Monthly Operating Rept for Apr 1975
ML20031C152
Person / Time
Site: Yankee Rowe
Issue date: 05/05/1975
From: Tarnuzzer E
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20031C150 List:
References
75-4, NUDOCS 8110060588
Download: ML20031C152 (4)


Text

,

q 9

s YANKEE' ATOMIC NUCLEAR POWER STATION i

_, '~

MONTLY STATISTICAL REPORT 75-4 3,

FOR rHE MONTH OF APRIL,197S i

t 9

i-a

.t-s 4

4 8110060588 750505 PDR ADOCK 050000?9 R

PDR

YANKEE ROWE Uff1T NAME DATE 750505 COMPLETED BY E. C. TARNUZZER TELEPHONE (617)366-9011 X2585 OPERATING STATUS 1.

REPORTING PERIOD:

750.:01 THROUGH 750430 GROSS HOURS IN REPORTING PERIOD:

720 2.

CURRENTLY AUTHORIZED POWER LEVEL MIt 600 MWe-NET 175 3

POWER LEVEL TO WHICH RESTRICTED (IF ANY):

NONE 15 REASONS FOR RESTRICTIONS (IF ANY):

4 p @ it-0-7I.

THIS

~

CUMULATIVE MONTH YR-10-DATE 10 DATE 720 2862 104870

5. HOURS REACIOR WAS CRITICAL......

6.

REACTOR RESERVE SHUTDOWN HOURS....

720 2855 101093 t

7 HOURS GENERATOR ON-LINE.......

1 8.

UNIT RESERVE SHUIDOWN HOURS.....

9 GROSS THERMAL POWER GENERATED (MWH).

418,859 1,655,670 53,284,336

10. GROSS ELECTRICAL POWER GENERATED (MWH) 133,726 528,731 16,323,178

+ M,8sf f 'f974'fl

+ i<,774, 2.t3

11. NET ELECTRICAL POWER GENERATED (FE).

125,255 496.942 15.273.683

12. REACIOR AVAILABILITY FACTOR......

100.00 99.43 81.46 1

13 UNIT AVAILABILITY FACTOR.......

100.00 99.17 79.75 Ils. UNIT CAPACITI FACIOR.........

99.42 98.6.5 72.03 0.00 0.00

15. !TIIT FORCED OUTAGE RATE.......

l

'16 SHUTDOWNS SCHEDULED TO BEGIN IN NEIT 6 NDNTHS (STATE TIPE, DATE AND DURATION OF EACH): A SIX WEEK REFUELING OUTAGE COMMENCING THE 3RD WEEK i

IN OCTOBER, 1975.

t 17 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N.A.

6

_._._,.._-_.._-_...,,s m,,.

.._m,

,_m...

1-W :ARY:

Ti!E PLANT OPERATED AT RATED CAPACITY Tile ENTIRE MONTil.

l UNIT NAME YANKEE ROWE l

SURVEILLANCE TESTING ACCOUNTED DATE

  • 750505 l

FOR ONE MINOR LOAD REDUCTION.

CCHPLETED BY E. C. Tarnuzzei e.

a APRIL 1975-f REPORT MONTH 1,

l PLANT SHUTDOWNS METHOD OF

~

TYPE F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

COMMENTS i

o t

.)

i il eI

~

.,s 7 Q. T 7

,T. 7 '.,. 7

I av e.

e 4

I b

I I

I E

I f

m.ememar vo

'*,.5.

a-UNI'5 YANKEE R0WE DATE 750505 COMPLETED BY E. C. TARNUZZER DAILY PLANT PWER OUTPUT MONTil APRIL 1975 DAY AVsRAGE DAILY It7e-net DAY AVElati)QAILY IMe-net 1

175 25 175 2

175 26 175 3

175 27 175 4

175 28 175 5

175 29 171

.6 175 30 '

175 7

175 31 a

8 175 9

175 10 175 11 175 12 175 '

13 175 14 175 15' 175 16 175 17 175

. 18 175

~

19 175 20 175 21 175 22 175 23 175 24 g