Summary of 810915 Meeting W/Util Re Open Items in Chapter 14 Review Covering Initial Test Program
ML20031F500
Person / Time
Site: 05000470
Issue date: 10/06/1981
From: Kerrigan J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8110200012
Download: ML20031F500 (4)


Text

-

\\

't

(

i

.S-h %

w e

oc

)&

Docket No. STN 50-470 DCT C 19gj E,

DCT 9193;w

['%

  • TuilEy*

APPLICANT: Combustion Engineering Inc.

N FACILITY:

CESSAR Standard Nuclear Steam Supply System

'k\\

SUBJECT:

SIMIARY OF MEETING TO DISCllSS INITIAL / TEST PROGRAM OPEN ITEMS On September 15, 1981, a meeting was held with representatives of CE to discuss the open items in the Chapter 14 review. A list of meeting attendees is enclosed. CE's draft responses to the staff's questions (letter from R. Tedesco to A. Scherer dated July 16, 1981) served as the basis for discussions.

All draft responses were found acceptable by the staff with the fcnlowing exseptions:

640.1 Responsibility for reviewing this item has been transferred j

to LQB; the staff will notify CE hhen the LQB review is complete;

~

640.4 The following items are within the BOP scope: A.1.b(7),

A.4.d. A.9.a. A.1.c. and C.1.1,;

640.7 (2)(b)

CE is taking exception to the staff position that 10 l

additional measurements for the CEA drop time tests must be performed; the staff will discuss the CE position I

(perfomance of 3 additional measurements) internally i

to determine if an appeal meeting is necessary; 640.9(3)(c)

The staff will clarify whether H0T STAND 8Y or HOT SHUTDOWN is being discussed; 640.9(8)

The draft response only discusses demonstration of steam bypass valve capacity; the operability of these valves must also be demonstrated; a separate test abstract is not necessary if the valve ope'rability is demonstrated in another test; 640.11 (4)

The scale of the sump model test must be provided and justified; 8110200012 81100 ~

PDR ADOCK 05000470 A

PDR omen >

... ~. - -.....

. ~ ~ ~

... " ~ - - -

~ ~ ~ ~ ~ ~

~ ~ ~ " ~ ~

SURNAME)

....... "... " ~ "

. "~"..- """

~ * ~ """"""*

.......~.. ~

~~."~~ --

- ~ ~ ~ ~ ~

- *~ '~ *" "

~ ~ ""

onn >

l OFFICIAL' RECORD COPY

_-.____._-.__.-_,-mm_. -,. -

usam mi

. nac ronu sia 0o.803 nacu oua

w.

M s.

1

'L-6 g

640.12 (1)

The draft response to this part has not yet been received; 640.12 (2)

CE should clarify the tenn " indirect methods" found in the i

draft response; 640.13 CE is taking exception to this position; the test program should be expanded for follow'on CESSAR plants; the staff will discuss CE's position internally to determine if an appeal meeting is necessary; 640.15 CE is taking exception to the position that the test be perfonned at or near 100% power; the staff will discuss CE's position internally to determine if an appeal meeting is necessary; 3

1 The CE representatives connitted to provide a cate for their formal submittal to the CESSAR project manager by September 18, 1981.

$0IhE SIGNED BY:

J. Kerrigan, Project Manager Licensiing Branch #3 Division of Licensing i

cc:

C. Grimes J. Miller W. Long D. Ziemann DISTRIBUTION:

Mtg. Sungnary Dist.

JKerrigan 1

f d

f S.S.P,B,: D,1.,@,,(B #3 : Dg,,,,,,,

,D 1.,,,,,

on.cs >

cuanaue)..@.C.!.9.9 s,1,k,a,,h,,,4,I.. ;....,18.1

. 1d/..../..li,a,,,,

,0,,,,

,.r.ag

..l.01..~.5.....zal..1.0

...za.1 om>

Nac ronv aia tio.ao> uncu ouo OFFICIAL RECORD COPY usago mi._m.

t' LT ; N r. r.0".:. ' : : 15 ' t '

! 10!<

c re nna nni n7;9n t SpEr.l AL PRO.ta,l', tsw.Ln

':!S!0.'! 0F LICE!!S!":

Decket Files HRC PDR Local PDR TERA fiSIC SSPB Reading H. Denton E. Case D. Eisenhut R. Purple R. Tedesco G. Lainas ' -

J. Roe G. Zech J. Heltemes S. Varga T. Ippolito R. Clark R. Reid B. Youngblood A. Schwencer F. Miraglia E. Adensam D. Crutchfield DELD IF,E (3)

ACRS (16)

PPAS B. Grimes H. Collins F. Pagano S. Ramos J. Krammer D. Vassallo P. Collins D. Ziemann N. Hughes R. Bosnak H. Brammer D. Terao

,w-

i

(

..a..

  • Chapter 14 Working Meeting September 15, 1981 Name Organization Karl Gross APS Nuclear Engineering, Lic.

Chuck Bischoff Snell & Wilmer Bill McTan APS Startup Wes Hartley APS - Manager of Operations Richard Badsgard APS - Licensing J. Kerrigan NRC W. Long NRC W. J. Apley Battelle S. Frost APS - Licensing Paul Wolfe CE - Protect Office Jonn Rec CE - NSSS Testing Henry Windsor CE - NSSS Testing

.