NRC MONTHLY OPERATING REPORT OPERATING

SUMMARY

- SEPTEMBER, 1981 UNIT 2 The Unit began the month at approximately 96% full power due to turbine control valve oscillation problems. On 9/3/81 power was reduced to 91% full power to perform maintenance on No. 4 control valve. The Unit was brought to 100% full power on.9/9/81 and operated there until 9/13/81, when.once again power was reduced to approximately 98% due to a control valve oscillations. On 9/16/81 power was further reduced to 87% because of continued control valve oscillations. On 9/17/81 power was increased to 100% full power after the throttle pressure limiter card was replaced in order to stop control valve oscillations. The Unit operated at 100% full pcwer until 9/22/81 when power was reduced to 90% because of problems with 2E4A Feedwater Heater Extraction Line expansion joint. Later that day power was reduced to approxi-mately 75% full power per General Electric recomendations due to the expansion joint failure On 9/24/81, power was reduced to 60% because of condenser tube leaks. This was temporarily fixed and power was returned to 705 Mw electric (the G.E. power restriction limit) on 9/25/81. On 9/27/81 the Unit was taken off line to repair the 2E4A Feedwater Heater Extraction Line expansion joint and to do other maintenance. The Unit remained at cold shutdown the remainder of the month.

A revision to the Unit shutdown and power reduction form for July,1981, is attached per conversation with NRC, Mr. Phil Ross.

The change was made to Outage 81-06, dates 810703 and 810704. The type of outage was changed to scheduled from forced.

8110210106 811013 DR ADOCK 05000

OPERATING DATA REPORT DOCKET No. 50-358 DATE 10-12-81 CONIPLETED BY L S. Bramlett TELEPilONE 501-968-2519 OPERATING STAT US Arkansas Nuclear One - Unit 2 Notes

1. Unit Name:

September 1-30

2. Reporting Period:

3.' Licensed Thermal Power (N1Wt).

2815 942.57

4. Nameplate Rating (Gro.s SlWe):

912

5. Design Electrical Rating (Net 51We):

897

6. Stasimum Dependable Capacity (Gross 51We):

858

7. Stasimum Dependable Capacity (Net Mhe):

S. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:

None

9. Power Lesel To which Restricted. lf Anv (Net MWe): None
10. Reasons For Restrictions. If Any: N/A' This Manth Yr..to.Dat e Cumulatise 720.0 6551.0 13295.0
11. Ilours In Reporting Period 629.6 3969.7 9000.5
12. Number Of flours Reactor Was Critical
13. Reactor Resene Shutdown flours 0.0 54.9 859.5 629.2 3787.3 8703.3
14. Ilours Generator On-Line
15. Unit Resene Shutdown liours 0.0 0.0 75.0
16. Gross Thermal Energy Generated (MWil) 1642125.

9329042.

21173204.

537848.

3042385.

6875286.

17. Gross Electrical Energy Generated iMWil) 512311 2899299_.

6546496.

18. Net Electrical Energy Generated (MWill 87.4 57.S 65.5
19. Unit Senice Factor 87.4 57.8 66.0
20. Unit Asailability Factor 82.9 51.6 57.4
21. Unit Capacity Factor (Using MDC Net) 78.0 48.5 54.0
22. Unit Capacity Factor (Using DER Net) 12.6 S.9 20.2
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months tType. Date,and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Pru,r to Commercial Operation):

Forecast Achiesed INITI A L CRITICA LITY INITI A L ELECT R: CITY COMM ERCI AL OPER ATION (0/77 )

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-368 UNIT DATE 10-12-81 COMPLETED BY L. S. Bramlett TELEPHONE

~

~

MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(ywe.ses, i

R39 818 j7 2

841 887 is 3

852 886 9

4 858 884 20 5

865 879 2,

863 765 6

_3.,

7 846 655 23 8

864 24 609 9

877 528 25 to 881 26 662 11 881 76 27 880 0.0

,8 13 864 29 0.0 860 0.0 14 30 15 843 3,

785 16 INSTRUCTIONS On this format, list the aver'ge daily unit power leselin MWe. Net for caeh day in the reporting:nonth. Compute to the nearest whole megawat 9

(9/77)

, +

--n

,.a---

,,,.-..,.----c.,--

,--n n.----.

50-368 DOCKET NO.

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME ANO-Unit (J DATE 10-7-8i COMPLETED BY L. 5. Bramlett September TELEPHONE (501) 964-3145 REPORT MONTil

~.

E c

50 "h

-*EU Licensee En Et Cause & Corrective No.

Date j!

3:[$

Event h

h'8 Action to V

Prevent Recurrence y:

t 5 =g Report e mo H

eu e

C 81-19 810922 F

0 A

9 None HJ PIPEXX FW extraction line failure, reduced power to 705 Mwe per G.E.

81-20 810927 F

90.8 A

1 None HJ PIPEXX Shutdown to make repairs on FW extraction line failure and other equipment maintenance items.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram-Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination 5-Load Reduction 5

F Administrative 9-Other Exhibit I - Same Source G-Operational Error (Explain)

(9/77)

Il Other (Explain)

50-368 DOCKE1NO.

UNII SilulDOWNS AND POWER REDUCTIONS UNIT NAME ANU-Un1t 1I DATE 8-6-81 COMPLETED BY S. Bramlett July (Revised)

TELEPHONE 50l}964-3145 REPORT MONTil

[5 ?

3 h.$ k Licensee

,E g Cause & Corrective c-Action to f'?

No.

Date g

3g

{

jg5 Event 77 Prevent Recurrence

$5 5

jig Report #

EU H

6 81-06 810328 S

87.7 C

4 None ZZ ZZZZZZ Refueling 810701 S

1.5 8

1 None ZZ ZZZZZZ Low Power Physics Testing 810703 S

2.2 H

3 None ZZ ZZZZZZ Low Steam Generator Level 810704 S

24.5 F

1 50-368/024 ZZ ZZZZZZ T.S. 3.6.1.4 81-07 310705 F

.2 H

3 None ZZ ZZZZZZ Reverse Power Trip 81-08 810705 F

13.8 B

1 None CH VALVEX Maintenance on FW Block Valve i

81-09 810707 F

2.7 H

3 None ZZ ZZZZZZ Reverse Power Trip I

810707 F

1.9 H

3 None ZZ ZZZZZZ High Steam Generator Level 81-10 810713 F

35.1 A

1 None CH INSTRU Failure of circuit board in "A" MFW pump rpeed sensing circuit

(

81-11 810718 F

5.1 B

3 None ZZ ZZZZZZ PLCEA #26 Dropped I

l l

l 3

4 l

2 Exhibit G-Instructions Method; F: Forced Reason:

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance oi Test 2 Manual Scram.

Entry Sheets for Licensee 3 Automatic Scram.

Event Report (LER) File (NUREG-C-Refueling 4 Continuation 0161)

D Regulatory Restrictior.

i E-Operator Training & License Examination 5-Load Reduction 5

F Administrative 9-Other Exhibit I - Same Source G-Operational Error (Explain)

W/77)

Il Other (Explain)

l o

em M REFUELING INFORMATION 1.

Name of facility.

Arkansas Nuclear One - Unit 2 2.

Scheduled date for next refueling shutdown. 9/1/82 3.

Scheduled date for restart following refueling.

11/1/82 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Yes.

Description of effects of new core loading.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6/1/82 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Possible utilization of Core Protection Calculator (CPC) semi-addressable constants.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

a) 177 b) 60 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

present 4R5 increase size by 0

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE:

1989 J