ML20031E985
| ML20031E985 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 10/09/1981 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML20031E987 | List: |
| References | |
| NUDOCS 8110160646 | |
| Download: ML20031E985 (1) | |
Text
.-
p sic
[f
+
o UNITED STATES g
\\ )
g NUCLEAR REGULATORY COMMISSION g
e E WASHINGTON, D. C. 20555
\\ %"J
- ..+,e October 9,1981 50-322 Shoreham MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM:
Director, Divison of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The submitter of the attached document has expressed no desire to withhold any information contained therein.
Therefore, this material may now be made publicly available.
s ff/
g(
J. M. Felton, Director Division of Rules and Record
/
Office of Administration
Attachment:
As stated h
(h$0([l)'
& OCT 9193;, e
" Myn= -
4 e
un 8110160646 91100'9:
PDR ADOCK 05000322 F
~
LONG ISLAND LIGHTING COM PANY FLC'O SHOREHAM NUCLEAR POWER STATION amaw P.O. BOX 618. NORTH COUNTRY ROAO e WADINO RIVER, N.Y.11792
,2 m,m.v..,wt_
October 1, 1951 SNRC-623 Mr. Harcld R.
Denton, Director 4
D/
D Office of Nuclear Reactor Regulation k
8kbLj gh*.h @'
U.S. Nuclear Regulatory Commission I
Washington, D. C.
20555 OCT 6Ib8Ih -
~'
Revised Shoreham Nuclear Power Station Emergency Procedures
( " Q "SuAma I Shoreham Nuclear Power Station - Unit 1 D
t-gT\\$, s'S/
Docket No. 50-322 9
Dear Mr. Denton:
Attached are fifteen (15) copies of the Shoreham Nuclear Power Station Emergency Procedures, Revision E, based on the General Electric BWR Emergency Procedure Guidelines.
These procedures hase been revised based on the comments of the September 16, 198. meeting between LILCO (H. Carter), the NRC (S. Clifford)
L and Battelle Pacific Northwest Laboratories.
These revised procedures will be used for the emergency procedure demonstra-tion at the Limerick Simulator on 10/16/81.
Also included is the latest revision of the BWR Owner's Group Emergency Procedure Guidelines.
It is requested that these procedures and the guidelines be reviewed prior to the Emergency Procedure Demon-l stration at the Limerick Training Center.
1 Very truly yours, g][ 35~h oc'
/
B. R. McCaffrey /
Manager, Project Engineering Shoreham Nuclear Power Station RWG:mp Enclosures cc:
J.
Clifford 0
[@
H. Carter g
J._Higgins n,,mmm..,
, s CF ACON O*OOO22C
-GE F C-893 S
REGULAT3RY ItFOR4ATION DISTRIBUTION SYSTEM (RISS)
ACCESSION N 3 R : 51 ! ? " I ' : ^. 7 -
00C.3 ATE: 81/10/01 NOTARIZED: No 30;KET's FACIL: 53-3?.2 Snorehen. Suelear sower Station, Long Island Lignting 35000322 aVTi,NaME AUTH]R AFFILIATION MCCAFFREY,$,4 Long Island Lignting.Co.
RECIP.1AME RE;I?IENI AFFILIATION DENT 3N,i.R.
Office of Nuclear Reactor Regulation, Director.
SUBJECT:
Forwards Ce, test Files version of draft Revision E to inolenenting.scocedures for emergency olan.Reviseo scoceoures are casea on comments orovided at $10916 neeting
- /NRC & BNnL, DIST91SJTIJN C30E: X305S COPIES RECEIVED LTR
_ENCLdhI SI Z E: _[]I/d)JE)__
TITLE: Emerg Dian (CF Avail)
NOTES:
RECIPIENT COPIES RECIPIENT CO*IES I) CO DE/N AM E-LTTR ENCL 13 CODE /NAME LTT9 ENCL ACTION:-
LI; SR #2 SC 1
0 dILSON, JERRY 07 1
1 INTERNat: OI4,EMER PL 2RJ 1
0 Effi3577%
02 1
1
~"~
FE9A-REP OIV 09 1
1 I & E-OS 2
1 IE/EPDB.
05 1
1 IE/EPLS 03 3
3-RA] AS4T BR 1
0 REG FILES 01 1
1 fr' w
/
fi 6'
7 TOTAL NUMBER: 0F COPIES REGUIRED: LTTR 13 ENCL 9