51.

Power was returned to 100% and "B" RECCW heat exchanger inspection completed and system returned to service on September 2, 1981. On September 3, 5, 7, 10, 13, 16 and 23 power had to be reduced to 50% to backwash the main condenser because of mussel fouling.

On September 9, CRD 34-51 could not be moved with normal drive pressure during the weekly exercise. CRD 34-51 was scrammed and electrically dis-armed in accordance with Technical Specification 4.3.A.2 and symetrical rods inserted. On September 16, after receiving shutdown margin verification with CRD 34-51 full.out, CRD 34-51 and its symetrical rods were withdrawn to the full out position and CRD 34-51 was electrically disarmed.

On September 14, "B" RBCCW heat exchanger was taken out of service for inspection and testing.

It was returned to service on September 15, and again removed from service on September 19, because of concerns on the baffle plates. Repairs were made to the baffle plates and the heat exchanger returned to service on September 21, 1981.

On September 17, with all rods out, coast-down commenced and the unit was-removed from service at 0046 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> on September 26, 1981 for refueling outage No. V.

SAFETY /P.ELIEF VALVE CHALLENGES MONTH OF SEPTEMBER,1981 REQUIREMENT: TMI T.A.P.

II.K.3.3 DATE:

NONE VALVE #'S:

N/A REACTOR PRESSURE:

N/A REASON:

N/A

g_

i 50-293 DOCKET NO.

UNIT SIIUTDOWNS AND POWER REDUCTIONS

?

UNIT NAME Pilgrim I t

DATE 10/13/81 COMPLETED BY M.T. McLouRhlin REPORT MONTil September. 1981 TI:LEPIIONE 617-746-7900 t

i c

e_

c.

3we Licensee g,=

$4 Cause & Correctt've No.

D.:e E.

j$

j gyy o

.c s ee Eveni

g a

Action to

~2e Repor: #

,#0 Ed

-o

=

c$ 5 5

Present Recurrence

~;

O e

c5 18 81/09/26 S

119.2 a C

2 N/A RC FUtLXX Scheduled Refueling Outage 1

i l

i i.

I I

i e

i 1

1 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions 4

S: Scheduled A Equipment Failure (Explain) 1-Manual for Prepar2 tion of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licens-e C-Refueling 3 Automatic Scram.

Event Report (LER) File INUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5

G-Operationa : Error (Explain)

Exhibit I - Same Source 19/77) ll-Other (Explain)

I

REFUELING INFORMATION The following refueling information is included in the Hbnthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds 'to equivalent notation utilized in the' request.

1.

The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

2.

Scheduled date for next Refueling Shutdown:

September, 1981 i

3.

Scheduled date for restart following refueling: December i6,1981 4.

5.

Due to their similarity, requests.4, 5, & 6 are responded to collectively:

6.

The fuel, which had been loaded during the 1980 scheduled refueling outage, is of the new P8x8R design, consisting of approximately 64 P8DRB282 assemblies and 120 P8DRB265 assemblies.

7.

(a)

There are 580 fuel assemblies in the core.

(b) There are 764 fuel assemblies in the spent fuel pool.

8.

(a) The station is presently ~1icensed to store 2320 spent fuel assemblies.

The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b)

The planned spent fuel storage capacity is 2320 fuel assemblies.

9.

With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 1006 fuel assemblies.

NOTE: There are 172 new fuel assemblies currently in the spent fuel pool.