Text
SNUPPS Standardized Nuclear Unit Power Plant System 5 Choke Cherry Road Nicholas A. Petrick Rockville, Maryland 20850 Executive Director (301)869 8010 October 2, 1981 SLNRC 81-117 FILE: 0290 SUBJ:
PSB Review Mr. Harold R. nton, Dirarter 8
Office of Nuclear Reacto" Regulation ULJ U. S. Nuclear Regulatory Conmission
'J J 0g7 g OOM le Washington, D. C.
20555 i
u.s.
Docket Nos.
STN 50-482, STN 50-483, and STN 50-486
@/]
Dear Mr. Denton:
/
The referenced letter forwarded an attachment to a test report on electrical penetration assemblies.
Per the request of Dr. Gordon Edison, the entire test report noted below is forwarded herewith.
Very truly yoi.!: s,
-e4<
Nicholas A. Petrick RLS/intk
Enclosure:
Report No. 123-2222, " Design Qualification Report for Electrical Penetration Assemblies" cc:
G. L. Koester KGE D. T. McPhee KCPL D. F. Schnell UE W. A. Hansen NRC/ CAL T. E. Vandel NRC/WC QodJ.
\\
aum A
....