4' d'

e i

YANKEE _ ATOMIC NUCLEAR POWER STATION I

MONTHLY STATISTICAL REPORT 75-10 l

i FOR THE MONTH OF OCTOBER, 1975 e

O

,hw_

e s em *

  • e

?

e w mem **

M. emy,m,w p'

'W-y, e 89 F

- M ee 4

. m-._ _

e e

4 8110060596 751106' PDR ADOCK 05000029 R

PDR

. m.

. m r--

APPENnIX B DOCKET NO.

50-29 UNIT Yankee Rowo DATE 751106 COMPLETED BY E. C. Tarnazzer TELEP110NE

('617) 366-9011 X 213 AVERAGE DAILY tlNIT POWER LEVEL MONTil October 1975 DAY AVERAGE DAILY MWe-net DAY AVERAGE DAILY MWe-net 1

138 16 130 2

137 17

__129..

3 136 18 31.5 4

137 19 5

__ 136 20 6

135 21 7

134 22

~

9 133' 24 25 10 132 133

...__... 2 6 11 12 133 27 13 133 28 14 132 29 15 130

. 30 31 Rev. 10/75

a.

APPENDIX C DOCKET NO.

50-29 DATE 75I106 UNIT NAME Yankee Towe OPERATING PLAFE DATA COMPLETED BY E. C. TARNUZZER TELEPHONE (617) 366-9011 X213 Q P EE AllN E SI AIU S 1.

REPORTING PERIOD:

October, 1975 GROSS Il0URS IN REPORTING PERIOD 745 2.

CURREPRLY AUT110RIZED POWER LEVEL MWt.

600 MAX. DEPEND. CAP.'(MWe-NET) 175 DESICN ELECTRICAL, RATING (MWe-NET) 175 3.

POWER LEVEL TO WilICH RESTRICTED (IF ANY):

NONE 4.

REASONS FOR RESTRICTIONS (IF ANY):

, //-17"N

'lilIS CUMULATIVE MON'111 YR-T0_-DATE TO DATE 419.08 6,918.98 108,926.48 5.

HOURS REACTOR WAS CRITICAL 0

0 O

6.

REACTOR RESERVE SilUTDOWN ll0URS

.3 M A D V 4t t t)6 6,898.38 105,136.79 7.

HOURS GENERATOR ON-LINE 0

0 0

8.

UNIT RESERVE S!!UTDOWN HOURS 9.

GROSS THERMAL POWER GENERATED (MWH) 192,490.08 3,895,219.31 55,523,866.21 10.

GROSS ELECTRICAL POWER GENERATED (MWH) 59,438 1,232,064 17,026,511 11.

NET ELECTRICAL POWER GENERATED (MWH) 55,277.1 1,157,494.3 15,934,235.8 56.3 94.8 81.8 12.

REACTOR SERVICE FACTOR 56.3 94.8 81.8 13.

REACTOR AVAILABILITY FACTOR 55.7 94.6 80.1 14.' UNIT SERVICE FACTOR 55.7 94.6 80.1 15.

UNIT AVAILABILITY FACTOR 42.4 90.7 69.4 16.

UNIT CAPACITY FACTOR (USING MDC) 42.4 90.7 69.4 17.

UNIT CAPACITY FACTOR (USING DESIGN MWe) 0.0 0.2 1.0 18.

UNIT FORCED OUTAGE RATE 19.

SIRTfDOWNS SCHEliULED TO BEGIN IN NEXT 6 MONTHS (STATE *IYPE, DATE AND DURATION OF EACH):

None.

End of Nc,w.nber.

20.

IF SHUTDOWN AT END OF REPORT PERIOD,' ESTIMATED DATE OF STARTUP:

~

~

DOCKET NO, S0-29 i_

UNIT NAME Yankee Row]

~

DATE 751106

\\

COMPLETED BY E. C. TARNUZZdR APPENDIX D TELEP110NE (617) 366-9t.11 X 213 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MON'DI f

T(PE ME1110D OF F-FORCED DUPATION SIRnTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

TIIE REACTOR, (2)

CORRECTIVE ACTIONS / COMMENTS 7S-9 7S1018 5

329.92 C

Al SUmfARY:

The plant was shutdown on 10-18-7S for Core XI - XII refueling, 5 week out is planned.

Rev. 10/7S