Monthly Operating Rept for Oct 1979
ML20031C267
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/05/1979
From: Himebauch N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20031C266 List:
References
NUDOCS 8110070009
Download: ML20031C267 (4)


Text

_ _ _

.s OPERATING DATA REPORT DATE COMPLETED BY NHimebauch TELEPHONE 616-547-6537 x180 OPedAT_NG STATUS Notn

1. Unit Name:

Bic Rock Pnine P1nne All internals recon-

2. Reporting Period: October 1979 stituted and reactor vessel

[

3. Licensed Thermal Power (MWt):

740 has been installed. Power 75 operation expected to begin

4. Nameplate Rating (Gross MWe):

72 in early November.

5. Design Electrical Rating (Net MWe):

07

6. Maximum Dependt.Me Capacity (Gross MWe):

63

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

63

9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

"k This Month Yr to.Date Cumulative 745.0 7296.0 145459.0 i1. Houn In Reporting Period 0.1 778.2 98804.9

12. Number Of Hours Reactor Was Cr.tical 0

0 0

13. Reactor Reserve Shutdown Hours 0

773.7 96710.7

14. Hours Generator On-Line 0

n n

15. Unit Reserve Shutdown Hours 0

1ggggg_a i7ggggig_q__

16. Gross Thermal Energy Generated (MWH) 0 4?nin_o 96s7nA? n
17. Gross Electrical Energy Generated (MWH) 0

~39335,i g353qqg,6

18. Net Electrical Energy Generated (MWH) 0 iO.6%

66.5%

19. Unit Service Factor 0

10.6%

66.5%

20. Unit Availability Factor 0

8.6%

54,2%

21. Unit Capacity Factor (Using MDC Net) 0 7.5%

51.1%

22. Unit Capacity Factor (Using DER Net) 100.0%

84.M 25.3%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

Mannear 9 1070

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Conimercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL O 'ERATION i

okkh5 DOC PDR

\\

UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.

50-155 UNIT NAME Bie Rock Point Plant DATE November 5. 1979 COMPLETED BY _ NHimebauch RENsRT MONT11 October 1979 TELEPHONE 616-547-6537 x 180 w.

E E

w

.! ?

}

jY}

i Licensee

$g g,,

Cause & Corrective No.

Date g

3g jgg Event p

g}

6.

A6 tion to E

$5 5

jiji g Report Jr mO H

Prevent Recurrence 6

3 10/1/79-10/31/79 G

745 A

3 CA ZZZZZ Shutdown continuted from September 1979 (Reactor vessel repairs have been completed - documentation and necess ary surveillance tests, etc. are in prop ress),

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain)

1. Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Ueensee C. Refueling

3. Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & ljcense Examination F. Administrative 5

Goperational Error (Explain)

Exhibit I-Same Source 19/77) ll Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-155 UNIT Big Rock Point November 5, 1979 DATE COMPLETED BY 58 %h a > >ch TELEPHONE 616-547-6537 x 180 October 1979 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17

'l 2

18 3

19 4

20 5

21 6

22

('

7 23 8

24 9

25 10 26 II 27 12 28 13 29 14 30 V

15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting'onth. Compute to the nearest whole rnegawatt.

(4f771

co Refueling Information Request

1. -Facility name:

Big Rock Point N6 clear Plant 2.

Scheduled date for next refueling shutdown:

In Progress 3.

Scheduled date for restart following shutdown:

November 1979 Will refueling or resumption of operation thereaf ter require a technical 4.

specification change or other license amendment?

No If yes, explain.

If no, has the reload fuel design and core configuration been reviewed by Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10CF.1,Sec.50.59)?

Yes If no review has taken place, when is it scheduled?

5.

Scheduled date(s) for submittal of proposed licensing action and supporting information:

None 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance ana-lysis methods, significant changes in fuel design, new operating procedures:

None 7.

Number of fuel assemblies in: core 84

spent fuel storage pool 88 8.

Present licensed spent fuel storage capacity: 193 Size of any increase in licensed storage capacity that has been zequested or is planned (in number of fuel assemblies):

248 Projected date of the last refueling that can be discharged to spent fuel 9.

pool assuming the present licensed capacity:

q

.4q 1983

.?

.. $J

' hh