e e
BOSTON EDISON COMPANY DENERAL OFricts 800 BovLaTON STmEET BomTON MASSACHUBETTs 02199 A. V. M O RISI MANAGER NUCLEAR OPERAT10NB SUPPORT DEPARTMENT October 8, 1981 BECo. Ltr. #81 242 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washing;, D. C.
20555 License No. DPR-35 Docket No. 50-293 NUREG 0612 Control of Heavy Loads p5'~'k
Reference:
(a) NRC letter of Deccmber 22, 1980
. [-
(b) Boston Edison letter of June 15, d IS8lb b
,N "Myrom E/
1981 from Mr. A. V. Morisi to Mr. D. G. Eisenhut (BECo. Ltr.
O j
- 81-141)
\\
Dear Sir:
The following contains the response to your letter of December 22, 1980, Sections 2.2 and 2.3:
1 Responseto2.p.3d A verification program dealing with the requirements referenced in 2.2.3d is in progress.
Due to the time required to develop specific questions on lift rigs, and the delay by original suppliers in responding to our inquiries, we l
will be unable to complete our verification program as originally scheduled.
3e date of completion of this item is January 1,1982.
Response to 2.2.3f
-gp A comparison of the key differences between the codes and standards is listed 5
I[l on the attached matrix, which also indicates the BECo arrangement of the crane.
The comparison of the codes show they are very similar.
In many cases, the requirements of the earlier version of the code are more stringent. The dif-ferences between the BEco design and the codes do not in any way affect the i
safe handling or operation of the crane.
l l
Response to 2.2.4 An evaluation program studying the requirements referenced in 2.2.4 is still in progress. Due to the complexity of the task and for the reasons stated in l
8110150232 811008
.PDR ADOCK 05000293 m
Co; TON EDICON COMPANY Mr. Darrell G. Eisenhut, Director October 8,1981 Page 2 2.2.3d, we regret that the evaluation was not completed in time for this response. The completion date for this item is January 1,1982.
Response to 2.3 The required information, such as structural analysis of impact zones, is in prog ress.
Due to the complexity of these analyses, and the number of load /
target combinations, we are requesting an extension to complete this part of the report. We believe, based on the results of our crane analysis in response to section 2.2.3f, the information supplied to you in Reference (b), and the Reactor Building Crane's past safe operating record, that the granting of this extension will in no way compromise safety.
The completion date for this item is April 1,1982.
If you should require any additional information concerning this matter, please contact us.
Very truly yours, P
( J[.-
- /7V%
Attachments
.. _ _. _ ~..
_ _ _ - ~. _ -
COMPARISON OF USAS 910.2.0 AND ANSI BM.2.0 AND EECo REACTOR CRANE OR1CINAL CODE CURRDff REQUltED CG)E Ym USAS 310.2.0 - 19f 7 ANSI 310.2.0 - 19%
CCBtLIANCE PTo Roset3r crane Sneci+1eatten 1.
Clearances from cNtructione Specified as 3" overhead 2" Interally Does not specify clearance dimenstana.
Yes Original code more agco spe pp.m.23-1 Seettaa 3.1.1.3 atriagest Electric Overhead Crane f astitute Spee El Seettaa 3A and B specifles 3* overhead, and 2" laterally.
2 W14ing Per AWS D 2.0-66 Per AWS D lb.1 Yes original code more
,.:e r, pee. 4W-M-23-1 section 3.1.1 stringest Jelding per AWS D 2.0 BBCo Spec. Sectiam 3.1.2.1 Safety Paetor of 5(five) based as sittmate etrength of metal la weld.
3.
ctidera Required to be of adequate destga Tve be destgaed to either Q4AA, AISC, Yes BEo Spee more BEco Spec. (4%-M*23-1 Seettaa 3.1.1.3 epecifies or A158 standarSa.
stringsat EDCI #b1 deatga ertteria with exceptica as noted la items 16 and 17.
6.
Cab C2earances Specified as 3" fram all fixed Does not specify a speettie clearance Yes Original code more BEco Spee. S Wig-23 structures dimension, stringest 5.
Toeboards and Mandra11s Per USAS d 12
- 1932 Per latest 1saus of ANSI A 32.1 Tee RECo 8 pee mom 3kco Spee 6b W-M-23 Sectica 3.1.5 handrail k2* h14b handrail 42" with intermediate halNay striagent with intermediate railing toeplate 6* high steel at between platform and top rails toe
- s11 exposed edges.
plate mialaus bei bt 31/2".
d 6.
Indders Per fjBAS A 14.3 - 1956 Per latest addittom of ANSI lb.)
Yes DEC# Spee nom SEco Spee. 6b@-M-23 Sectica 3.1.' eteel ladders with which requires cages as laddere stringest steel safety eages shall be providt a.
greater thma 20 ft.
7.
Egress fra operator's Cab so mentiau of egrees mecasmunde a moeas of egrose fon Bo paes not affect BEco Spee 6bW-M-23 does not mention egrees emergeselee, safe operattaa EOC1 d61 ale, does not mention agress, of the erana 8.
341dge and Trolley Bumper nocamanda the use of Deper Recamnende the use of D e per. or Yes 3Eco Spee more BEco Spee 6%-M-23 Section 3.1.7 specifies papere other autmatie meene providing stringent for both the bridge and trolley, equivalent effect.
- 9. Bridge and Tmiley area e Trolley holding brakes aised for 50$
Trolley holding brokee aimed for 505 T**
seCo spec more BEco spee. seettaa 3.4.3 specifies artage nad Troller rated motor torque differentiettaa of rated torque at potat of applica-stringent brake lion full rated motor targue.
between Bridge and Trolley holding tion. A differentiattan between BECo be; ding brakes perform all fun-tic 2e of the and action (service) brakes.
Bridge and Trolley helding. service, emergeary brokee.
and emergemey brakes is made.
a CmPARISON OF USAS BM ?d AND ANSI BM.2.0 AND BEco REAC10R CRANE ORIGINAL CODE CuttERT REquitg3 f@g ITDs Ul: A3 B O.2.0 - 1%7 ANSI B M.2.0 - 1 %
CmPLIANCE RDLARES SECe Spee. 68s9619-1 LO*
Electrical Equipment per Article 610 of USAS CI
- 1965 per latest issue or sv?A 70, no Does not affect the per aEC+ apse. Section 3.1.5 spectries width of foot alk Article 610, which requires a 30*
safe operattom of and platform shall be at least 24s inches unotetrueted walkway width la front of electrical the trane width eseept around the bridge motor where it say be e.nclosures.
reduced to 18 inches.
L1. Boisting Ropee Requires selection canaidering the Requires selection considering the Tea BKo %ee more BEco Spec. Seetton 3.3 9 specifiest rated load only.
stringens 1.
Ma?A hoist rope shall be improved plee steel, regular lay, 6 s 37, with independent wire rope core, conforming to Federal Specificatie RRW-410, Type I, Class 3 $3.9 too breaking strength.
Lift capneity 107 tone Lacludes lift block.
2.
Auxiliary hoist rope shall be 7 x 19 etataless steel wire with a stataloss steel core,
- p. BodLO Does not addreas safety latches.
Requires safety latches miess the y,,
agg g,g,,g,,,4 SEco Spee. Sectica 3.3.10 application makes the use of the latch with eefety 1stebes ioyractical.
1.
Aus111ary book shall be of the single type affixed with a safety latch without welding.
2.
Malm hook to a twin (ateter) type with abackle hole, pla, and shackle, all suitable for full rated Land.
L3. Rated Ioad Test Does not specify the estent of Requires traversing the bridge the ye, 31 yeere og plant BKo spee seetten b.1.6 specifies that the rated load traverstog for the bridge and full length of the rummy, and the operettee with test shall be adequate to prove the ability of the t N ier.
trolley the full length of the bridge.
eristaat lead test unit to hartle the load emoothly at any speed withis have demonstrated the speelfled speed rangs. Each main heist brake full traverstag of shall be shawa to be ca,1able of breaking load fra bridge and tselley rated speed and holding rated lead without slippage.
The BEco spee does not specify the extent of traversing for the bridge and trolley.
COWARISGI 0F EDCI AND OtAA !EST3f STRESS CRITDt1A e
calCINAL CODE CuttDff REQUIRED Ces ITDs EDCT El G AA #70 MedPt.! AIUF RDLARIS BECo l'enctor Crane l' pee. 6b9R-te-23-1 Lb. De:1gn stress of Icad carrying shall not exceed 20$ of the asemd Shall act exceed 20$ of the Yes Ortstaat etendarde 3Eco Spec. Sectica 3.1.2.3 opecifies IOCI gi61 paragraph 7 parts empt structural embers average ultimate strength of the p@lished everage ultimate strength genere11y found to be load carrying 1 marts, except girdere and hoisting mpes, material.
of the material.
mere ceaservative than shall be designed so that the calculated static strees gearing and hoisting ropes.
the current required la the material keed on rated load, shall not eveeed 20$
cede of the asemed average altimate strength of the material.
L5. Boieting rope selection The rated capseity load divided by The rated Iced espacity plus the Yes BECe Spee more see Item fil the number of parts of rope shall botte block divided by the ember str*. agent act exceed 20$ of the published of parts of rope shall act eaceed breaking strength of the supe.
20$ of the published breaking strength of the rope.
- 16. Structural Material selection A3Bt-A7 or suitable alternate ANDI-A36 or emitable alternate fee BEco. O more 35Ce Spee. Secties 31.1.3 speifies ASTM A-36 and A-2b2 etttar~A$.
- 17. Basic al1<nrable stresses for Tensim = 16,000 pai Tension = 17,600 pei Yee Original ude more BBCo Spee. Section 3.1.2.3 opecifies IOCI #61 bridge girders.
Cm pressica e 16.000 poi Campression = 17,600 psi stringent Shear = 12,000 poi Shear = 13,200 pai
- 18. Basic allavable stresses for Shall not exceed 20$ of the asemed Tensica e Ib, BOO poi Yes Original code more BECo Spec Section 3.1.2 3 epcifies EDCI #61 and trucks.
average altimate strength of the C apressian = 14.400 pei stringent material.
Shear = 10.800 psi
& Basic allavable stresses for Same se Item #18 Same me Item #18 Yes original code more Same me Item #18 stringest trolley frames.
S% Gear Etrength Shall be such that the stress in the shall be ta acecreenee with the Yes SEco spee more EEco Spc. Section 3.3.6 ryecifies in accordance with material does not exceed 20$ of the Ameriesa Oear Mfre. Association stringest AGNA standards.
asamed average ultimate strength (AGNA) standard.
of the material