IMPLEMENTATION OF EARLY WARNING SYSTEMS-BACKGROUilD EMERGENCY PLANNING RULE PUBLISHED AucuST 19, 1980 NOVEMBER 3, 1980 EFFECTIVE MAJOR ELEMENTS I
SusMIT PLANS JANUARY 3, 1981 SusMIT PROCEDURES MARCH 1, 1981 IMPLEMENT PLANS APRIL 1, 1981 EARLY WARNING SYSTEM JULY 1, 1981 ISSUE HOW TO ENFORCE IMPLEMENTATION OF EARLY WARNING SYSTEM DUE JULY 1, 1981 ee
' d.
O S
e e
e t
8 as.. _.
'n. -
IMPLEMENTATION PROBLEMS
- EXTENSIVE TIME REQUIRED FOR -ENGINEERING STUDIES.
- OBTAINING DESIGN CONCURRENCE FROM LOCAL COUNTIES, STATES, AND FEMA.
- OBTAINING NECESSARY PERMITS FROM NUMEROUS GOVERNMENTS.
- NEGOTIATIONS FOR PUBLIC AND PRIVATE RIGHT-OF-WAYS.
- DELAYS IN EQUIPMENT DELIVERY.
1
- INSTALLATIONS IN OTHER UTILITIES SERVICE AREAS.
- OBTAINING FCC LICENSE FOR THE FREQUENCIES NEEDED TO ACTIVATE THE SIRENS OR THE NOAA WEATHER RADIOS.
- CONTROL INTERCONNECTIONS WITH COUNTY SPECIFIC EQUIPMENT.
NOTE:
SEVERAL LICENSEES HAD REQUESTED RELIEF FROM DAT BEFORE July 1, 1981.
CURRENT COMMISSION ACTION WILL BE THE RESPONSE TO THESE REQUESTS.
e 9
h.
..=a._,
n
h--_.
--A sm,,
8 y
f i
1 t
9 t
l p
1 ENFORCEMENT OPTIONS i
o i
NO ENFORCEMENT OF RULE CHANGE DATE 1
CHANGE REQUIREMENT DELAYED ORDERS OR CIVIL PENALTIES IMMEDIATE ORDERS OR CIVIL PENALTIES l
1 I 1
1.
e i
p.
e
_ (
~,...=
I 4
. ).
,t Nl W
e g 4 '
g l1
-C
.--m
PRINCIPAL OPTIONS
[
OPTION 1
- CHANGE DATE AND EVALUATE' INSTALLED SYSTEMS OPTION 2 PRESCRIBE CIVIL PENALTIES AFTER A DATE CERTAIN (DATE SET TO ALLOW FOR GOOD FAITH EFFORTS TO COMPLY)
D
=
l l
l
'y.
e l
l l
e e
l i
,I a r..:a, 7.
. l..
.~.
i C0NSIDERATIONS IN MAKING DECISION'
~
l l
RULE REQUIREMENT WAS CONTROVERSIAL INITIAL AND CONTINUED EFFECTIVENESS OF PUBLIC EDUCATION PROGRAMS RELATING TO PROMeT NOTIFICATION SYSTEM NOT KNOWN
- WILL PEOPL'E REMEMBER WHAT TO D0?
' SHOULD MORE STUDIES BE CONDUCTED?
LACK OF COMPLIANCE WITH COMMISSION REGULATION IS SERIOUS,
- WILL PROSPECTIVE CIVIL PENALTIES OBTAIN QUICK COMPLIANCE?
' WHAT WILL PUBLIC PERCEPTION BE OF NON-ENFORCEMENT?
IS ENFORCEMENT OF CIVIL PENALTIES FAIR IN CASES WHERE LICENSEES DO NOT HAVE DIRECT CONTROL OF ALL FACTORS AFFECTING. COMPLIANCE?
9 0
?
.de
' 5 O
- G 9,.
O e
{
1 o
NUMBER-IN~EACH CATEGORY F'
1 p
i CATEGORY NUMBER PERCENT A (COMPLETE BY JULY 1) 6 12.5%
B (Now COMPLETE) 4 8,3%
i B (PARTIALLY OPERATIONAL) 5 10.4".
B (SYSTEMS ORDERED) 16 33,3%
C (EQUIPMENT NOT ORDERED BY JULY 1) 17 35.4%
e i
6 i
'3..
l l
..L
. ~~
9
{.
- ~. -
s
t l
k f
r I:
r F
e CATEGORY A FACILITIES i
r FACILITY COMPLETION DATE CALVERT CLIFFS 6/29/81 CRYSTAL RIVER 7/01/81 HATCH 7/01/81 MCGutRE 7/01/81 i
OCONEE 7/01/81 ARKANSAS 7/01/81 i
4 e
i i
="
' w... !
i r
k i
(fl g
l 4
CATEGORY B FACILITIES
- PROJECTED COMPLETION DATE FOR ALL FACILITIES - JANUARY 1,1982 FACILITIES PROJECTED COMPLETION DATE COOPER IiOW COMPLETE (7/31/81)
MAINE YANKEE NOW COMPLETE (7/27/81)
SAN ONOFRE NOW COMPLETE (8/7/81)
TROJAN NOW COMPLETE (7/2I4/81)
BRUNSWICK 9/30/81 (PARTI ALLY OPERATIONAL)
ROBINSON 9/30/81 (PARTI ALLY OPERATIONAL)
FARLEY 10/1/81 (PARTI AL(Y OPERATIONAL)
NORTH ANNA 10/31/81 (PARTIALLY OPERATIONAL)
SURRY 10/31/81 (PARTIALLY OPERATIONAL)
SEQUOYAH 8/01/31 COOK 8/07/83 TMI 8/31/81 SALEM 10/01/81 1/1/82 INDIAN POINT 2/3 10/22/81 0YSTER CREEK 10/81
[y.
~
FITzPATRICK/NINE MILE POINT 10/81 GINNA 11/05/81 VERMONT YANKEE 11/30/81 YANKEE R0WE 11/30/81 G
O 0
-er
CATEGORY B FACILITIES (CONTD)
FACILITIES PROJECTED COMPLETION ~DATE BEAVER VALLEY 11/81 PILGRIM
^
12/31/81 ST. LUCIE 12/31/81 TURKEY folNT 12/31/81 FT, CALHOUN 1/01/81 DAVIS-BESSE t
t
' s.
- EculPMEnT UnsITE - AWAITING FCC FREQUENCY CLEAPANCE 4
7 c
.1
M CATEGORY C FACILITIES PROJECTED COMPLETION DATE FOR MOST FACILITIES MID 1982 FACILITY PROJECTED COMPLETION DATE DUANE ARNOLD 10/01/81 KEWAUNEE SPRING 82 BROWNS FERRY 11/81 - EARLY 82 DRESDEN 3/82 POINT BEACH 2/82 QUAD C; TIES 4/82 ZION 4/82 PRAIRIE ISLAND 5/82 (5 f1ILES ONLy PROPOSED)
RANCHO SECO 5/82 MONTICELLO 6/82. (5 t1ILES ONLY PROPOSED)
PALISADES 6/81*
HADDAM NECK MID 1982 MILLSTONE MID 1982 PEACH BOTTOM 7/82 BIG ROCK POINT FT. ST, VRAIN
~
LACROSSE 10/12/81 (1-1/4 MILES ONLY -- -
PROPOSED)
SY_STEli COMPLETE TO 5 MILES - NO PROPOSAL FOR S TO 10 MILES LICENSEE REQUESTED TOTAL EXEMPTION FROM RULE
.e
~-
M OPTION 2 CATEGORY ENFORCEMENT A
SYSTEM FULLY OPERATIONAL NONE i
BY JULY 1, 1981 B
SYSTEM NOT OPERATIONAL SEVERITY LEVEL IV EQUIPMENT ON ORDER l
- FOUR MONTHS TO CORKECT l
- CIVIL PENALTY -
$15,000/ DAY ACTER l
FOUR MONTHS UNTIL I
OPERATIONAL I
C SYSTEM NOT OPERATIONAL SEVERITY LEVEL III i
EQUIPMENT NOT ON ORDER I
l
_ FOUR MONTHS'TO CORRECT,
- CIVIL PENALTY -
$40,000/ DAY AFTER FOUR M0,NTHS UNTIL-OPERATIONAL LG Y,
,i