e YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 75-11 FOR THE MONTil OF NOVEMBER, 1975 i
a s
J
~8110060600 751205 PDR ADOCK 05000029 R
- e-m.
_____.-.-_____m___._________________.________.__._..-...._._...____m_._._________m.___m_m_.____m,.m_mm.___
APPENDIX B DOCKET NO.
50-29 UNIT Yankee Rowe DATE 751205 COMPLETED BY E. C. Tarnutzer TELEPHONE (617) 366-9011 X213 AVERAGE DAILY UNIT POWER LEVEL MONTH November 1975 DAY AVERAGE DAILY MWe-net DAY AVERAGE DAILY MWe-net 1
16 2
17 3
18 4
19 5
20 6
21 No net generation during entire period.
22
/
8 23 9
24 10 25 11 26 12 27 13 28 14 29 i
- 30 15 31 Rev. 10/75 l
L
~ -.
Al'I'ENDIX C
~
DOCKET NO.
50-29 DATE d51205 UNIT NAME Y:nkoa R:w2 OPERATING PLANT DATA COMPLETED BY E. C. TARNUZZER TELEP110NE (617) 366-9011 X213 E P ygfllN E SI AIU1
- 1., REPORTING PERIOD: November 1975 GROSS !!0URS IN REPORTING PERIOD 720 2.
CURRENTLY AUT110RIZED POWER LEVEL MWt 600 MAX. D$ PEND. CAP. (MWe-NET) 175 DESIGN ELECTPICAL RATING (MWe-NET) 175 3.
POWER LEVEL TO WHIGI RESTRICTED (IF ANY):
about 80%
i.
REASONS FOR P.ESTRICTIONS (IF ANY):
Peak linear heat rate limit to comply with ECCS performance criteria of 10CFR50.46.
1111 S CUMULATIVE MO. Vill YR-TO-DATE TO DATE
'5.
Il0URS REACTOR WAS CRITICAL 0
6.919 108.927 6.
REACTOR RESERVE SIIUTDOWN 110URS 0
0 0
7.
Il0URS GENERATOR ON-LINE O
6,898 105.137
'8.
UNIT RESERVE SliUTDOWN If0URS 0
0 0
9.
GROSS THERMAL POWER GENERATED (MWil) 0 3,895,219 55,523,866 10.
GROSS ELECTRICAL POWER GENERATED (Mh11) 0 1,232,064 17,026,511 11.
NET ELECTRICAL POWER GENERA % (MWil) 0 1,157,494 15,934,236 12.
REACTOR SERVICE FACTOR 0.0 86.3 86.3 13.
REACTOR AVAILABILITY FACTOR 0.0 86.3 86.3 14.
UNIT SERVICE FACTOR 0.0 86.1 79.7 15.
UNIT AVAILABILITY FACTOR 0.0 86.1
? ). 7 16.
UNIT CAPACITY FACTOR (USING MDC) 0.0 82.5 72.1 17.
UNIT CAPACITY FACTOR (USING DESIGN MWe) 0.0 82.5 72.1 18.
UNIT FORCED OUTAGE RATE 0.0 0.2 1.0 19.
SilUTDOWNS SCilEDUI.ED TO BEGIN IN NEXT 6 MONTilS (STATE TYPE, DATE AND DURATION OF EACil):
None.
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STAR 111P:
751212 Rev. 10/75
DOCKET NO.
50-29 5
UNIT NAME Ycnkco Rowa DATE 751205 COMPLETED BY E. C. TARNUZZER APPENDIX D TEI.EPIIONE (617) 366-9011 X213 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONn{
November 1975 TYPE M5Til0D OF F-FORCED DURATION SIRTITING DOWN NO.
DATE S-SCllEDULED (l!OURS)
REASON (1)
Tile REACTOR, (T, CORRECTIVE ACTIONS /C0felENTS 75-6 751017 S
Continu-C 1
Continued refueling 6 maintenance outage ing throughout the report period.
SU5SIARY:
The refueling and mainterance outage which comenced October 17 continued through November.
Plant should be returned to service during the week 9f December 12.
Rev. 10/75