Third Interim Deficiency Rept Re Metal Defect in Main Steam & Feedwater Containment Penetration Anchors.Extent of Repairs Needed Require Postponement of Final Rept Due Date from 811031 to 820129
ML20031H285
Person / Time
Site: Waterford 
Issue date: 10/20/1981
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-81-0386, W3K-81-386, NUDOCS 8110270325
Download: ML20031H285 (1)


Text

I P O W E R & L l G H T! P o sox 6008

  • NEW ORLEANS. LOUISIANA 70174 142 DELARONDE STREET
  • (504) 366 2345 UTILIT!Ed SVSTEM D L ASMLL October 20, 1981 va P= set h eP e te W3K-81-0386 Q-3-A?.Q2.p{f g g

Q-3-A3p' 07'.17'

/Q r-g S2 g'b,

Mr. K. V. Seyfrit, Director, Region IV Ik i

U. S. Nuclear Regulatory Commission D' QCJ3 g ]ggg 3 Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 M

Arlingi.n, Texas 76012

\\

com m m y

SUBJECT:

Waterford SES Unit 3 Significant Construction Deficiency #17

,4 m

" Base Metal Defect in Main Stean and Feedwater Containment Penetration Anchors" Third Interim Report

Reference:

1)

Interim Report W3K81-0095 dated 2/27/81

2) Telecon to L. Martin (NRC) from L. L. Bass (LP&L) dated 10/19/81

Dear Mr. Seyfrit:

En the reterenced interim report (1), LP&L committed to submit a final report on Significant Construction Deficiency #17 by October 31, 1981.

The extent of repairs necessary to complete the corrective action on this deficiency has made it impossible to meet this der. ili. 2.

A final report on this item will be submitted by Januar r 29, 1982.

If there are any questions, please let us know.

Very truly yours, D. L. Aswell DLA/LLB/grf cc:

1) Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555