Final Deficiency Rept Re ECCS Cabinet Wiring,Initially Reported 801217.Bailey Controls Initiated Field Changes to Bring Drawings & Hardware Into Agreement.Field Change Authorizations Implemented & Wiring Corrections Verified
ML20031G921
Person / Time
Site: Midland
Issue date: 10/15/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8110260209
Download: ML20031G921 (2)


Text

r

'0 dansumers power James W Cook Y

' h, Vice 14esident - l>ojects, Eng.neering

.rnJ Construction 80-08 #h General offices: 1945 West Parnall Road, Jacetson, MI 49201 * (517) 788 0453 October 15, 1981

[ h!-

k O

tw J G Keppler, Regional Director Office of Inspection & Enforcement US Nuclear Regulatory Commission kg 5;] 00T2 31989,.p Region III 799 Roosevelt Rog Glen Ellyn, IL 60137 i T u.s.rxuu mumn CII b

EQM14loti MIDLANL PROJECT T

p DcCKET Nos 50-329, 50-330 4 /m FICAD CABINEP WIRING

'4 FILE 0.h.9.h5 SEP1AL 13709 References J U Cook letters to J G Keppler, Same Cubject 1.

Serial 10087, dru,ed Decenber 17, 1980 2.

Serial 11502, dated February 27, 1981 3.

Serial 12036, dated June 30, 1981 The referenced letters were interim 50 55(e) reports on the ECCAS Cabinet Wiring. This letter is the final retort.

As discussed in the last interim report, Bailey Controls has initiated field changes to bring the '11dland ECCAS drawings and hardware into agreement.

Field Change Authorizations (FCA) 12-89 and 13-81 which were submitted by Babcock & Wilcox have now been implemented by Bailey Controls Service Engineers and Bechtel Electricians. The FCA 's will be verified for compliance by the Midland project Quality Assurance Department to the corrective action required by NCR M-03-1-0-073 (dated November 19, 1980) on the ECCAS wiring errors. A 100% continuity check was performed by the Bailey Controls representative.

Consumers Power Company Quality Assurance will close NCR M-03-1-0-073 after verifying implementation. This it anticipated to be complete by Novceber 6, 1981 at which time the cabinets will be in compliance with tneir requi cments.

JWC/MJG/jm

((rf CC Director of Office of Inspection & Enforcement sy Att Mr Victor Stello, USNRC (15) b/!F 8110260209 811015 PDR ADOCK 05000329

/

PDR OCT 1 9 19Bh g

, Serial 13709 2

80-08 #4 CC Directce, Office of Management Information & Prograti Control, USURC (1)

RJCook, USNRC Resident Ir.epector Midland Nuclear Plant (1)

CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, AoLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq, USNRC FJKelly, Esq, Attorney General SHFreeman, Esq, Asst Att General WI[ Marshall GJMerritt, Esq, TNK&J t