Notice of Violation from Insp on 810901-30
ML20031H339
Person / Time
Site: Limerick 
Issue date: 10/08/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20031H330 List:
References
50-352-81-14, NUDOCS 8110270376
Download: ML20031H339 (1)


Text

,

d APPENDIX A

~

{

NOTICE OF VIOLATION Philadelphia Elect;-ic Compah/

Docket No. 50-352 Limerick Generating Station,. Unit.1 License No. CPPR-106 1

. As a result of the inspection 5 conducted on September 1-30. 1981, and in accordance i

with the Interim Enforcement Policy. 45 FR 66754 (0.:tober 7, 1980), the following n

violation was identified:

10 CFR 50, Appendix B, Criterion III. states,.in part, that:

" Design changes..

)

including field changes,.shall be-subject to design. control measures commien.

surate with those applied to the original design and be approved by the organi-zation that performed the original. design..."

~

l TheLimerickPSAR,Appen51xD. Paragraph 7.3.-states.inpart:."...Bechtel Engineering has an internal design control program."

Bechtel Job Rule 8031-JR-M-17 " Field Control of Pipe Supports (Hangers),"

1 Paragraph 5.6.1, states. in part: " Rework of.a hanger to a condition other than that specified on the hanger detail. drawing...may proceed if an,FCR (Field Change Request) is written within three (3) days..."

1 Contrary to the above, o$ or before July,1981, pipe support GBB-101-H3 was installed with the beam and connections (item.17) to a condition other-l than that specified on the hanger detail drawing GBB-101-H3. On September 29, 1981, a Field Change. Request had not.been initiated for. the change.

This is a Severity Level V Violation (Supplement II).. applicable to CPPR-106..

Pursuant to the provision of 10 CFR 2.201, Philadelphia Electric Company is~ hereby required to submit to this office within thirty. days of. the date of. this Notice, a-written statement or explanation in reply, including:- (1). the corrective steps which have been taken and the results. achieved; (2) corrective steps.which will be taken to l

avoid further violations; and.(3) the date when full compliance will be achieved.

l Under the authority of Section-182 of the Atomic Energy Act of.1954, as amended, this.

response shall be submitted under. oath or affirmation. Where good cause is shown, l

consideration will be given to extending your response time.

The responses directed by thid Notice are not subject.to the clearance procedures of the Office of Management and. Budget as-required by the Paperwork Reduction Act of 1980, PL 96-511.

Original signed B7:

W0 i

I R. R. Keinig, Chief

//

Projects Branch No. 2, Division of i

8110270376 811000'~

Resident and Project Inspection PDR ADOCK 05000352 G

PDR i * " ' " >

........ ~.. -

. ~ ~.

m....

ome>

. une roau m oo..o uncu on' _. __ _O.F_F.I_CI_A L R E.C_O R,D. _C_O_P_ _Y, _ _, _ _ _ _.. _ _, _. _

.