ORGANIZATION:
UNITED ENGINEERS AND CONSTRUCTORS, INC.
PHILADELPHIA, PENNSVLVANIA REPORT NO.: 99900510/81-03 INSPECTION DATE(S): 9/I4-18/81 INSPECUON ON-SITE HOURS: 62 CORRESPONDENCE ADDRESS:
United Engineers and Constructors, Inc.
ATTN:
Mr. R. A. Curnane, Vice President Project Support Operations 30 South 17th Street Philadelphia, PA 19101 ORGANIZATION CONTACT:
Mr. J. B. Silverwood, QA Manager TELEPHONE:
(215) 422-4744 PRINCIPAL PRODUCT:
Architect Engineering Services NUCLEAR INDUSTRY ACTIVITY: United Engineers and Constructors (UE&C) is the Architect Engineer on the following major projects: Seabrook, Units 1 and 2, and Washington Public Power Supply System, Units 1 and 4 (WNP-1&4).
Also, UE&C has active engineer-ing service contracts on two nuclear plants for two utility clients.
ASSIGNED INSPECTOR:
[
!h k" 3O "T /
D. D'.CGhamberlain' Reactor Systems Section(RSS)
Da ce OTHER INSPECTOR (S):
D. G. Breaux, RSS APPROVED BY:
p OO 4 [
j C. tr.Jile, Chief, RSS Date l
INSPECTION BASES AND SCOPE:
A.
BASES:
The PSAR for the Seabrook, Unit 1 & 2, Project, the PSAR for the Washing-l ton Public Power Supply System, Unit 1 (WNP-1), Project, and 10 CFR Part 50, l
Appendix B.
l B.
SCOPE:
Design change control, verification activities, product acceptance, and l
status of previous inspection findings.
Certified By_,
- J (t l
l ECb0hh O
ORGANIZATION:
UNITED ENGINEERS AND CONSTRUvTOPS, INC.
PHILADELPHIA, PENNSYLVANIA REPORT NO.: 99900510/81-03 INSPECTION RESULTS:
PAGE 2 of 3 A.
VIOLATIONS:
None l
B.
NONCONFORMANCES:
1.
Contrary to ANSI N45.2.9., Sectior IV.E.1.b., and Appendix A of Quality Assurance Procedure QA-17 ard Section IV.A.4. of Quality Assurance Procedure QA-18, all QA records for the Seabrook Project are not being l
stored and/or adequately protected from damage or deterioration and audits of record storage areas are not being performed on a periodic basis.
2.
Contrary to Section 17.2.2.2., of the WNP-1 project PSAR, design changes are not being subjected to the same design control measures as the original design.
A project change proposal was revised and approved without receiving the same review as the original issue.
~
3.
Contrary to Sections 17.2.7. and 17.2.10. of the Seabrook Project PSAR, fabrication of feedwater isolation valves by Borg Warner NVD (contract 248-36) proceeded past the first mandatory hold point designated on the Vendor Surveillance Check Plan without a UE&C vendor surveillance repre-sentative's witness of the inspection or test, or written consent by UE&C to waive this hold point.
C.
UNRESOLVED ITEMS:
None D.
STATUS OF PREVIOUS INSPECTION FINDINGS:
1.
(Closed) Unresolved Item (81-02):
The long term storage area for hard copy QA records on the Seabrook Project does not appear to meet the requirements of ANSI N45.2.9.
Further examination of the QA record system resulted in an item of nonconformance (see B.1. above).
2.
(Closed) Unresolved Item (81-02): WNP-1 Project Procedure No. 41 (PP-41) l for Change Management does not appear to represent present practices.
1 Ten Project Change Proposals (PCPs) were examined and Revisien 0 of PP-41 to determine if the present requirements were adequate and were being implemented.
This examination resulted in an item of nonconformance (see B.2. abcVe).
UE&C management stated that an " interim change to PP-41" will be issued "no later than October 9, 1981." This area will be examined further during a future inspection to determine if the revised procedure represents present practices.
ORGANIZATION: UNITED ENGINEERS AND CONSTRUCTORS, INC.
PHILADELPHIA, PENNSYLVANIA REPORT NO.: 9940090/81-03 INSPECTION RESULTS:
PAGE 3 gf 3 3.
OTHER FINDINGS OR COMMENTS:
1.
Design Change Control - Section 17.2. of d.e WNP-1 and Seabrook Projects PSARs and applicable procedures were examined to determine UE&C program commi tments.
In order to verify implementation of the program commitments, 15 revised design drawings and 25 design change documents were examined.
From the documents examined, the program commitments were implemented except as noted in B.2. and 0.2. above.
2.
Verification Activities - The related sections of the UE&C Seabrook Project PSAR and applicable Quality Assurance procedures were examined to determine if procedures were prepared, approved and issued to prescribe a controlled system for management of verification activities that are consistent with commitments to the NRC.
In addition, ten vendor surveillance check plans and their related shop inspection reports, ten procurement specifications, five UE&C OA vendor audits, and five Vendor Surveillance personnel NDE certification files were examined to determine if the committed program was being effectively implemented.
The committed pro-gram was being implemented with the exception of nonconformance B.3.
above.
3.
Product Acceptance - The related sections of the UE&C Seabrook Project PSAR and applicable quality assurance procedures were examined to determine if procedures were prepared, approved and issued to prescribe a controlled system that is consistent with commitments to the NRC.
In addition, ten vendor surveillance files, ten final shop inspection reports, eight Quality Shipment Releases, ten Vendor Surveillance Check Plans and five UE&C QA vendor audits were examined to determine if the committed program was being implemented. Within the area of inspection no nonconformance or unresolved items were identified.
l l
l l
l
PERSCNS CCNTACTED Cemeany dNIT60 fN6)NfER d CONSTRVcTOR$ lNG, Cates
/4 ' f f
Cocket/ Report No.119005/0/6l-03 Ins;:ector D, CH4M86RLAN Page I
of I
' LAME (Please :rint)
TI1E(Please Om nt)
ORGANIZATION (Please Orint)
DonAs S.
NuoGG Sup v. [us. - W. 0..ua r/
ll54 C ffCV)
WP-k
$0VCe N.
brig C.hause HAnagemenTCoortp' OE w 0
- WNP /a y j%cj. Alb.s t
- k. lu'. 0 n r kao J f Cr YDMmirraron ll [ W
- Trgsma f 4,,,,,
Y. N. IfA T -
L icemvc Supeuean -w U E s'r - re M u e M res 2
T. 9. scmmoT eue rur s.n. ru2cm.
u_e4c -
w up t/4 bermo <' Seweer Sum Enri. -. zYc UE /C - uwe'/4 AL
[be'ch Day pn p v.
US i c - tuuP V4 p
L 19,f % lory
& p l M ac k ' n,.
ME4 c - Whn k E
S M. N'LE iN AIUC U n L Euc iiva.
W W C.-
c r
G.M-A G G AtM AL.
lupti E&Ecr. SW6;g ueLc MIKL 6HRENlcK SUN. GEH6RAL Fh.6 5 l}& L G t
1 I
l l
1 l
PERSONS CONTACTED 9f/Y - /8 fA l Company US f C Dates Docket / Report No.
49C/ 00 51 o Inspector b.4 291;fAdk' Page i of f
NAME(Please Print)
TIT 1.E(Please Print)
ORGANIZATION (Please Printl 5~J E hl'h/1AL/6A/
krMOwn- /!rJ~QA GE~+ C-
[+cy_til S at/v l '
E.w Ju & Ek Mc x' - O va,7v kw.
OGdc (EMA
/
W J' G e w s >'
Assr hv 4%x dwo ~2~Gex 6 &i c' J & d A
/
H. E. F /o r &
Nu e le = < CDE-t/E i C
_ prejee/
Rn wasu Sousonsoncos ade zAu f
m comm d h.OEQDEl TE_si E V A vw g N E k
\\1 \\E % C bA O A wW m
.e-
Inspectar D. chart)668 LAIN gjot 8p%,$0 7,,
Scepe/Hodulo Df$l6N GHAN66 DOCUMEliT$' dAHIflED CONTROL 1
2 TITLE / SUBJECT 3
4 1
wHP-L PSAR CHAPTER 17.2 90RLITY ASSURA NCE 9 / 74 Am.10 00 RING DESiSH AND CONSTROCT10N U.E1 C.
2 3
pro 1ECT PRocEnvRE No. 2 \\
PRocE00RE FOR DRnunNG Wla/78 RH. 5 PRACTICES AND A PPRollALS [WFPSS) 3 I
1779-f- 502090 CONTRO L DIAGRArti AREA AIRBORNE W25/79 Rbl _1 ReoloAcTlDTY MonuToRING (AAM) 4 8
PCP 14 5000/20 CoHTROL Room PANEL REVISIOM 4/27/8) 5 f?
EdGlutERING CHANGE NOTioE EcN do.
3/25 W5/so S
PCP 145 000f,7 REPLAcEm6HT of Flo-TEK ELfcTRONIC 2/23/8)
TRAt)S m1TTERS WITH RustmonT EL6CTRONIC TRANS rn \\TTfRS 7
1 9779-M - 50200+
cournot ein68Ams coritecear coouac 7/3,/m Rcv. 3 WAT6R SYST6ro [6cW) 8 8
En&laE6eIn0 cnAucE noric6 - ECn ao 3049 I/2N80 9
1.
9779-F- 502040 GOMTROL DIAGRAM EmERGEact SHorDown 10/1s/79 R61.2 SEWic6 wAT6R SYS. (6SW) 10 ECn No. 3047 V23/80 lI
.l C0NTROL DIAGRATAS-CONTNNrnEHT SPM1 SYST6m(CSS) 502008$l3/5i R6V.3 Document Types:
Columns:
1.
Drawing 5.
Purchas Order 1.
Sequential Item N e ber 2.
Specification 6.
Internal Memo 2.
Type of Doc went 3.
Procedure 7.
Letter 3.
Date of Document 4.
QA Manual 8.
Other (Specify-if neces.ary) 4.
Revision (If applicable)
Insp ct r D. O M6ERLAIN g g llo.99] g lo Scope / Module DESIGN CHANGf DOCUMEdTh'ERAMillED CONTROL 1
2 TITLE / SUBJECT 3
4 I2 3
_ GENERAL EdGINEERlHG L DESIGrd PRocLD0RL (GEDP) 10/29/76 R 6 V. 3 ctoP- 0032 cc dre0L 6vALvAT10N AHo 1metEmsarATroa OF DESIGH CHAN665 '
13 3
knrnlHISTRATsV6 PRocE00RE N 0. 16 CHANGES To PROJECT 5 /15/5!
R60.13 DOCOM6NTS
- 14 8
DRnwlHG SCHEDVLE rnAHH00R AND STATUS 8/21/&l 16 1
9 763-F - 202101 DIESEL GENERATOR AIR SYSTErtl5 PL-T 4/bb t Rf1.A-DrAGRArn 16 3
AP Ho. 4-CoHTROL of UE L C ISSU60 DRnu)lNGS 11 / 3 / 8 0 REQ. f l1 3
GEoP-00I3 PREPARAT10M 0F DRAWINGS 3/25/77 REtl. 2 18 1
97(> s-F-202102 DIESEL GENERATOR F0f t A LUBf oil 'f f 4/8/8) gfy, 4 DIRGRAM 19 8
_DCN 02 02 (,5 A LlH L
$1?&
CHhcG6 5/22/80 20 1
9163-F- 202247 DIESEL GENERAT.:
BUILDldG Plfld b-II/12/%0 86V. 4 20HE 2 6 PLhd AT EL. 21'- /l 2\\
SAC 4b OS25 A LlHE S!22 cMfMGE 7/29/8/
l Document Types:
Columns:
1.
Drawing 5.
Purchas Order 1.
Sequential Item Number 2.
Specificatic i 6.
Internal Memo 2.
Type of Document 3.
Procedure 7.
Letter 3.
Date of Document 4.
QA Manual 8.
Other (Specify-if necessary) 4.
Revision (If applicable)
Docket 110 99900$)0 Insp:ctor O.
[M4Mbb8 LOIN Report flo.
51-0 3 Pag 2.3_of
+
Sc:pe/ Modula 0651Cu cdAHG6 DOCUME$Th'[kN41HED CONTROL 1
2 TITLE / SUBJECT 3
4 22 ECA 02 02 77C luT6RFERENCC ll/lWSO 23 DCN 020 284 R REVISE PIPS 40 ccHFIGvRAT10M 5/7/so 24 1
97(,3-F- Bo Go lb PRIMARY Comp 0NEHT Co0 LING u)AT6R 2 /20/51 R&V.3 _
LOOP B"-
SH,.1 PA L DIAGRAM 25 5
DcN 050465 A DELET6 L6t EL 6AUGES flMAI
/
-2h nca 08052 6 A R6nst 94 TD 1/12 /79 27 8
OcH og 05 26 B ADD TANK OV6RfL0u)
SW1 TCH 2 /13 / 7 0 2.5 I
9763-F-805009 SM6TY IN36CTICM SYSTfM ACC0MOLAToRS d h W 80 REV.3 29 8
DcM 09 f>234 A D6LGTE 765T LIN6S 11/9/77 90 1
9763-F- 505010 SAFETY aN7EcTnH SYSTim HIGH H6AD 3/24/RI, REV 5 3I 6
DLH 0% 1205 A DELETE "1"
SIGNAL 5/19M i
- 32 S
Ecn 08)269A HOLD 6AECTioN OF L)d65 7//5/6 /
33 5
Dr H 0505% A RGths6 PLED
'1/25/80 34 L
9763-F-3/0013
%0V t/ HIT SUBS 7ATioH 80.563 l-E51 A 3/Bf 1
RtV. S
/5 I-E52 OME LIN6 DIAGRAM
. 35 5
Dcd 030674A 3HIFT rt1C L 1/b/S!
Columns:
Document Types:
1.
Drawing 5.
Purchas Order 1.
Sequential Item Number 2.
Speci fica tion 6.
Internal Memo 2.
Type of Document 3.
Procedure 7.
Letter 3.
Date of Document 4.
QA Manuel 8.
Other (Specify-if necessary) 4 Revision (If applicable)
*
- Y 0 O
Insp;ctor D. l NAt/l06RlbIA yg y,
Sc pe/ Modula D6 SIGN C44NG6 EUMDM' ERN11tfED CONTROL 4
1 2
TITLE / SUBJECT 3
36 5
DCN 050401A R6LOCATb lNSTR t/Mf+175 2lbl8I 37 1
9763-F- BICOIO DI656L G6N6RATCRS DG-IA AND D6-IB 3/3//5/
Rf64 ONE LIN6 DIA6 RAM
\\
30 8
DCd 036582 A OLocK R6 LAY Mom 7tiffMG 9/21/79 39 1
91b3 - F-3I0023 DitS6L t;ENGRAToQ 80lLDIMG 4Lo v 3/ti/81 REi. 4 rn0 To R CONTR OL C6HT6R
%0 8
D&N 030358A M
BLOG TRIP I0/2 /?6 41 S
DcM 02o460A (nNtlERT ALL. MCCs 5//5/79
+2 B
OcN 0 R 100 6R USE F
FRAME BRfAKGPs
(/17/gl 48 8
den O 30%79 A DC SalGR
&HANGE 10/30/80 44-1 9 7L3-M-310107 12S V DC Su)lTCHB0ARDS SCH6cMTic 4//W8'l R611i DIAGRAM 45 8
DcrJ 0%I205A 5/19/81
~
'46 L
4163-M- 310890 SAkTY IN3ECTION SYSTErt)
SCHfAATIC 10/2n/60
%I. 3 DI A GR4m 47 3
DcN 0304% A REVtSE Acc TK ISb t/LV CNT 70 5/3//79 PbRrtitT CL 05tHG Document Types:
Columns:
1.
Drawing 5.
Purchas Order 1.
Sequential Item Number 7.
Specification 6.
Internal Memo 2.
Type of Document 3.
Procedure 7.
Letter 3.
Date of Document 4.
QA Manual 8.
Other (Specify-if necessary) 4.
Revision (If applicable)
]1 1
7 n
nia i
- s O 3 f
N
_ o 1
oo V 2 NN F
J
/
R tter 4
hoe cpg C
1 1
roea gRP 1
r G
4 A
7 t
h h F
e
/
/
c F
I T
" j e u h
A 7
e
=
i i
D h
[
/,
h t
9 lB l
o
)
3 3
u> 9 i
MO k
A n
LA l
J v
1 m
Y e
s C
J#
M% n h
1 e
S a
d n B
v l
x C T-h u l
b 5 e
N%M L
h S A M
E L
n 3
v u n n
A E h n-D t
w %d%L %C 1
E A
9 2 n
% (b 1 u.
d G S N
s I
l 0
M T
L n a L l A
T aj X
C u
Z d
n 4 m 'i - L l u
M L C u 4
E E
u o J
O l3
~ b S
B C
c C
T U
m 'M h u.a N
S
~
r a
E
/
t M
E y
E s
1
~
C 1
h 2
)-
N' w %
A l
u dl 8
U L
h i
A A
C T
h-
~
u L
%x O
I d
s M
J D
T A
u, l s
e A U 8
b c
}
! 0-3 i
s C-d E s.
k l
4
?.
1 "u%n b b k
2 u'W e
~
5 J
)y M
I y
Rx r
U
~
M% 'A a
n b
s e
C J
Q-s c
f 'mw u w %v O
t G h $m s e
6 c
o r A e
s c
u L
k n
T A
'7 I'6 i
a f
)
L ?'
k P uL 4
f.
i
(
c A
L m
s r
y A
/
i O$'t C
C dm i
c eo f
(
~
re c
OM e
p el S
sa
(
E anr P
hrer 3 a B
S 8 8 gS R
E Y
W cet e e 3 3
T tth a net t
R
_B 5678 B
5 E
L
~
U 9
9 n
G D
9 o
t O
f 8
- l 1
I1
\\
i h_
P M
s t
B 3
e ael p
cra r
y gi uu
~
o T nfdn
't iiea t wccM c
e O
naeo p
N erprA s
mDSPQ n
M u
I E
c T
o 1 ;
l l
}j w
~-
n
_3 f
/
9a l0 f
f o
~
. c_
oo -
y NNL E
R
'tt koe L E r
L I
cpg cea URP i
c hlx,,_
8, G c s c
3 o
i, b
)
h b
7 s h
Vf h
((3 E
//
T 6
e
_ A h h h r D /
0 r
2 i
i t
l
/
'/
l 3
h
?
G 7 t
5
_4
/
s, S I
i 9'
b P
e i
M c
e s
t vtd i
V k
b
(
h w
O C
P 2
b wM >a a,
o w.bh L
f' C
V P
s D
~
h N
s e o v
E d
C A,
Aw-ro I
M A
T I
X C
n-
?>
s t
1 E
E
-a J
r~
u' o Pu A A S
B T
U 6
M E
I
' A N
7 I
N S
AW-D.
i l
E
/
m l
o v L U
L i
A o
o C
T 4
D T
9 6
d O
I f
A I
3 7 9 d
5 i
\\
8 (0h A
n 2
I s 3 6 a d ud a a S m 3
E b
o T
4 5 A A u u
% +-%
)
7 l
)5 y
~
? Od 2 2 r
??
a t
s t
A e
r d w 8'
s S
e t
~
~
u %_
P P
P f P P t c
D 5
e c L c c c tl b C n
P m aa _ J, u w U m o s a
f
'G o s 5 s s Q
i e
V V
A
\\ a v O.
/
s P
C
\\
3 I
l r
y 3
C eo f
dm i
re c
OM ep el S
k sa
(
E anr O
P 9
9e h rer s 8 7 8 Y
97 8
8 9 6 8 s cet e b
T I
rtth E
unet 2
9 e
5678 s
E 8
L N h i
U n
y4b D
w o
O P
i M
3 s
t
~
e ael
'r p
cra y gi uu o
T nf d n
~t iiea c
t wccM e
O naeo p
N erprA s
mDSPQ n
M u
i E
c T
lll\\lL l
io I
WMW ZC ff J. T
'an E
.o bb
- E
" m, b
aa Cu
-M C C O*
m e c_
c F
t D
k
' I-u.
c
,;j rJ-ytt n.
c:
n r;
%,x
.q'
[)
{3 g
N r
e
'D O
.Q e
5 x
-(
x u
y' m
x
>=
D T'b 5
00 5 o 4
x w
e tt 4
8 d
LO T 5 T 2 8
O G o
.X N 11'.
r-o ec to i
l i
Ge 4 7 e.e v k ._) u eO i-Eb u or g ect h r'b' m c..C c. _, o \\D h cc d m o . f\\ @W T
- v.,
V C K-o ['
- !d b
l E 3E% u c a'c -a a 3 a 5 T, 8 :i! E d 5EEE< g c r gamme W a o '-*'O' D chet 'l.979005/0 Insp;ctor D. CHAM 86RLAIN Report flo. sI-og Scspe/Hodulo $TATUS 0f PRE \\ll005 DOCUME5Th' ERNilflED INSPEcit0H FINDINGS 4 1 2 TITLE / SUBJECT 3 1 3 @ PPSS noCLEAR pro 3Ec7 no..I PRoucT PRocEo0Rcs 80. 10/20ho BEv. o 41 CHANGE mAHAGtmENT _2 8 PCP NO. 14S0000]D IN1tRGRAN0LAR STRESS CORR 0510H 3/iO/81 REll. D CRA LK1NG (TGSCC) (RivEaTION 3 PCP no. I450000 2 REASSIGH C254 t00RK on DEcoa. Rm To 7//b/60 c 210 OtsAPPRsVLD 4 3 PcP no. I+S 0000 3 SEconsTY coareal R00M RR6 98076CT10 9 /30 /80 vol0 5 8 PcP No. 14500019A onstTE 76CHHICA L SUPPCRT C6NT6R l/2//8/ b 8 PCP No. 1450005C 8 TmI-2 TASK I4 5 0 71 KfV. B 1 PGP N 0. 1450014(, REASSl(>HM6dT cf ELECTR0 HIC Cond6RTfR 5// WWI EnCLoSdRE To CnHTRACT Zi$ 8 PcP n o. 14s00211 PIff willP RESTRAINT fAINTlHG 8/7/81 9 PCP No. 14500131 PLA uT control CoHSolf Af D6.Silrf 5/5/8/ STUcTORAL 10 8 PCP vo. 145 00093 ErM86fMCY OffSEL G6HERAToR CW8tlSTica 3/3VWI AIR INTAX6 SYSTfro Document Types: Coltrnns: 1. Drawing 5. Purchas Order 1. Sequential item Ntsnber 2. Specifica tion 6. Internal Memo 2. Type of Dccument 3, Procedure 7. Letter 3. Date of Document 4. QA Manual 8. Other (Specify-if necessary) 4. Revision (If applicable) ooce.et 11o. 999005/0 Insp:ctor D. c#4r466RL6tN Report flo. 71 03 Page 2 of 2 Scope /Hodula STATUS 0F PR6Vi005
- gyng4, lHSPECTICH FlHDl HGS 1
2 TITLE / SUBJECT 3 4 I B PCP I45001390 canrAramsnr is0tATron PROVIstedS FOR 7 /16 /81 K f V. D. P M 's - Trn1 TASK #3 12 8 PIERC6 RUSINESS ARCHit/ES COSTomtRS carnPLET6 5 /12 8 / OPDATE - comPUT6R PRIHT 007 13 2 ADm1Hl5TRATIVf PRocEDORE No. 2 - CORRES PcRotNc6 VI1/6/ hf V. 6 LoHTROL SYSTEM l4 3 0 f)ALITY AGS0RAncE PRocEDORE QA-I7 00AUTY Ass 0ReacE Ih +/so REV. 5 RECORDS f0R 56A6R66K STATION l5 8 AUDIT RfPoRT No. NH-282 DocumfMT R6fthTE STnRAlrE. 5/2W79 FoLcROFT. PA. 16 8 AUDuT RfPORT No. HH-2b7 6 0VLICATL RECORDS RE"HTrod S/9/19 R00M. BOSTod OfflCl l1 3 hvAL[TY ASSURANC6 f80CfDORE GA -12 GtlAuTY ASStiRRact 1/19 / 19 Rf V. & hvDITS f0R. SEABROOK STATled I3 8 56ABRo0l< IL 2 PSAR SECTION 17.2 QUALITY ASSORo3N CE 5 / 74 .AM. I3 UH tTGD EH GlHEGR5 L C0HSTRoc TORS, INC. Document Types: Columns: 1. Drawing 5. Purchas Order 1. Sequential Item Number 2. Speci fica tion 6. Internal Memo 2. Type of Document 3. Procedure 7. Letter 3. Date of Doct:nent 4. QA Manual 8. Othe" (Specify-if necessary) 4. Revision (If applicable) 3-1 .Rev. 3 73 A.1:No.wcz us? \\ ccMP.wt: UNITED ENGINEERS 1 CONSTRUCTORS cccxs: No.99900610 Da:e: h~ IN! ?:e-E:speccen centerence iWi?:st Inspecuca C:sierence (F'. ease N AME I:" ease 3-int) ET' 2 (?! ease ?.no GRGANIZAECN ? _nt) D. D. CHAMB6RLAIN ICONTRACToR INSP6CToR I USNRC RE6. If D c, BREAUX I I CONTRtCTOR INSPECTOR l USNRC ret, H ). U. L EomARO \\ Ass'T Y1GR. P+OA U E '* C ._(i. L. 4 t sc.o l W& kb blU$eawh Ull-w ! 6. E G /e I h/4r. MEclu [med D NC ~ 'R A Co m s i d. h Lee A.! o S t D G AtWmad lAfu- ?brcn ! d ry c B. 8. %rr \\ ks'r 14e. d49A kpr; utic \\ BC L ua ko Gx, ta,,,u G. I vesc I i i l l i k l l l l i \\ 1 l l j ? l l l a i l f _ - -