APPENDIX
U, 5, NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report:
50-498/81-25; 50-499/81-25
Dockets:
50-498; 50-499
Category A2
1
Licensee:
Houston Lighting and Power Company
P. O. Box 1700
Houston, Texas 77001
Facility Name: South Texas Project, Units 1 and 2
Inspection at: South Texas Project, Matagorda County, Texas
Inspection Conducted:
July 21-22 and September 15-17, 1981
Inspector: d,.PJ M eA
/c/2 /pr/
W. G. Hubacek, Reactor Inspector, Projects Section 3
Date
re/2/f/
Approved:
e
W. A. Crossman, Chief, Projects Section 3
Date
Inspection Summary
Inspection on July 21-22 and September 15-17, 1981 i.aports 50-498/81-25;
50-499/81-25)
Areas Inspected:
Announced inspection of licensee corrective action in response
to the Show Cause Order.
The inspection involved 36 inspector-hours by one NRC
inspector.
Results:
No violations or deviations were identified.
kh0pK0500o49g
56 011005
D
G
P
DR
__
_ _ _ _ _
_ _ _ _ ,
_ _ _ _
__ _ _ _
_
_
_ - .
_
~
-
-
-
_
_
. -
.
.
-2-
APPENDIX
DETAILS
1.
Persons Contacted
Principal Licensee Employees
- T. J. Jordan, Supervisor, Quality Systems
- R. L. Deutschman, Project QA General Supervisor
J. L. Blau, Project Engineering Manager
M. E. Powell, Team Leader, Licensing
R. M. McDaniel, Lead QA Specialist
R. R. Hernandez, Supervising Engineer, Civil
H. G. Overstreet, Procurement Project QA Supervisor
- I.
P. Morrow, Construction Superintendent
Other Personnel
- K. D. Ramsey, Consultant to Houston Lighting and Power Company (HL&P),
Gilbert / Commonwealth
- D. J. Harris, Quality Engineering Manager, Brown and Root (B&R)
- F. W. Rothermel, Assistant Project Manager, B&R
- S. Loprete, Quality Systems Manager, B&R
R. W. Peverly, Assistant Project Engineering Manager, Support Services, B&R
B. Mitchell, Design Quality Engineer, B&R
E. Peterson, Mechanical Quality Engineering (QE), Document Supervisor, B&R
J. B. Leutwyler, Electrical / Instrumentation QE Supervisor, B&R
J. Adachi, Civil QE Supervisor, B&R
T. L. Porfilio, Design Quality Engineer, B&R
The NRC inspector also contacted other licensee and contractor personnel
including members of the QA and engineering staffs.
- Denotes those attending the exit interview on September 17, 1981.
2.
Licensee Action on Show Cause Order Items
(Closed) Show Cause Order Item V.A(7):
The licensee shall develop and
implement a more effective system to provide for control of field changes
in order to assess the impact of changes on design.
The NRC inspector reviewed implementation of the commitments in the
licensee's response to this Show Cause Order item by discussions with
licensee and contractor representatives and by inspection of objective
evidence related to the commitments described in the attachment to
HL&P letter ST-HL-AE-533, dated September 18, 1980.
The following
commitments, utilizing the identification numbers in the attachment to
the HL&P letter, were reviewed:
-3-
,
,
(Closed) Item A131:
Qualification and training records will be maintained
on Project Site Engineers and QE's.
The NRC inspector observed that
qualification and training records were being maintained for Project Site
Engineers and QE's.
Review of selected records indicated that the records
were maintained in accordance with procedural requirements.
(Closed)
Item A136:
Each morning, a computer printout will be provided
to users of design documents.
The NRC inspector observed that computer
printouts were distributed on a daily basis during the scheduled work week
as clarified by HL&P letter ST-HL-AE-658, dated May 1, 1981.
(Closed)
Item A137:
When construction of an item has been completed,
as-built verification checklists will be prepared and their correctness
will be verified by Design and Quality Engineering.
This checklist will
be used by the inspector for final acceptance.
The NRC inspector observed
that Procedure ST-QAP-3.2, "As-Built Verification," was issued for use
effective May 29, 1981.
The procedure delineates requirements for
preparation of As-Built Verification Reports by Quality Engineering, review
and approval by Engineering, and performance of as-built inspections by QC.
The NRC inspector also reviewed implementation of the field change control
system, both at the site and at the B&R Houston Engineering office.
The
field change control system appeared to meet the requirements of Quality
Construction Procedure A040GCP-21, and Engineering Procedures STP-DC-023,
STP-DC-028, and STP-DC-029.
Review of staffing of STP Site Engineering revealed that the staffing level
was 142 as of August 24, 1981, with a programmed strength of 195 in
June 1982.
Based on reviews documented in IE Reports 80-36, 81-05, 81-15 and this report,
the NRC inspector had no further questions regarding Show Cause Order item
V.A(7).
(0 pen) Show Cause Order Item V. A(8):
The licensee shall implement a more
effective system of record controls.
The NRC inspector reviewed implementation of commitments in the licensee's
response to this Show Cause Order item by discussions with licensee and
contractor representatives and by inspection of objective evidence related
to the commitments described in the attachment to HL&P letter ST-HL-AE-533,
dated September 18, 1980.
The following commitments, utilizing the
identification in that attachment to the HL&P letter, were reviewed:
-4-
(Closed) Item A141:
A system will be created by Quality Engineers such
that, prior to commencement of work, the records required to substantiate
the individual activities will be identified.
The NRC inspector observed
that the records control system was implemented by the following procedures:
ST-QAP-10.1, " Inspection Planning," Revision 1
.
ST-QAP-11.1, " Test Control," Revision 0
.
i
ST-QAP-17.1, " Records Control," Revision 2
.
4
ST-QAP-17.2, Storage of Hard Copy Record and Radiographic Film,"
.
.
{
Revision 0
ST-QAP-17.3, " Records Turnover," Revision 0
.
ST-QSI-17.1, " Instruction for Record Control," Revision 0
.
,
Document travelers which identify documents to verify and provide objective
evidence of specific work activities have been developed by each discipline
and issued for use.
(0 pen) Item A142:
Persons charged with creating required documents will
record the status of these documents as the documents are created.
The NRC
inspector observed that procedures (see Item A141) for implementing this
commitment were in effect; however, implementation had not proceeded
sufficiently for meaningful evaluation of the process for recording the
status of documents.
1
i
(0 pen) Item A143: When complete document packages on individual activities
are completed in the vault, Quality Engineering will review them to verify
that the documents are complete and adequate.
The NRC inspector observed
that procedures for preparing the document packages had not been in effect
'
long enough for production and subsequent Quality Engineering review and
verification of completed document packages for current work activities.
(0 pen) Item A147:
There will be a single filing system and documents will
be filed with a record traveler prepared by Quality Engineers.
The NRC
inspector observed that the procedures for.the record filing system had
i
not been in effect long enough to provide a basis for a meaningful
evaluation of the system.
Record travelers have been developed and
issued but have not been implemented for current work activities.
>
.
(0 pen) Item A148: The record traveler will identify the records required
to substantiate each activity, will record the status of the file, records
borrowed from the file, and will be used to identify overdue and missing
i
records.
The NRC inspector observed that record t;welers have been
developed and issued but have not been implemented for activities described
in this commitment.
!
,
i
i
L.--_._-.._-.._...____._._-._-_,.-.
-
-
-
.
. . . . - .
. . -
-5-
.
.
(0 pen) Item A149:
Records in the vault will be reviewed for adequacy
and completeness, based on the results of the review of record require-
ments.
Following extensive erfort to determine a plan for review of QA
records in the vault, the licensee described their program for fulfilling
this commitment in letter ST-HL-AE-717, dated August 31, 1981, to the NRC.
Steps in the program include:
a.
Identification of programmatic and production records,
b.
Installation of a traveler system for each discipline.
c.
Recruitment of the necessary Quality Engineering staff to perform
this review.
d.
Modification of the existing quality assurance procedures to describe
the documentation flow.
Items a, b and o are essentially complete.
Item c is ongoing and expected
to be complete by November 1, 1981.
It is expected that the Quality Engineer-
ing staff will be increased by 20 positions that will be devoted exclusively
to the record review process.
The licensee anticipates that the review
process will require approximately one year to complete after the positions
are filled.
The licensee has committed to provide Region IV with a quarterly summary
of activities related to Item A149 with the first report due December 1,
1981, and subsequent reports at three month intervals thereafter.
Items A142, A143, A147, A148 and A149 will remain open pending further
review during future NRC inspections.
3.
Exit Interview
The NRC inspector met with licensee representatives (denoted in paragraph 1)
on September 17, 1981.
The NRC inspector summarized the purpose and scope of
the inspection and the findings.
/
'..
j
IliSPECTI0i! PLAN
IE Inspection P,eport No.
50-498 & 50-599/81-25
e-
Licenses: MO: c7cN j.Jwrr//@ f Pet.ven ccmn4ky
~
Lect:icn:
egy cf7 3 7 syes ;
YkCiii23 '
SourH TEMS PWoJEC 7- VM/TS }sW Q.
J
IEde 0? ~?Ci~~ee:
f
) f,, T O /14 N et. ,. P (^)R
.
Type of ir,1: :
- n:
pov77gz/ y/apyconcg3
\\
.
Dates of Ins;e::icn:
c7pz y p f_ _p 9 /7 7/
Dates of Previcus Inspecuan:
Inspectors:
pj, S , ,jpg,ygg-y
SC0rE OF INSPECTION
32Ls W
$%'"
& WM y o,u gco-
x
k- %,waSI
20203D
sme
enc 2 8
g iach
wI.l
L ^
L(
.a
..N
-
M R$
>Jnk/
-r.eactor inspector
Date
Date