ML20031G870
| ML20031G870 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 10/02/1981 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20031G858 | List: |
| References | |
| NUDOCS 8110260120 | |
| Download: ML20031G870 (2) | |
Text
.t-7590-01 UNITED STATES NUCLEAR REGULATORY CO MISSION DOCKET NO. 50-295 COMMONWEALTH EDISON COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendnent No. 70 to Facility Operating License No. DPR-39, issued to the Commonwealth Edison Company (the licensee), which revised Technical Specifications for operation of Zion Station, Unit No.1 (the facility),
located in Zion Illinois. The amendment is effective as of the date of issuance.
This amendment extends to October 14, 1981 a temporary change to the Technical Specifications authorized by Amendment 68 to permit reserve offsite power to be backfed thorugh the station's main transformer in the event Unit No.1 must be shutdown while the Unit No. 2 system auxiliary transformer is being repaired.
The application for the amendment complies with the standards 'and requirements of the Atomic Energy Act of 1954, as amended.(the Act), and the Commission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comissic.7's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of this amendment was not required since the amendment does not involve significant hazards consideration.
8110260120 811002 PDR ADOCK 05000295 P
~,
7590-01
~
1 The Commission has determined that the issuance of the amendment will not result in any significant environmental impact and that pursuant to 10 CFR 151.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in co:inection with the issuance of the amendment.
For further details with respect to this action, see (1) the application for amendment dated October 1, 1 981, (2) Amendment No. 70 to License No. DPR-39, (3) the Commission's related Safety Evaluation issued by letter dated September 25, 1981 which transmitted the Amendment No. 68 approving the temporary change to the Technical Specification, and (4) the Commission's letter dated All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C. and at the Zion-Benton Public Library District, 2600 Emmaus Avenue, Zion, Illinois 60099. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S.
Nuclear Regulatory Commission, Washington, D. C.
20555, Attention:
- Director, Division of Licensing.
Dated at Bethesda, Maryland, this 2nd day of October 1981 Fh THE NUCLfAEREGU ATORY. COMMIS ga, Ch ef
/ Operating Reactors Branch No. 1 Division of Licensing (
-,