e 1

I I

I YANKEE ATO>lIC !;UCLiL\\R POER STATION MONTifLY STATISTICAL REPORT 76-3 FOR Tile MONTli 0F M\\RCil,1976 0110060608 760406 PDR ADOCK 05000029 R

PDR

API'liNillX B e

DOCKET NO.'

50-29 UNIT YANKl!E ROWE 760406 DA'. E COMPLETED BY E. C. TARNUZZER TELEPil0NE (617) 366-9011 X213 AVERAGE DAILY UNIT POKER LEVEL MONTH March 1976 DAY AVERAGE DAILY MWe-not DAY AVERAGE DAILY MWe-net 1

143 16 142 2

142 17 146 3

142 18 153 4

142 19 147 5

142 20 134 6

142 21 151 7

142 22 155 8

142 23 156 9

142 24 155 10 142 25 155 11 142 26 155 12 142 27 133 13 142 28 102 14 142 29 0

15-142 30 0

31 0

Rev. 10/75

i Af'5iNDIX C

' l()CKliT NO.

50-29 DATE 760106 llNIT NAMil YANKEli ROW!i OPI: RATING PLANT DAYA COMPl.ETED BY E. C. TARNUZZi!R TI:1.liPil0NE (617) 366-9011 X.013 E P.E E A 1 1 N E E I ^ I U g 1.

REPORTING PERIOD: March 1976 GROSS 110URS IN REPORTING PERIOD 744

\\

2.

CURRENTLY AUTIIORIZED POWER LliVEL MW't 600 MAX. DEPEND. CAP. (MWe-NET) 175 DESIGN ELECTRICAL RATING (MWe-NET) 17S 3.

POWER LEVEL TO WilICil RESTRICTED (IF ANY):

524 MWt 4.

REASONS FOR RESTRICTIONS (IF ANY): Peak linear heat rate limit to comply with ECCS performance criteria of 10CFR50.46.

TIIIS CUMULATIVE MONTil YR-TO-DATE TO DATE 5.

HOURS REACTOR WAS CRITICAL 722 1,724 111,122

6.. REACTOR RESERVE SHUTDOWN HOURS 0

0 0

j 7.

HOURS GENERATOR ON-LINE 664 1,655 107,111 S.

UNIT. RESERVE SHUTDOWN 110URS 0

0 0

9.

GROSS THERMAL POWER GENERATED (MWil) 325,953 786,801 56,435,8S9 i0.

GROSS ELECTRICAL POWER GENERATED (MW11) 103,286 249,031 17,314,583 11.

NET ELECTRICAL POWER GENERATED (MWil) 96,432 232,324 16,202,487 12.

REACTOR SERVICE FACTOR 97.1 78.9 81.2 13.

REACTOR AVAILABILITY FACTOR 100.0 79.9 80.6 5

14.

UNIT SERVICE FACTOR 89.3 75.8 79.4 15.

UNIT AVAILABILITY FACTOR 89.3 96.3 16.

UNIT CAPACITY FACTOR (USING MDC) 74.1 60.8__

71.6 17.

UNIT CAPACITY FACTOR (USING DESIGN MWe) 74.1 60.8 71.6 10.7 24.2 1.5 I P,. UNIT FORCED OUTACE RATE

+

19.

SilUTDOWNS SCllEDULED TO BEGIN IN NEXT 6 MONTilS (STATE TYPE, DATE AND DURATION OF EACil):

NONE i

20.

IF SilUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTllP:

760401

DOCKET NO.

30-29 UNIT NAME YANKEE R0hli I

DATE 760406 4

COMPLETED BY E'.~ C. TAitNUZ2ER APPENDIX D TELEF110NE (617) 366-9011 X 213 UNIT SilUTDOWNS AND POWER REDUCTIONS REPORT MOKril March 1976 i

TYPE MET 110D OF i

F-FORCED DURATION SilUTTING DOWN i

60.

DATE S-SCHEDULED

(!!OURS)

REASON (1)

Tile REACTOR, (2)

CORRECTIVE ACTIONS /CO5NENTS 76-3 760328 F

continuing A

3 Generator exciter shaft failure 1

1 4

SUMMARY

Plant operating at 821 full load at the beginning of the month.

Power raised to 87%

3 on the 17th and remained at that level until generator exciter shaft failure on the 28th.

Replacement on site and' installed at months end.

Preparations being made for startup.

J Rev. 10/75

-