ML20031C851

From kanterella
Jump to navigation Jump to search
Contract: Maint & Operation of Local Public Document Rooms (Lpdrs), Awarded to White Plains Public Library
ML20031C851
Person / Time
Issue date: 09/22/1981
From: Dow O, Perlman J
NRC OFFICE OF ADMINISTRATION (ADM), WHITE PLAINS, NY
To:
Shared Package
ML20031C829 List:
References
CON-NRC-10-81-697 NUDOCS 8110090030
Download: ML20031C851 (9)


Text

_ _ _.

v8 01 C#

STAN?','D fcEM 28.'JUtY i966 l

AWARD /CCNTRACT j

7 e t t i. A. t s u vice s. =,. :i - i.. c~

TiAn n 3.

C. o c. m C ei

-.f rACT f f %.c test 1.i.us. ) NO 2.177tCTivE C Aff

3. fi-QutSITCHiPJacmA$t t!CLtsTipsCJECT NO.
d. CERfif ttD #CE N ATIO Nit GiftN15 UNGit LOSA l'RRC 81 - 69 7 SEP 17190 RFPA ADM-81-6'97

" k'c'" * ' * * ~ ' "

i A

3.issuto av cove l

.. Ac..N.: sri ie av coorl

i. citivi.,

'0 ' 5 5"-

"/"'"'*"*"*"

US Nuclear Regulatory Commission NATICN Division of Contracts Sall Purchases Section g f,7,','/#"

Washington, DC 20555

s. co m a4cica c,or j l

raciury coor j

.. D.sCcu~T :o= ric-n, AT TNT

~ w t tuo sectess White Plains Public Library f4A ATTN:

Orrin B. Dow, Director

< s-,u. u,,.

'~"

5""-

100 Martine Avenue aan ZIP ad.)

White Plains, NY 10601 i e. sus.ur N.o,Ces u,,,,.

..iu,.,3,1 spug,s) to A::uss 5 owN is stocr i t.

PAvutNT wiu BE MADE EY CooEl ii. sme To/m ica coot l l

US Nuclear Regulatory Commission US tiuclear Regulatory Comnission ATTN:

Jona Souder, LPDR, 309 Offici. of the Controller Washington, DC 20555 Washington, DC 20555 0 ie u.5 c :):' '. x >

i3 fHIS F2OCUEtwtNT W A$

ADVIETiltD, Nf 0CT&&TTD, PUR$UANT TQ-

@ e i u.s.t. 2:2 too 1 i4. ACCO' 'NTiNG A* D A PP EO P' LTICN DATA f

Appn:

31XO200.401 B&R:

46-20-25-902 - $5,285.00 u.

ii.

ii.

i,.

2e.

i3 SUPPtif 5/SE8viC15 C U A NTITY UPl:7 UNf7 Place A.kCUNT ITi m NO.

Maintenance and Operation of Local Public

$5,285.00 Document Rooms (LPDRs) a 8110090030 810922 I

,- PDR CONTR toTAt Auousi or cosia4c: s 3D,d,0.UU NRC-10-81-697 PDR CONTRACTING OFFICER it'lLL COMPLETE BLOCK 22 OR 2G AS APPLICABLE

22. @ CcN:tacter s Ntoctistro A0sitaatNT (cea,r uer u reg.,r,/ se,,r=
26. O Aw Aso (ceanauer si aer ret.ned se si a this sw..aeer.)

Y 5"

t 3 _ upon i. iso..s of u.)

.ee<i.d.a. m.

Cea

.c....or.

. s ei.<,,.... N.,- se ru, du

r., a,,d res..,, _

. v......, i s.a s....e. b y r.. -k.

h.d e ;.a.., c hea s e i.'...' i*a

  • e a 'i,'i

.3 v.. a... 4 e. s...,. o... -..,, #...a e n e*.

.....<,..c 1. a *.,.i n n -...

.h.....

  • .a.a.........a..

.e k.=.

. me...... 67.u..d.... r*..... i.

.d. k..ad ea ear e.a..a.c..a.ke e.

uc.a r.. d. t... < 'e.a..,.....a.....a t he.....d c a.

--ei.. e.

.a...e

h. h..

e' p. f.il. - as e.< = -. a.. > l. )

t a.. ;..... b i. -....... e

s.,,,... e. * *...a...e i n.i' b...b..e...a d s. -

a.e s.,.

i.n e..a s c.-... i. ).... -... s c.a" e. I n t me i.

e..a. 68.ar.

i. o

..a-.ac. i c..a

.ad r.<.8-.ad ( * ) *... -..d / * *.ct N.

.adoi...a........a.......ai.........<..r....a..ae.....r.....a.......

v i.a k.,.

es,.s v..-. a... a....,y (Aluch, aran are 1,ste.1 barren.)

.s a ee....... e,.. l..... u....a 2 7. UN!TED 11Ai[s 7 M DICA 2 3. N A.aat C' 6 *CTOs O-

. sw *__

.V av ST

..s_....a..........a, x,

p s.,a

...C._. _, c.,

2 a. N AW AND i r*it C# S'Gu t s (Type er prewr/

23. DAff SiCN D 2 8. NAant CF Cont'/ACiiNG Offitte (Typ, er peswij
29. DAf t 1 GNtD

[

O

/M d

f b 1-M/k o msCm.+

JOYCE PERLMAN

..............m.~........

, m,,,

s

  • d Page 2 of 7 e

NRC-10-81-697 ARTICLE I - BACKGROL$n The Local Public Document Rcom Branch within the Division of Rules and Records, Office of Administration, US Nuclear Regulatory Commission (NRC), is responsible for the overall establishment and maintenance of Local Public Document Rooms (LPDRs). The LPDR Branch recommends, develops, and implements programs, plans, objectives, and activities of local public document rooms, as well as coordinates the distribution of documents to LPDRs.

The LPDR program provides scientific and technical information relating to nuclear power plants. The document collections permit and encourage the free exchange of ideas'and criticisms by the general public in the licensing of nuclear power plant construction and operation.

The LPDRs currently are maintained by volunteers in local libraries and other e

facilities in the vicinity of nucl. ear generating power plants.

1 The LPD9 Branch is establishing a can, tract program to provide financial remuneration for services performed by the LPDRs and to insure that a uniform program of document maintenance and information service; is prcvided for LPDR patrons.

The services to be performed under this contract are discussed in Article III.

ARTICLE II - NRC RESPONSIBILITY Tiie NRC will p: ovide, normally on a weekly basis, the documents to be added to i

each local public document collection.

The NRC will provide file folders, binders,' labels, a log, postcards for reporting missing documents, envelopes for use in communicating with the NRC, and a User's Guide.

Also, the NRC, when notified by a library, will promptly replace any documents found missing from the local public document collection.

The NRC also will periodically visit each library which maintains a local public document collection to review the collection, correct any problems that may be l

noted, and to provide guidance and. instructions to the library staff.

ARTICLE III - SCOPE OF WORK The Contractor shall perform the following services relative to the maintenance and operation of the LPDR:

l l

A.

Filino and File Maintenance Properly file paper copy documents or microfiche received frcm the NRC 1.

within one week of receipt in accordance with the filing system provided To meet the particular needs of library patrons, this filing by the NRC.

deadline may be extended upon the expressed approval of the Chief, LPDR j

Branch, NRC.

l Refile documents or microfiche used by patrons within the next business 2.

, day.

l I

i NRC-10-81-697 o

Page 3 of 7 3.

Prepare file folders and folder labels when necessary.

4.

Maintain the local public document collection and NRC-furnished equipment as a physically unified collection.

5.

Report promptly to the LPDR Branch the identification of documents found or. reported to be missing frcm the collection.

B.

User Assistance 1.

Provide sufficient instructions to familiarize users with the filing system of the local public document collection, the collection's User's Guide, the indexing system used for paper copies and microfiche copies of the col.lection, and use of the microfiche reader printer.

2.

Provide users access to reproduction equipment for making paper copies of the collection.

C.

Administrative Services 1.

Insure that the microfiche reader printer is in good operating condition.

In the event that the equipment requires repair or servicing, the library staff shall arrange to have an aathorized service representative designated by the NRC service the equipment.

The invoice of charger should be foniarded to the NRC, and the agency will pay the cost of the servicing.

If the estimate of costs exceeds $100, the library staff should first contact tne Chief, 'JDR Branch, by calling the toll-free number, 800-638-8081.

2.

Prepare three quarterly reports and a final cumulative report in accordance with ARTICLE III, F.1.

3. Promptly inform the LPDR Branch of the NRC, either by the toll-free telephone number (800-638-8081) or in writing, of problems regarding the use or maintenance of the collection.

4.

Make available an NRC-furnished log which patrons may sign when using the collection.

D.

Scace Recuirements 1.

Provide adequate space to maintain the local public document collection in an orderly manner.

2.

Provide adequate space near the document collection to locate a microfiche reader printer, a table for the reader printer, and a microfiche file cabinet.

3.

Provide adequate reading space and lighting for u.sers to review the documents in the collection.

A NRC-10-81-697 Page 4 of 7 E.

Suoply Recuirements 1.

Maintain adequate supply of paper for the microfiche reader printer.

2.

Maintain adequate supply of electric lamps for the microfiche reader pri nter.

F.

Reportino Requirements 1.

Frecuency and Content A performance report will be submitted by the library to the NRC within twenty (20) days after the end of the first, second, and third contract qua rte rs.

In addition, the library shall submit a final cumulative report at the end of the contract year.

Each report shall includc an estimate of the number of people using the collection, frequency of use, the estimated number of copies made of documents, conditions of the collection and whether the filing is up to date, any significant problems which may have occurred in the mainter.ance and use of the document collectico, and any equipment maintenance which may have occurred during the period.

The format to be foilowed in submitting the quarterly and final reports is shown in Attachment A to this contract.

2.

Copies One copy of the report shall be submitted to the NRC Contracting Officer and one copy to the Chief, LPDR Branch.

ARTICLE IV - PERIOD OF PERFORMANCE The period of performance with respect to this contract shall commence on the date of execution of the contract and shall be in effect for one (1) year.

ARTICLE V - GOVERNMENT-FURNISHED PROPERTY The following Government equipment and materials shall be furnished to the Contractor for performance of the services required hereunder:

1.

3M "800" Microfiche Reader / Printer, Model 475AG, S/N 152461 (one (1) each).

2.

Vertical Visible Upright Cabinet for Cards and Microfiche, 4x6 size, 7-drawers, 40" high, 16" wide, 27" deep, with High Leg Base, Steel 12" high, Shaw-Walker Co Model C-1419 (one (1) each).

I e

m a

s.

HRC-10-81-697 Page 5 of 7 i,

3.

Reader-Printer Si+-Down Stand, 30" High, Top 36" x 30", Bell and Howell Catalogue No. 123002 (one (1) each).

4.

Lamps for Model "800" Microfiche Reader-Printer, 3M No. 78-8012-3601-5 (one (1) each).

i 5.

Dry Silver Paper, Type 795, 8-1/2" x 250" (4 rolls per carton) (one (1) ctn).

The NRC will furnish the initial box of paper and an extra lamp (items 4 and 5 ~

l above) for the microfiche reader-printer. Thereafter, responsibility for addi.tional l

paper and lamps rests with the library.

The NRC authorizes th'e library to charge j

for copies m3de on the reader-printer to recoup expenses for paper and lamps.

The NRC alst authorizes the library, without cost to the NRC, to install a coin-operated attachment to the reader-printer.

In either case, however, the cost'a library may charge for copies from microfiche may not exceed $0.25 per page copy unless it can demonstrate to the Chief, LPDR Branch, that operating costs l

require a higher per-page cost.

ARTICLE VI

- LIABILITY l

The Contractor assumes all risks and liabilities resulting from the use of l

the Government-Furnished Property herein enumerated in performance of the j

work as set forth herein.

The Contractor further agrees to hold harmless l

the Government, the Nuclear Regulatory Commission, including their officials, i

employees, or agents, for any liability to anyone arising out of or in l

connection with the use of said Government-Furnished Property during the performance of the work as set forth herein.

r ARTICLE'VII

- CONSIDERATION In full consideration of the Contractor's performance hereunder the NRC shall pay the Contractor the fixed price of $5,285.00.

~

i J

i

~

I

~

i

-e-.,

n n

,-.r----.

,,n,

,, - -,--., - m,,

nn,,..,

.,-~_-,,.w r-,,,w-

.w,,,, -,-

,-e rr.,n,-nme-,-+,-r,-,n-,-

,,w,

4

- NRC-10-81-697 Page 6 of 7 l

ARTICLE VIII - PAYMENT 4

' Payment shall be made in accordance with Clause 2 of the General Provisions entitled " Payments." Partial payments, in the amount of one-fourth of the agreed annual centract cost, shall be made upon submission and acceptance by the Chief, LPDR Branch, of the quarterly reports reiterated in ARTICLE III, F.1.

above; provided, however, that said payment (s) shall not be deemed to prejudice any rights which the Government may have by law or under other provisions of j

this contract.

ARTICLE IX - OBLIGATION 3

The amount presently obligated by the NRC with respect to this contract is

$ 5,285.00.

j ARTICLE X - PROJECT OFFICER e

~

Jona Scuder is hereby designated as the Contracting Officer's authorized representative (hereinafter called Project Officer) for technical aspects of this contra ct.

The Project Officer is not authorized to approve or request any action which results in or could result in an increase in contract cost; nor to terminate, or settle any claim or dispute arising under the contract; nor issue any unilateral directive whatever.

The Project Officer is responsible for:

1.

monitoring the Contractor's technical progress, including surveillance and assessment of performance, and recommending to the Contracting Officer changes in requirements; 2.

interpreting the scope of work; I

3.

performing technical evaluation as req'uired; 4.

performing technical inspections and acceptances required by this contract; and 5.

assisting the Contractor in the resolution of technical problems encountered l

during performance.

~

~

}

Within the purview of this authority, the Project Officer is authorized to review all costs requested for reimbursement by contractors and submit recommendations for approval, disapproval, or suspension for supplies /

services required under the contract.

The Contracting Officer is responsible for directing or negotiating any changes in terms, conditions, or amounts cited in the contract.

4

)

i

._.,.-,,-.-._..-_m.

,,__._y

...-m, v

ny<<, - - - -

b-NRC-10-81-697

-Page 7 of 7 l

L f

i For guidance from the Project Officer to the Contractor to be valid, it must:

l 1

1.

be consistent with the description of work set forth in this contract; j

2.

not constitute new assignment of work or change of the expressed tems-,

conditions, or specifications incorporated into this contract; 3.

not constitute a basis for an extension to the period of performance i

or contract delivery schedule; and 4.

not constitute a basis for any increase in the contract price.

+

ARTICLE XI - TRAINING The library shall have a staff person with the responsibility for maintaining j

the local public document collection participate in a two-day workshop to be i

held at NRC Headquarters in Bethesda, Maryland, or at one of tpe NRC. Regional l

Offices.

The workshop, currently being planned, will provide information i

regarding the NRC regulatory program, the licensing process, the NRC's computerized document control system, and specific details concerning the t

administration of the program for local public document collections. The charges for the workshop attendance will be negotiated at a later date and incorporated into this contract by modification.

The date and additional information concerning the workshop will be provided at a later time.

i ARTICLE XII

- GENERAL PROVISIONS l;

This contract is subject to the Fixed Price Research and Development Contracts Under $10,000.00, dated November 14, 1977, which incorporates the FPR Changes j

and Additions and NRC Additions, attached hereto and made a part hereof.

Clause 14 entitled " Patent Rights - Acquisition by the Government" is deleted in its entirety.

j ARTICLE XIII - ATTACHMENTS i

The following documents are attached hereto and incorporated herein by reference:

j A.

Report for NRC Local Public Document Collection (2 pages),

f B.

General Provisions, Fixed Price Research and Development Contracts Under

[

$10,000.00, dated November 14, 1977.

[

l t

I e

W

,M

Report For NRC Local public Document Collection f"

A.

Use of the Collection:

1.

Estimate of the frequency of use of the documents during the last quarter (i.e. number of persons using the ' collection per day, week, or month).

Comments:

2, Estimate how many copies of documen'ts were made during the quarter.

1)

From Paper Copies

(

s

2) From Microfiche B.

Condition of the LPDR Collection:

1.

Has filing been kept up-to-date (filed within one week of receipt.from flRC and within one business day af ter use by patrons)?

I.f not, what actions are being' taken, to maintain collection up-to-date?

s l

2..llave documents been reported missing during the quarter?

(Please indicate on attachment, if the NRC LPDR Branch has not been previously notified, i

any documents which are missing).

Attachment A

_2 6-C.

Equipment Maintenance:

List the cost of any maintenance of the microfiche reader / printer, the date of the service, and describe the problems requiring the service.

DATE PROBLEM COST 1

D.

Problems:

Please describe any significant problems which have occurred in the maintenance and use of the collection which have not been previously reported to the NRC and resolved.

s

/

Date Signature Title l

1.

.J