ML20031G831

From kanterella
Jump to navigation Jump to search
Requests 10-day Extension to Complete Semiannual Physical Inventory in Order to Complete Leid & Book Physical Inventory Differences.Preliminary Results Indicate No Significant Losses of Matl
ML20031G831
Person / Time
Site: 07001100
Issue date: 07/17/1981
From: Lichtenberger
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Randy Erickson
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20031G832 List:
References
19739, NUDOCS 8110260074
Download: ML20031G831 (1)


Text

C QOC2//Cb $0blY f

C-E Power Systems Tel 203/688-1911 l [

  • /

Combustion Engineering. Inc Telex 99297

-MdO I

I 1000 Drospect Hill Road VI ndsor, Connecticut 06095 K

Ph h})f g'

s N

S MS j

3j d

ky i%Q'WE

! KR.8?SD. awnw

/

w e-3hj$

Re Licsnse SNf1-1067

'g s

Docket 70-1100 July 17, 1981 s

- Q tr 5,C P D P.I.

U. S. Nuclear Regulatory Commission

_2,.,,a,.s./%.1,L./l#../3,!

7915 Eastern Avenue c, d.qrj fiail Stop 881-SS a:

c;;.q/5,k/[/...i Silver Spring,f1D 20910 N 25 Attention: fir. R. A. Erick;on, Acting Chief

~~ '

Material Control & Accounting licensing Branch Gentlemen:

Combustion Engineering's Windsor site held their semi-annual physical inventory on June 24, 1981 as required.

Preliminary results of the inventory indicate that there are no significant losses or diversions of material.

However, all of the conditions for the inventory as required by 10 CFR 70.51(e)(4)(i) will not be met in the 30-day period ending July 24, 1981. A data processing soft-ware problem has caused a delay in posting many of the process transactions on-to the computer data base. As a result, the actual LEID and BPID will not be computed by the required completion date. The problem is currently being cor-rected, and the reconciling of the books will commence upon resolution.

He therefore request a 10-day extension of the requirement; listed in 10 CFR 70.51(e)(4)(i). We feel that this extension will not decrease the effective-ness of the material control and accounting program at Combustion Engineering, and that the LEID and BPID calculations will be accomplished within this time frame.

Very truly yours,

@f f

id,' G &

u cocmm B

H. V. Licqtenberger a

Vice President-Nuclear Fuel 2

Nuclear Power Systems-flanufacturing g

OCT 2 01981 > $

mas HVL/HTC/ssb uArtstenon DOCKET CtIRE

//

8110260074 810717 1,..._..g-PDR ADOCK 07001100 C

PDR i

.