ML20031C363

From kanterella
Jump to navigation Jump to search
Forwards AO-16-74.Detailed Event Analysis Encl
ML20031C363
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/13/1974
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20031C364 List:
References
10254, NUDOCS 8110070087
Download: ML20031C363 (2)


Text

-

ng m n

- n.

7. - --

~'

'R':d. '.u$..'?. 2. O..:W } l, ? ?.;.:;-.k.'""

':. ! ~ # '

n

.s

'i

. wz,.

.,u.

]-

i. 4,0'; ry

, _ j f, e

y s

. :.R' yd c ' ' j

~ ' ' ~,

A'l'9;? EU  % %;s~J

  • i
2. G c

! al)12,

7 70 MM

.{

~.,,-./

6:2

y.,,..

. ;g.,

u es W -,

~

.j "MA4 * '.

y,

3 :u

,1/ OgA.

.{.

e

..o

+

o.,

. o..i m w..e w.e%.o 4

. e.oo, w :%.a 4 2oi.u co.. m n..osso

~'>J A

--a-,._..,.o-75

.c*,

s i

,, a,, -,.,

m.

2; L

'< June 13, 19741-.

,i W

.F

,b i

g

, 1,,

.' 76 - 3

~'

J-!

+

zgp.je-1 j

Q.$$.4. ss.*

9 ft "

+

N g

<.\\

,Re:

Mr. John F. O' Leary, Director

/.9 Docket 50-155 Directorate c.* Licensing

. License DPR-6 l

US Atomic Energy Commission Big Rock Point Washington, DC 20545 A0-16-74

Dear Mr. O' Leary:

Attached is Abnorr.a1 Occurrence Report A0-16-74 covering the control rod drive withdrawal timing.

Yours very truly, Ralph B. Seve11 (S1 ned) 6 RBS:mel Ralph B. Sevell Nuclear Licensing Administrator CC: JGKeppler, USAEC l

t l

1 A19.

-.)

1 l

l l

hA l

gJ-N i

r-m m==omAw4. m m g-r;m w-mm.mo

(

8110070007 y h 5 PDR ADOCK PDR S

1 l

l

s 4

ABNORMAL ?CCURRENCE REPORT

/ oa5W' Big Rock Point Plant 1.

Report No: A0-17-Th, Docket 50-155.

2.

a.

Report Date: June 13. 197h b.

Occurrence Date: June 3 1974 3.

Facility: Big Rock Point Plant.

4.

Identification: Control rod withdrawn time less than 23 seconds on three drives.

5 Condition Prior to Occurrence: Plant in hot standby condition to conduct drive timing tests during shutdown of unit.

6.

Description of Occurrence: The drive timing was being conducted in an attempt to further define the cause of previous timing deficiencies. The system temperature was at approximately 400 degrees Fahrenheit and the rod drive supply vater at approximately seventy-five degrees Fahrenheit. Three drives timed at less than 23 seconds for full withdrawal stroke.

7.

Analysis of Occurrence: Our analysis and hazards considerations remain as outlined in the letter of Sewell to O' Leary on 5-1-74.

8.

Designation of Cause: Exact cause remains unknavn.

9 Corrective Action: The control rod drives withdrawal rate set valves vill be adjusted and the drives retirad in both the cola and the hot conditions prior to and during the next start-up.

Percanent corrective actions are as outlined in the above-mentioned 5-1-Th letter.

10.

Failure Data: Refer to A0-3-Th (April 3,197h) and A0-13-Th (May 15. 1974).