9 YANKEE ATOMIC NUCLEAR POWER STATION MONTIILY STATISTICAL REPORT 76-6 FOR Tile MONTli 0F JUNE, 1976 8110060613 760706 PDR ADOCK 05000029 R
iAPPENDIX'C
- 50-29 pATE 76070r,.
DOCKL'l. NO.
wg_
Yankee Rowe OPERATING PLAhT DATA IIP:1T KUiB COMPLETED BY' E. C. TARNUZZER TELEPHONE
.(617)' 366-9011 X 276 R P.E R A l l N g S I A l y S 1
1.
REPORTINC PERIOD:
June 1976 GROSS HOURS 'IN REPORTING PERIOD 720
~
2 2.
CURRENTLY AUT110RIZED POWER ' LEVEL MWt -
600'
- MAX. DEPEND. CAP. (MWe-NET) 175 DESIGN ELECTRICAL RATING (MWe-NET).
17S 3.-
POWER LEVEL TO UHICH RESTRICTED (IF ANY):
None.
4.
' REASONS FOR RESTRICTIONS.(IF ANY):
THIS CUFPJLATIVE-MONni YR-TO-DATE TO DATE
.720
'3589 112,9S6=
5.
HOURS REACTOR WAS CRITICAL 0
0 0
6.
REACTOR RESERVE SIIUTDOWN 110URS 729:
3510 108,966 7.
HOURS GENERATOR ON-LINE 0
0
.0
'8.
UNIT RESERVE SHUTD0hH liOURS 9.
GROSS THERMAL POWER GENERATED (MWH) 420,275 1,809,931 57,459,018 10.
GROS 3 ELECTRICAL.PONER GENERATED (Mull) 132,350 567,142 17,632,694 11.
NET ELECTitICAL PONER GENERATED (MWil) 125,149 530,801 16,5Ps,963-100.0 82.2 12.
REACTOR SERVICE FACTOR 100.0 82.7 80.7 13.
REACTOR AVAILABILITY FACTOR 100.0 80.4 79.5 14.
UNIT SERVICE FACTOR 100.0 90.7 15.
UNIT AVAILABILITY FACTOR 99.3 69.5 71.7 16.
UNIT CAPACITY FACTOR -(USING MDC) 99.3 69.5 71.7 17.
UNIT CAPACITY FACTOR (USING DESIGN MWe) k 0.0 13.2 18.
UNIT FORCED OUTAGE RATE 19.
SIIUTDOWNS SCilEDULED TO BEGIN IN NEXT 6 MONT!!S. (STATE TYPE, DATE AND DURATION 9
0F EACil):
2 0.. IF;Sl!UTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
M
DOCKET NO.
50-29
""I'"" E ""
UNIT NAME 760706 DATE COMPLETED BY E. C. TARNUZZER APPENDIX D TELEP110NE (617) 366-9011 X 2 6 UNIT SilUTDOWNS AND POWER REDUCTIONS
. REPORT MONIll June 1976 i
TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SCIIEDULED (l!OURS)
REASON (1)
TIIE REACTOR, (2)
CORRECTIVE ACTIONS / COMMENTS O
760628 S
B Load reduction to 130 MW for turbine throttle valve surveillance testing.
(f. T h ocD.
SUbDIARY:
On June 3 the reactor power limitation was removed and power was increased to essentially 100*a for the remainder of the period.
Rev. 10/75
APPEND 1X B e
DOCKET NO.
50-29
. UNIT Yanhec Rowe DATE
~ 760706'-
COMPLETED BY E. C.'TARNUZZER TELEPHONE
'(617) 366-9011.X2761-AVERAGE DAILY UNIT POWER LEVEL
' MONTH
' June 1976-DAY.
AVERAGE DAILY MWe-net' DAY AVERAGE DAILY MWe-net i
157 16 174
?
2 158 17 175 3
166 18-
'174
~
4 175 19 174 g
1 5
175 20 173 175 21 173 6
174 22 174 7
174 23 173 8
173
^
175 24 9
174 175 25 10 174 174 26 11 174 174' 12 27 169 175 28 13 174 174 29 14 174 174 30 15
~~~
31 Rev. 10/75