Marked-up Monthly Operating Rept for Oct 1978
ML20031C679
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/04/1978
From: Himebauch G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20031C677 List:
References
NUDOCS 8110070504
Download: ML20031C679 (4)


Text

-

OPERATING DATA REPORT DOCKET NO.

50-155 DATE 11/4/76 COMPLETED By GHimecauch 616-54T-6537 x 180 TELEPHONE OPERATING STATUS Notes

1. Unit Name: Bic Pork Point % 1en* m nnt October 1978
2. Reporting Period:

T 240

3. Licensed Thermal Power (MWt):

75

4. Nameplate Rating (Gross MWe):

72

5. Design Electrical Rating (Net MWe):

67

6. Maximum Dependable Capacity (Gross MWe):

D3

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

63

9. Power LevelTo which Restricted,1f Any (Net MWe):

Dryout Time

10. Reasons For Restrictions.If Any:

{

This Month Yr..to-Date Cumulative 1450 LVl& 0 156> C f 7 744 729'S 136,698

11. Hours In Reporting Period 10 7 5423 90,570.2
12. Number Of Hours Reactor Was Critical 0

0 o

13. Reactor Reserve Shutdown Hours 0

5377 7 94,494.6

14. Hours Generator On-Line U

U 0

15. Unit Reserve Shutdown Hours

_1.,444,605 U

1,089,821

16. Gross Thermal Energy Generated (MWH) 0 339,470 5,529,650 l
17. Gross Electrical Energy Generated (MWH) 0 320,821 5,234,435 l
18. Net Electrical Energy Generated (MWH) 0 74%

69%

19. Unit Service Factor 0

7%

o9%

20. Unit Availability Factor U

D9h 59%

4 1)os4 N

21. Unit Capacitj Factor (Using MDC Net)

DI) 56%

On T

1 f

22. Unit Capacity Factor (Using DER Net) 100%

21%

17, W since 1-1-74 1

l

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

Refueling

.ianuary 1979 - 8 weeks 11/5/78

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l l

l

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achie INITIAL CRITICALITY 4

f INITIAL ELECTRICITY COMMERCIAL OPERATION P

1 0/!

I 19/77) 8110070504 781104 DR ADOCK 05000

[O'h'/@lfl/

[1l(TCHf=

2; s

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-155 UNIT NAME Big Rock Point DATE Mnvember 1078 COMI'LETED BY nuimebanc.b REPORT MONill October 1978 1 - M 1-c. n l x 180 TELEPHONE "k

E

.! E h

Yk Licensee E g, kn.,

Cause & Corrective No.

Date g.

3g g

,c g 5 Event

T l

Action to

$E j di y Report

  • N0 0

Prevent Recurrence S

9-4-72 9

10/L'TS -

h 78-038 RB CRDRVE Control rod drive high temperature 10/31/78 [

7 14 [

A encountered thus operator initiated a manual Scram.

Control rod drive problems repaired.

I 2

3 4

F: Forced Reason:

Method:

Exnibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Resitiction 4-O:her (Explain) 0161)

E Operator Training & License Examination F-Administ rative 5

G-Operational Error (Ex ilain)

Exhibia I. 5:me Source 19/77)

Ilf)iher (E splain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-155 UNIT Big Ro.'k Point 11 IO DATE COMPLETED BY TELETHONE 616-Sh7-6537 x 180 October 1978 MONO!

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MW -Net)

I 17 2

18 3

b 19 4

A 20 5

21 6

2'

(

7 n

O

/

8 s

A 9

/.

10 26 b-II 27 A/

h 12 28

\\

13 29 14 30 t

i5 31 16 l

INSTRUCTIONS l

On this format. list the average daily unit power levelin MWe Net for each day in the reportmg month. Compute to j

the ne= rest whole megawatt.

(9/77 )

i

"4W-

~ N.,

Big Rock Point Nuclear Plant

,. v

~

Refueling Information Request 1.

Facility name:

BIG ROCK POINT NUCLEAR PLANT Scheduled date for next refueling shutdown:

2.

Mg 7

9

. i.o v i w Scheduled date fo'r restart followlng shutdown:

3.

MARCE' '1979-Will refueling or resumption of oper'ation thereaf ter require a technical 4.

specification change or other license amendment?

NO If yes,' explain. '

If no, has the reload fuel design and core configuration been reviewed by Plant Safety Review Committee to determine whether any unreviewed safety questions are associnted with the core reload (Ref.10CFR,Sec.50.59)?

YES If no review has taken place, when is it scheduled?

Scheduled date(s) for submittal of proposed licensing action and 5.

supporting informat ion:

~

Important licensing considerations associated with refueling, c'.g., new 6.

or dif ferent fuel design or supplier, unreviewed design or performance ana-lysis methode, significant changes in fuel design, new operating procedures:

l NOHE 84

spent fuel storage pool 62 7.

Number af fuel assemblies in:

core 193 fuel bundles Prusent licensed spent fuel storage capacity:

8.

Size of any increase in licensed storage capacity that has been requested or l

l is planned (in number of fuel assemblies):

l In planning stage and no firm number yet l

Projected date of the last refueling that can be discharged to spent fuel 9.

l' pool assuming the present licens d capacity:

c.A 1936

.