N
~
OPERATING DATA REPORT DOCKE1NO. 50-155 DATE 1/5/yft %
COMPLETED BY DM1 am hard TELEPHONE 616-547-6537 OPERATING STATUS Notes End of Cycle reactivity Big Rock Point Nuclear Plant coastdown began 12/24/78
- 1. Unit Name:
12/70
.. Reporting Period.
2h0
- 3. Licensed Thermal Po ver (MWt):
- 4. Nameplate Rating (Gross MWe):
k"
- 5. Design Electrical Rating (Net MWe):
57
- 6. Maximum Dependable Capacity (Gross MWe):
69
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
63
- 9. Paw r Level To Which Restricted.If Any (Net MWe. uel thermal hydraulic limits (dryout time)
- 10. Retons For Restrictions.lf Any:
b This Month Yr to-Date Cumulative i1. Hours in Reporting Period 138.163.0 7hh.0 8760.0 744.0 bd73.5 90,0M.7 i
- 12. Number Of Hours Reactor Was Critical 0
0.0 0.0
{
- 13. Reactor Reserve Shutdown Hours
- U N '#
- d
- 14. Hours Generator On-Line 0
no 17,721,550 5
- 15. Unit Reserve Shutdown Hours 144,92h.5 1.366.566.5 5,615,052.0
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 44,693.0,_,
h2h.672.0 5,314,663.3 42,106.O h01.0ho,h f8pmM 6 M ;
- 18. Net Electrical Energy Generated (MWH) 100%
77.8%
M, 6( & 4
- 19. Unit Service Factor 100%
77.8%
56.5%
- 20. Unit Availability Factor W 0;'
71 1%
53.4%
- 21. Unit Capacity Factor (Using MDC Net) 78.6%
63.6%
17.1%*sincTe1/1/74
- 22. Unit Capacity Factor (Using DER Net) 0%
17.ON
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6, Months (Type. Date, and Duration of Each1:
February 1979 - refueling - 8 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY
[
COMMERCIAL OPERATION
(
i (9/77) fjj007052yfff R
ADOCK ogo l
Ph
o UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
~
Di6 im s ivint UNIT NAME DATE 1/5/79 REPORT MONT11 12/78 COMPLETED BY Dpn1 nnch eirri 1 -2*F'dJ8 TELEPHONE "i
c r.
.3 en :
~.
.2 _e 8
y.c ~4 Licensee
$1 5*L Cause & Corrective g"
No.
Date g
gg
,3 g y Event sT a
Aci;., go 53 5, jig Report #
N0 d
Prevent
.urrence 6
4 NONE NONE NONE NONE NONE NONE NONE NONE 1
I 2
3 4
F: Forced Reason:
Method:
" Exhibit G Instructions S: Scheduled A Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry S' sects for Licensee C Refueling 3 Automatic Scram.
Eve.it Report (LER) File iNUREG-D-Regulatory Restriction 4 01her (Explain)
L161)
E-Operator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9fi7) 11 Other (Expl.N
~
I AVERAGE DAILY UNIT POWER LEVEL 50-155 DOCKET NO.
Big Rock Point WIT 1/5/79 DATE DPBlanchard COMPLETED BY TELEPHONE
~
12/70 MONM DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 57 3
37 57 2
-58 gg 56 58 g,
3 58 56 4
58 5
21 56
=
5 56 6
22 56 7
57 23 56 57 8
EI 56 9
23 56 10 26 55 II 57 27 55 57 28 12 57 13 29 55 14 30 55 54 15 57 3g 16 57 INSTRUCTIONS l
On this format. list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
191771 l
,