Text
,
q 9
s YANKEE' ATOMIC NUCLEAR POWER STATION i
_, '~
MONTLY STATISTICAL REPORT 75-4 3,
FOR rHE MONTH OF APRIL,197S i
t 9
i-a
.t-s 4
4 8110060588 750505 PDR ADOCK 050000?9 R
YANKEE ROWE Uff1T NAME DATE 750505 COMPLETED BY E. C. TARNUZZER TELEPHONE (617)366-9011 X2585 OPERATING STATUS 1.
REPORTING PERIOD:
750.:01 THROUGH 750430 GROSS HOURS IN REPORTING PERIOD:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL MIt 600 MWe-NET 175 3
POWER LEVEL TO WHICH RESTRICTED (IF ANY):
NONE 15 REASONS FOR RESTRICTIONS (IF ANY):
4 p @ it-0-7I.
THIS
~
CUMULATIVE MONTH YR-10-DATE 10 DATE 720 2862 104870
- 5. HOURS REACIOR WAS CRITICAL......
6.
REACTOR RESERVE SHUTDOWN HOURS....
720 2855 101093 t
7 HOURS GENERATOR ON-LINE.......
1 8.
UNIT RESERVE SHUIDOWN HOURS.....
9 GROSS THERMAL POWER GENERATED (MWH).
418,859 1,655,670 53,284,336
- 10. GROSS ELECTRICAL POWER GENERATED (MWH) 133,726 528,731 16,323,178
+ M,8sf f 'f974'fl
+ i<,774, 2.t3
- 11. NET ELECTRICAL POWER GENERATED (FE).
125,255 496.942 15.273.683
- 12. REACIOR AVAILABILITY FACTOR......
100.00 99.43 81.46 1
13 UNIT AVAILABILITY FACTOR.......
100.00 99.17 79.75 Ils. UNIT CAPACITI FACIOR.........
99.42 98.6.5 72.03 0.00 0.00
- 15. !TIIT FORCED OUTAGE RATE.......
l
'16 SHUTDOWNS SCHEDULED TO BEGIN IN NEIT 6 NDNTHS (STATE TIPE, DATE AND DURATION OF EACH): A SIX WEEK REFUELING OUTAGE COMMENCING THE 3RD WEEK i
IN OCTOBER, 1975.
t 17 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N.A.
6
_._._,.._-_.._-_...,,s m,,.
.._m,
,_m...
1-W :ARY:
Ti!E PLANT OPERATED AT RATED CAPACITY Tile ENTIRE MONTil.
l UNIT NAME YANKEE ROWE l
SURVEILLANCE TESTING ACCOUNTED DATE
- 750505 l
FOR ONE MINOR LOAD REDUCTION.
CCHPLETED BY E. C. Tarnuzzei e.
a APRIL 1975-f REPORT MONTH 1,
l PLANT SHUTDOWNS METHOD OF
~
TYPE F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
COMMENTS i
o t
.)
i il eI
~
.,s 7 Q. T 7
,T. 7 '.,. 7
- I av e.
e 4
I b
I I
I E
I f
m.ememar vo
'*,.5.
a-UNI'5 YANKEE R0WE DATE 750505 COMPLETED BY E. C. TARNUZZER DAILY PLANT PWER OUTPUT MONTil APRIL 1975 DAY AVsRAGE DAILY It7e-net DAY AVElati)QAILY IMe-net 1
175 25 175 2
175 26 175 3
175 27 175 4
175 28 175 5
175 29 171
.6 175 30 '
175 7
175 31 a
8 175 9
175 10 175 11 175 12 175 '
13 175 14 175 15' 175 16 175 17 175
. 18 175
~
19 175 20 175 21 175 22 175 23 175 24 g
S J