Forwards Revision 1 to Svc Water Pump Structure Seismic Model, Revision 3 to Auxiliary Bldg Seismic Model & Technical Rept on Underpinning Auxiliary Bldg & Feedwater Isolation Valve Pits
ML20031G387
Person / Time
Site: Midland
Issue date: 09/30/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20031G388 List:
References
14110, NUDOCS 8110220338
Download: ML20031G387 (3)


Text

_ _ - _ _ _ _ _ _ _ - _ _ _ _ _

l O Consumers Power James W Cook pgpgY wuana un Vice President - Projects, Engineering and Construction General offices: 1345 West Parnall Road, Jackson, MI 49201 * (517) 788 0453 September 30, 1981 D

b W

ll i

~

Harold R Denton, Director Office of Nuclear Reactor Regulation b

OQ[gg I

fb LE US Nuclear Regulatory Commission g

Washington, DC 20555 g

gm-Q D

M/

MIDLAND PROJECT s

,,3 DOCKET NOS 50-329, 50-330 N

SUBMITTAL OF THE AUXILIARY BUILDING DYNAMIC MODEL, SERVICE WATER PUMP STRUCTURE DYNAMIC MODEL AND DESCRIPTION OF SOILS SETTLEMENT REMEDIAL FIX FOR THE AUXILIARY BUILDING FILE 0485.16, B3.0.1 SERIAL 14110

REFERENCES:

(1) JWCook Letter to HRDenton, Serial 11625 Dated March 23, 1981 (2) JWCook Letter to HRDenton, Serial 13738 Dated August 26, 1981 ENCLOSURES: (1) Service Water Pump Structure Seismic Model (2) Auxiliary Building Seismic Model (3) Technical Report on Underpinning the Auxiliary Building and Feedwater Isolation Valve Pits In our previous correspondence of August 26, 1981 (Reference 2) construction permit level design information relating to the remedial actions for the service water pump structure was provided to the staff. Enclosed are twenty-five (25) copies of the report (Enclosure 1) entitled " Service Water Pump Structure Seismic Model" which is based upon the design information already forwarded to the NRC.

In addition, we are providing twenty-five (25) copies each of two repor'.s, Enclosures 2 and 3. describes the seismic model for the auxiliary building for computing the building response to seismic loading as wel_ as to generate instructure response spectra. Enclosure 3 represents the construction permit level of design information for the auxiliary building remedial actions. All three of the enclosed documents are provided to complete commitments contained in the " Statement of Agreement" from the ASLB Prehearing Conference Order of May 5, 1981.

The seismic model reports for the service water pump structure and the auxiliary building include the following information:

(1) model description, (2) soil-structure interaction considerations; (3) the dynamic model propertiea; and (4) fundamental frequencies and mode shapes. The auxiliary building m) del includes full underpinning of the control tower and electrical penetratt.on areas, integrally tied to the main auxiliary building at Column Line H.

The service water pump structure model includes fula. underpinning of the northea.

I 8110220338 81093d t

PDR ADOCK 05000329

(

A PDR al j

k 4

J

2 portion of the building originally supported by the fill. The models reflect the underpinning currently planned and, therefore, are subject to possible revision after the final building structural analysis and NRC staff review is completed. We believe that the enclosed reports combined with our scheduled meeting with the staff during the week of September 30, 1981 provides sufficient information to pemit the NRC to review and provide its concurrence with the proposed remedial actions. Your expeditious review and approval would be most appreciated to support the hearings and construction of the remedial work.

%l j'

7 9, gg,g JWC/RLT/bh CC Atomic Safety and Licensing Appeal Board, w/o CBechhoefer, ASLB, w/o MMCherry, Esq, w/o RJCook, Midland Resident Inspector, w/o RSDecker, ASLB, w/o DHood, NRC, w/a (2)

DFJudd, B&W, w/o JDKam, NRC, w/a FJKelley, Esq, w/o RBLandsman, NRC Region III, w/a WHMarshall, w/o W0tto, US Army Corps of Engineers, w/a WDPaton, Esq, w/o IRinaldi, NRC, w/a HSingh, Army Corps of Engineers, w/a BStamiris, w/o FPCowan, w/o

.t 3

BCC RCBauman/TRThiruvengadam, P-14-400, w/a WRBird, P-14-418A, w/a J

JEBrunner, M-1079, w/a AJBoos, Bechtel, w/a WJCloutier, P-24-611, w/a BDhar, Bechtel, w/a BFHenley, P-14-100, w/a RWHuston, Washington, w/a GSKeeley, P-14-113B, w/a DBMiller, Midland, w/a MIMiller, IL&B, w/a KBRazdan, P-13-220, w/a

]

JARutgers, Bechtel, w/a i

SLSobkowski, Bechtel, w/a TJSullivan/DMBudzik, P-24-517, w/o l

NRC Correspondence File, w/a l

3 i

j i

e 1

4 i

i 4

oc0981-0446a100 s

-. -,. ~, -..,

.-. -., _,--,.-. - _..- -