ML20031F715

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-1201/81-10 on 810831-0904.No Noncompliance Noted
ML20031F715
Person / Time
Site: 07001201
Issue date: 09/30/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Alto R
BABCOCK & WILCOX CO.
Shared Package
ML20031F716 List:
References
NUDOCS 8110200359
Download: ML20031F715 (2)


Text

F ye/Av

~

SEP 3 01981 Babcock and Wilcox Company ATTN: Mr. R. A. Alto, Manager fp [g 1* JU4 'h '3 C

Virginia Operations, Nuclear Materials and !!anufacturing Division

,2

'y Comercial Nuclear Fuel Plant OCTI 91981- ;j P. 0. Box 800 y,,, mum Lynchburg, VA 24505

\\%

cc= c.,

Gentlemen:

-'l Q \\'

Subject:

70-1201/81-10 This refers to the routine safety inspection conducted by fir. G. P. Coryell of this office on August 31 - September 4,1981, of activities authorized by NRC License No. SNM-1168 for the Commercial Nuclear Fuel facility and to the discussion of our findings held with you and members of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR -.790 of the Commission's regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office by i.elephone within ten days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days are available for your review, please notify this office promptly so that a new due date may be established.

Consistent ~with section 2.790(b)(1), such application mot be accompanied by an affidavit executed by the owner of the information which identifies the document or part thereof sought to be withheld, and a full statement of the reasons on the basis of-which it is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Roor...

-pfp1 s

8110200359 810930 PDR ADOCK 07001201

((g]

C PDR

Babcock and Wilcox Company 2

SEP 3 01981 Should you have any questions concerning this letter, we will be O ed to discuss l

them with you.

Sincerely, Paul J. Kellogg, Chief Projects Branch 2, Division of Resident and Reactor Project Inspection

Enclosure:

Inspection Report No. 70-1201/81-10 bec w/o encl:

License Fee fianagement Branch Document Management Branch Comonwealth of Virginia i

i i

RI RII I

PC ell:dt PJ logg 9 7 /81 9

/81 l

i